1910Year Built
1Stories
M1Building Class
R6BZoning
6,800 sfGross Floor Area
1Units
11 Open Violations 9 unresolved · 2 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: 306 6TH AVE LLC · 7,200 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ElectricalMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 2 filings · 20 docs
Floor 2Under Construction1 filing · 20 docs
Floor 1Under Construction3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
306 6TH AVE809/13/2026
MESH ARCHITECTURES1309/13/2026
LAKHI GENERAL CONTRACTOR203/22/2026
MISSIONFORTODAYHOLYTABERNACLE603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2023$7.5M—Private party → 306 6TH AVE LLC$1,103/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION908/17/2026
H & O ENGINEERING, DPC808/14/2026
URBAN ENGINEERING, PC110/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THE GREEN STUDIO103/21/2026
THE VILNITS GROUP LLC203/21/2026
EXPEDITE DEM1203/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DM80 SOLUTIONS LLCGeneral Contractor508/21/2026
MC SUPERSTRUCTURE INCGeneral Contractor508/20/2026
SAFETECH ENTERPRISES CORPGeneral Contractor303/21/2026
EMPIRE STATE ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H & O ENGINEERING, DPC5595406/01/2026
URBAN ENGINEERING, PC2575110/24/2023
Building Lifecycle
All (96)Filed (18)Permit Issued (11)Signed Off (1)Violation (45)Inspection (5)Objection (8)Special Inspection (8)
08/20/2026
Permit issued — Full Demolition
B01189961-I1-FD
08/18/2026
Permit issued — Sidewalk Shed
B00926193-I1-SH
08/17/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-P8
08/14/2026
Filed — Full Demolition
full demolition of 2 story structure using hand held equipment.
B01189961-P6
08/12/2026
Permit issued — Full Demolition
B01189961-I1-FD
08/06/2026
Permit issued — Protection and Mechanical Methods
B01189961-S1-PMM
07/14/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/14/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/09/2026
Special inspection requirement — Demolition
SANTIAGO HELMAN
07/09/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
SANTIAGO HELMAN
06/30/2026
Violation issued (ECB, open)
Construction
06/23/2026
Objection resolved — Addressed
06/16/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-P7
06/16/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-P5
06/15/2026
Objection raised — Admin
06/01/2026
Filed — Full Demolition
full demolition of 2 story structure using hand held equipment.
B01189961-P4
05/29/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-P4
05/28/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-P3
04/30/2026
Special inspection requirement — Demolition
SANTIAGO HELMAN
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
SANTIAGO HELMAN
04/29/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-P2
04/17/2026
Permit issued — Protection and Mechanical Methods
B01189961-S3-PMM
04/06/2026
Violation issued (ECB, closed)
Construction
04/01/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-P1
04/01/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-S1
04/01/2026
Permit issued — Supported Scaffold
B00926193-S1-SF
03/03/2026
Permit issued — Construction Fence
B01189961-S2-FN
12/17/2025
Filed — Full Demolition
full demolition of 2 story structure using hand held equipment.
B01189961-P3
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
SANTIAGO HELMAN
12/11/2025
Special inspection requirement — Demolition
SANTIAGO HELMAN
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2025
Objection resolved — Addressed
09/19/2025
Objection raised — Other
09/04/2025
Filed — Full Demolition
full demolition of 2 story structure using hand held equipment.
B01189961-S3
09/03/2025
Permit issued — Sidewalk Shed
B00926193-I1-SH
08/26/2025
Violation issued (ECB, closed)
Construction
08/15/2025
Objection resolved — Addressed
08/07/2025
Objection raised — Other
07/31/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/23/2025
Filed — Full Demolition
full demolition of 2 story structure using hand held equipment.
B01189961-P1
07/23/2025
Special inspection requirement — Demolition
SANTIAGO HELMAN
07/23/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
SANTIAGO HELMAN
05/29/2025
Filed — Full Demolition
full demolition of 2 story structure using hand held equipment.
B01189961-S1
05/29/2025
Filed — Full Demolition
full demolition of 2 story structure using hand held equipment.
B01189961-S2
05/21/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Structural
03/07/2025
Filed — Full Demolition
full demolition of 2 story structure using hand held equipment.
