← Back
Two family brick
306 LINCOLN PLACE
BROOKLYN · BIN 3389855
💬 Discuss this project
2004Year Built
3Stories
B1Building Class
R7AZoning
3,520 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 1,375 sf lot · 2.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
PenthouseUnder Construction8p · 3 filings · 20 docs
Floor 55p · 1 filing · 8 docs
Floor 4Under Construction11p · 4 filings · 20 docs
Floor 3Under Construction13p · 4 filings · 20 docs
Floor 2Under Construction13p · 4 filings · 20 docs
Floor 1Under Construction14p · 4 filings · 20 docs
BasementUnder Construction4p · 2 filings · 20 docs
Sub-Basement4p · 2 filings · 7 docs
1 job · most recent 03/23/2022
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2022Permit IssuedPARADISE CONSTRUCTION NYCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-FS06NA 6,000 BTU · Fan Coil Indoor ×5
MLZ-KP09NA 9,000 BTU · Fan Coil Indoor ×3
MLZ-KP18NA 18,000 BTU · Vrf Indoor ×3
MSZ-FS09NA 9,000 BTU · Fan Coil Indoor ×3
MXZ-SM48NAMHZ 48,000 BTU · Heat Pump Outdoor ×2
MSZ-FS15NA 15,000 BTU · Fan Coil Indoor ×1
MSZ-FS18NA 18,000 BTU · Fan Coil Indoor ×1
MXZ-SM42NAMHZ 42,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 04/16/2025
FiledStatusContractorScope
04/16/2025Permit IssuedRENEW PLUMBING CORP58 heads
1 job · most recent 12/07/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/07/2022Permit IssuedA. M. PLUMBING COMPANYGas, Storm, Water/Sanitary
4 jobs · most recent 11/26/2024
General Wiring
FiledStatusContractorScope
11/26/2024CompleteFLOW STATE ELECTRIC, LLC—
05/31/2024Permit IssuedRICHARD NEU—
04/10/2024Permit IssuedRICHARD NEU—
04/04/2024Permit IssuedKENNETH FISK ELECTRIC CORGeneral Wiring
1 job · most recent 08/23/2023
Steel Masonry Wood
FiledStatusContractorScope
08/23/2023Permit IssuedBLACK HAMMER CONSTRUCTIONSteel, Masonry, Wood
1 job · most recent 08/23/2023
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/23/2023Permit IssuedBLACK HAMMER CONSTRUCTIONTenant Protection Plan 72 Hour
Building Lifecycle
All (92)Filed (10)Permit Issued (17)Signed Off (6)Violation (2)Inspection (5)Objection (22)Special Inspection (30)
07/13/2026
Permit issued — General Construction
B00583456-I1-GC-CX
06/30/2026
Permit issued — General Construction
B00583456-I1-GC-CX
02/26/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE OF USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
B01149672-I1
09/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2025
Signed off — Alteration
B01057864-I1
08/06/2025
Signed off — Alteration
B01057858-I1
08/06/2025
Permit issued — General Construction
B00583456-I1-GC-CX
07/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2025
Permit issued — Plumbing
B00750030-I1-PL
05/02/2025
Permit issued — Sprinklers
B00725724-I1-EW-SP
04/16/2025
Filed — Alteration
Installation of sprinkler system. The system is hydraulically calculated. There is no change of use, occupancy or egress under this application.
B00725724-I1
01/22/2025
Permit issued — Solar
B01149672-I1-SL
12/05/2024
Objection raised — Other
12/05/2024
Objection resolved — Addressed
12/02/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE OF USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
B01149672-I1
12/02/2024
Special inspection requirement — Air barrier - visual inspection
William Alicea
12/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
12/02/2024
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
12/02/2024
Special inspection requirement — Final
RICHARD MUESCH JR.
