← Back
BuildNYC
Office, 20+ stories, with or without commercial
Jacob Javits Federal Building
26 FEDERAL PLAZA · BIN 1001674
💬 Discuss this project
1977Year Built
41Stories
O4Building Class
C6-4Zoning
905,500 sfGross Floor Area
41Units
LL97 Covered0 Active Violations 3 likely answered ▸FDNY Report ↗
Office, 20+ stories, with or without commercial · 71,586 sf lot · 12.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 44General Services Administration Public Buildings Service Nor1 filing · 3 docs
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5United States General Services Administration1 filing · 2 docs
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorHeavy duty sidewalk shed installation7p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lcor503/22/2026
GSA403/21/2026
Jacob K.javitz Federal Building203/21/2026
United States General Services Admi203/21/2026
Director203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shahrish Shuvo Engineering110/12/2023
Robert Benson101/13/2023
Paul Perdek, Prof. Engineering203/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ganci Logozzo203/21/2026
A1 Expediting Service403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rockledge ScaffoldScaffold403/21/2026
Hylan Datacom & ElectricalElectrical103/21/2026
BLH Elect'l ContractorsElectrical103/21/2026
Silverman RobertElectrical103/21/2026
Sortino JosephElectrical103/21/2026
V. Vass ElectricElectrical103/21/2026
Building Lifecycle
All (42)Filed (4)Permit Issued (2)Signed Off (1)Violation (34)Special Inspection (1)
12/11/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00667721-I1
10/12/2023
Filed — Alteration
Remediate approximately 89 SF of Fire Proofing containing ACM material at 5th Floor
M00946028-I1
02/15/2023
Permit issued — Sidewalk Shed
M00667721-I1-SH
01/13/2023
Filed — Alteration
M00808244-I1
01/05/2023
Special inspection requirement — Final
ROBERT BENSON
03/09/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00667721-P1
02/04/2022
Permit issued — Sidewalk Shed
M00667721-I1-SH
02/03/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00667721-I1
04/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/13/2021
Violation issued (ECB, closed)
Construction
09/03/2020
Violation issued (FDNY_ORDER, closed)
07/13/2020
Violation issued (FDNY_ORDER, closed)
05/20/2020
Violation issued (FDNY_ORDER, closed)
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/13/2019
Violation issued (FDNY_ORDER, closed)
07/13/2019
Violation issued (FDNY_ORDER, closed)
06/08/2019
Violation issued (FDNY_NOV, closed)
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/28/2018
Violation issued (FDNY_ORDER, closed)
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/18/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/18/2013
Violation issued (FDNY_ORDER, closed)
05/18/2013
Violation issued (FDNY_ORDER, closed)
05/18/2013
Violation issued (FDNY_ORDER, closed)
05/18/2013
Violation issued (FDNY_ORDER, closed)
05/18/2013
Violation issued (FDNY_ORDER, closed)
05/11/2013
Violation issued (FDNY_ORDER, closed)
05/11/2013
Violation issued (FDNY_ORDER, closed)
05/11/2013
Violation issued (FDNY_ORDER, closed)
08/29/2012
Violation issued (FDNY_ORDER, closed)
08/29/2012
Violation issued (FDNY_ORDER, closed)
08/29/2012
Violation issued (FDNY_ORDER, closed)
08/29/2010
Violation issued (FDNY_ORDER, closed)
07/16/2010
Violation issued (FDNY_ORDER, closed)
04/28/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/13/2006
Violation issued (ECB, closed)
Construction
12/07/2005
Violation issued (FDNY_ORDER, closed)
06/24/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/08/1986
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offRockledge Scaffold02/15/2023
DOB NOWSidewalk ShedSigned-offRockledge Scaffold02/04/2022
BISEQISSUEDSpring Scaffolding09/04/2020
BISEQISSUEDPowers Bridging & Scaffolding03/02/2018
BISEQISSUEDPowers Bridging & Scaffolding01/17/2017
BISEQISSUEDPowers Bridging & Scaffolding01/13/2016
BISEQISSUEDCitrel12/11/2015
BISOTISSUEDCitrel12/09/2015
BISEQISSUEDTriangle Enterprise NYC I04/08/2014
BISEQISSUEDTriangle Enterprise NYC I03/21/2014
BISEQISSUEDFox Industries03/28/2012
BISEQISSUEDFox Industries04/06/2011
BISEQISSUEDNew York Ladder & Scaffold04/18/2007
BISEQISSUEDTrataros Construction06/02/1995
BISEQISSUEDTrataros Construction10/25/1994
2 projects · most recent 01/28/2022
FiledStatusContractorScope
01/28/2022CompleteAnthony G Ferry—
07/30/2019CompleteAll Ways Electric Corp.w—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
01/05/2023FinalROBERT BENSONprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
United States General Services AdministrationGovernment / CivicFloor 5
Project M00946028 Alteration · Approved · 10/12/2023
General Services Administration Public Buildings Service Northeast and Caribbean RegionGovernment / CivicFloor 44
Project M00808244 Alteration · Approved · 01/13/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/02/2026M00667721-I1Request digital key ↗
09/02/2026M00667721-P1Request digital key ↗
09/01/2026M00808244-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION11
09/04/2020140945707Open ↗
03/02/2018122622796Open ↗
01/27/2017122622796Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/28/2020140945707Open ↗
01/26/2016122622796Open ↗
01/15/2016122622796Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications24
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/14/2016140420710Open ↗
01/26/2016122622796Open ↗
01/15/2016122622796Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/28/2020140945707Open ↗
12/03/2015140420710Open ↗
04/04/2014140180435Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/28/2020140945707Open ↗
12/03/2015140420710Open ↗
04/04/2014140180435Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/28/2020140945707Open ↗
12/03/2015140420710Open ↗
04/04/2014140180435Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026M00667721-P1Open ↗
09/02/2026M00667721-I1Open ↗
08/29/2026M00946028-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/04/2010120520463Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/04/2010120520463Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026M00808244-I1Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
03/14/2016140420710Open ↗
12/03/2015140420710Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/04/2010120520463Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/04/2014140180435Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
12/03/2015140420710Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/17/2020140945707Open ↗
08/28/2020140945707Open ↗
12/03/2015140420710Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
09/02/2026M00667721-I1Open ↗
09/02/2026M00667721-P1Open ↗
08/13/2026M00946028-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/17/2020140945707Open ↗
03/14/2016140420710Open ↗
09/14/2015120520463Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/27/2017122622796Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/04/2010120520463Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/14/2016140420710Open ↗
12/03/2015140420710Open ↗
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET4
08/28/2020140945707Open ↗
12/03/2015140420710Open ↗
04/04/2014140180435Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
01/26/2016122622796Open ↗
01/15/2016122622796Open ↗
11/04/2010120520463Open ↗
▸Other Documents3
▸BISFEE EXEMPTION DOCUMENTATION2
04/04/2014140180435Open ↗
03/20/2014140174647Open ↗
▸BISSupporting Document: Fee Deferment1
01/15/2016122622796Open ↗