B01189961-I1
03/04/2025
Signed off — Alteration
B00952626-I1
10/28/2024
Permit issued — Structural
B00952626-I1-GC-CX
10/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/14/2024
Permit issued — Sidewalk Shed
B00926193-I1-SH
12/28/2023
Violation issued (ECB, closed)
Construction
10/24/2023
Filed — Alteration
B00952626-I1
09/14/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/13/2023
Permit issued — Sidewalk Shed
B00926193-I1-SH
09/12/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00926193-I1
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionPermit IssuedDM80 SOLUTIONS LLC08/20/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC08/18/2026
DOB NOWFull DemolitionPermit IssuedDM80 SOLUTIONS LLC08/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDM80 SOLUTIONS LLC08/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDM80 SOLUTIONS LLC04/17/2026
DOB NOWSupported ScaffoldPermit IssuedMC SUPERSTRUCTURE INC04/01/2026
DOB NOWConstruction FencePermit IssuedDM80 SOLUTIONS LLC03/03/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC09/03/2025
DOB NOWStructuralSigned-offSAFETECH ENTERPRISES CORP10/28/2024
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC08/14/2024
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC09/13/2023
BISEQISSUEDLAKHI GENERAL CONTRACTOR10/10/2015
BISOTISSUEDLAKHI GENERAL CONTRACTOR10/06/2015
BISEQISSUEDLAKHI GENERAL CONTRACTOR09/10/2015
BISPLISSUEDSUNSET PL & FIR PROTEC. CORP04/22/2005
BIS—ISSUEDELEGANCE CONT CORP04/18/2005
3 projects · most recent 04/10/2026
FiledStatusContractorScope
04/10/2026Permit IssuedNASH ELECTRIC SERVICES IN—
03/27/2025Permit IssuedEMPIRE STATE ELECTL CORP1 meters, 1 new_meters
08/22/2023CompleteNASH ELECTRIC SERVICES IN—
2 projects · most recent 08/17/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
08/17/2026Permit IssuedMC SUPERSTRUCTURE INCScaffold, Sidewalk Shed
08/14/2026Permit IssuedDM80 SOLUTIONS LLCFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/14/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/09/2026DemolitionSANTIAGO HELMANspecial
07/09/2026Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
04/30/2026DemolitionSANTIAGO HELMANspecial
04/30/2026Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
12/11/2025Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
12/11/2025DemolitionSANTIAGO HELMANspecial
07/23/2025DemolitionSANTIAGO HELMANspecial
07/23/2025Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/26/2026B00952626-I1Request digital key ↗
08/20/2026B01189961-P6Request digital key ↗
08/20/2026B01189961-P3Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
09/29/2022322112147Open ↗
09/20/2022322105208Open ↗
10/09/2015340312833Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
10/09/2015340312833Open ↗
10/06/2015340306948Open ↗
09/08/2015340300347Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026B00952626-I1Open ↗
08/20/2026B01189961-P6Open ↗
08/20/2026B01189961-P4Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/09/2015340312833Open ↗
10/06/2015340306948Open ↗
09/08/2015340300347Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/09/2015340312833Open ↗
10/06/2015340306948Open ↗
09/08/2015340300347Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/09/2015340312833Open ↗
10/06/2015340306948Open ↗
09/08/2015340300347Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B01189961-I1Open ↗
08/23/2026B01189961-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026B01189961-I1Open ↗
▸DOB NOWWater Cut-Off1
08/20/2026B01189961-I1Open ↗
▸DOB NOWGas Cut-Off1
08/20/2026B01189961-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/20/2026B01189961-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/06/2015340306948Open ↗
▸DOB NOWRodent Control1
08/20/2026B01189961-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026B00952626-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026B01189961-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/06/2015340306948Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/06/2015340306948Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/09/2015340312833Open ↗
10/06/2015340306948Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/17/2026B00926193-P3Open ↗
08/17/2026B00926193-P7Open ↗
08/17/2026B00926193-P2Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/03/2022322112147Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/06/2015340306948Open ↗
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET3
10/09/2015340312833Open ↗
10/06/2015340306948Open ↗
09/08/2015340300347Open ↗
▸BISEFILING COVER SHEET2
09/29/2022322112147Open ↗
09/20/2022322105208Open ↗
▸Other Documents15
▸DOB NOWProperty Ownership Certification4
08/15/2026B01189961-P4Open ↗
08/13/2026B01189961-I1Open ↗
08/13/2026B01189961-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStructure Photographs4
08/15/2026B01189961-P4Open ↗
08/13/2026B01189961-P1Open ↗
08/13/2026B01189961-I1Open ↗
Showing 3 of 4 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION3
10/09/2015340312833Open ↗
10/06/2015340306948Open ↗
09/08/2015340300347Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/08/2015340300347Open ↗
▸BISPLOT DIAGRAM1
10/03/2022322112147Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/20/2026B01189961-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/20/2026B01189961-I1Open ↗