11/19/2024
Permit issued — Mechanical Systems
B00583456-I1-GC-CX
05/31/2024
Permit issued — Sidewalk Shed
B01057858-I1-SH
05/30/2024
Filed — Alteration
B01057864-I1
05/30/2024
Filed — Alteration
B01057858-I1
05/30/2024
Permit issued — Supported Scaffold
B01057864-I1-SF
05/28/2024
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
05/24/2024
Signed off — Alteration
B01050647-I1
05/24/2024
Signed off — Alteration
B01049192-I1
05/14/2024
Permit issued — Supported Scaffold
B01050647-I1-SF
05/13/2024
Filed — Alteration
B01050647-I1
05/10/2024
Permit issued — Sidewalk Shed
B01049192-I1-SH
05/09/2024
Filed — Alteration
B01049192-I1
05/09/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01032398-I1
05/09/2024
Permit issued — Sidewalk Shed
B01032398-I1-SH
04/09/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01032398-I1
04/09/2024
Permit issued — Sidewalk Shed
B01032398-I1-SH
03/26/2024
Permit issued — Plumbing
B00750030-I1-PL
11/30/2023
Permit issued — Structural
B00921876-I1-ST
11/17/2023
Permit issued — General Construction
B00583456-I1-GC-CX
08/23/2023
Filed — Alteration
Structural work for enlargement and reinforcement of existing building
B00921876-I1
08/18/2023
Special inspection requirement — Wood – Seismic Resistance
Andrew McConnell
08/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andrew McConnell
08/18/2023
Special inspection requirement — Masonry
Andrew McConnell
08/18/2023
Special inspection requirement — Structural Cold-Formed Steel
Andrew McConnell
08/18/2023
Special inspection requirement — Structural Steel - Details
Andrew McConnell
08/18/2023
Special inspection requirement — Final
Andrew McConnell
01/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/18/2023
Permit issued — Plumbing
B00750030-I1-PL
12/23/2022
Objection resolved — Addressed
12/16/2022
Objection raised — Scope
12/07/2022
Filed — Alteration
Installation of new water/ sanitary piping and plumbing fixtures in existing 2-family house. Removal of all gas burning appliances and disconnect all gas service to building. Work in this application pertains to ALT1 Job# B00583456.
B00750030-I1
12/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
Bryce Taylor
12/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Bryce Taylor
12/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Bryce Taylor
12/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
Bryce Taylor
04/27/2022
Objection raised — Admin
04/27/2022
Objection resolved — Addressed
04/26/2022
Special inspection requirement — Sprinkler Systems
Gregory Mortman
Latest 60 of 92 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRYCE TAYLOR, ARCHITECT4507/14/2026
VIGO CONSTRUCTION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LLOYD NOEL BUILDING CONSULTANT403/21/2026
AK CONSULTING SERVICES803/21/2026
EBC CONSULTING203/21/2026
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JAKE AND NATE CONSTRUCTGeneral Contractor507/08/2026
BLACK HAMMER CONSTRUCTIONGeneral Contractor407/08/2026
SAHARA CONTRACTING CORPGeneral Contractor407/02/2026
R&A CONSTR SERVICES INCGeneral Contractor407/08/2026
A. M. PLUMBING COMPANYPlumbing307/08/2026
JERON WALKERElectrical203/21/2026
RENEW PLUMBING CORPFire Protection106/28/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor107/08/2026
FLOW STATE ELECTRIC LLC 005051General Contractor103/22/2026
SERGIO GIANNACHIElectrical103/21/2026
PARADISE CONSTRUCTION NYCGeneral Contractor107/14/2026
RICHARD NEUElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
SOLAR PRO INCGeneral Contractor104/09/2026
LELIS, ARILSONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOMATED DESIGN CONSULTA895104/16/2025
WORLD DESIGN ARCHITECTURE9323112/02/2024
AK CONSULTING SERVICES, I6198205/30/2024
STRUCTURAL CONSULTING SER1919108/23/2023
BRYCE TAYLOR, ARCHITECT8102212/07/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPARADISE CONSTRUCTION NYC07/13/2026
DOB NOWGeneral ConstructionPermit IssuedSAHARA CONTRACTING CORP06/30/2026
DOB NOWGeneral ConstructionPermit IssuedSAHARA CONTRACTING CORP08/06/2025
DOB NOWPlumbingPermit IssuedA. M. PLUMBING COMPANY07/07/2025
DOB NOWSprinklersPermit IssuedRENEW PLUMBING CORP05/02/2025
DOB NOWSolarSigned-offSOLAR PRO INC01/22/2025
DOB NOWMechanical SystemsPermit IssuedSAHARA CONTRACTING CORP11/19/2024
DOB NOWSidewalk ShedSigned-offR&A CONSTR SERVICES INC05/31/2024
DOB NOWSupported ScaffoldSigned-offR&A CONSTR SERVICES INC05/30/2024
DOB NOWSupported ScaffoldSigned-offJAKE AND NATE CONSTRUCT05/14/2024
DOB NOWSidewalk ShedSigned-offJAKE AND NATE CONSTRUCT05/10/2024
DOB NOWSidewalk ShedSigned-offJAKE AND NATE CONSTRUCT05/09/2024
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL04/09/2024
DOB NOWPlumbingPermit IssuedA. M. PLUMBING COMPANY03/26/2024
DOB NOWStructuralPermit IssuedBLACK HAMMER CONSTRUCTION11/30/2023
DOB NOWGeneral ConstructionPermit IssuedBLACK HAMMER CONSTRUCTION11/17/2023
DOB NOWPlumbingPermit IssuedA. M. PLUMBING COMPANY01/18/2023
BISPLISSUEDHENRY MYERS P & H, INC04/18/2008
BISPLISSUEDHENRY MYERS PLBG & HTG09/07/2007
BISOTISSUEDTROY CONSTRUCTION OF NY INC.01/04/2007
BIS—ISSUEDMEDITERRANEAN CONSTRUCTION CORP09/22/2004
BISEQRE-ISSUEDMEDITERRANEAN CONSTRUCTION CORP09/22/2004
BISPLISSUEDCATMAN PLUMBING INC04/23/2004
BISEQISSUEDMEDITERRANEAN CONSTRUCTION CORP01/09/2004
BIS—ISSUEDMEDITERRANEAN CONSTRUCTION CORP01/09/2004
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/02/2024Air barrier - visual inspectionWilliam Aliceaenergy_progress
12/02/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
12/02/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
12/02/2024Energy Code Compliance InspectionsWilliam Aliceaprogress
12/02/2024FinalRICHARD MUESCH JR.progress
05/28/2024Post-installed AnchorsMAHFUZAR RAHMANspecial
08/18/2023Wood – Seismic ResistanceAndrew McConnellspecial
08/18/2023Structural Stability – Alterations of existing buildingsAndrew McConnellspecial
08/18/2023MasonryAndrew McConnellspecial
08/18/2023Structural Cold-Formed SteelAndrew McConnellspecial
08/18/2023Structural Steel - DetailsAndrew McConnellspecial
08/18/2023FinalAndrew McConnellprogress
12/01/2022HVAC-R and service water heating equipmentBryce Taylorenergy_progress
12/01/2022Fire-Resistant Penetrations and JointsBryce Taylorspecial
12/01/2022HVAC-R and service water piping design and insulationBryce Taylorenergy_progress
12/01/2022HVAC-R and service water heating system controlsBryce Taylorenergy_progress
04/26/2022Sprinkler SystemsGregory Mortmanspecial
03/10/2022MeteringBryce Taylorenergy_progress
03/10/2022Exterior Insulation and Finish Systems (EIFS)Bryce Taylorspecial
03/10/2022Fire-Resistant Penetrations and JointsBryce Taylorspecial
03/10/2022Heating SystemsBryce Taylorspecial
03/10/2022MasonryBryce Taylorspecial
03/10/2022HVAC-R and service water heating system controlsBryce Taylorenergy_progress
03/10/2022Shutoff dampersBryce Taylorenergy_progress
03/10/2022HVAC-R and service water heating equipmentBryce Taylorenergy_progress
Latest 25 of 34.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B00921876-I1Contact architect ↗
08/25/2026B01032398-I1Contact architect ↗
08/25/2026B01049192-I1Contact architect ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00583456-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00583456-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026B00750030-I1Open ↗
08/29/2026B00725724-I1Open ↗
08/28/2026B00583456-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026B01049192-I1Open ↗
08/25/2026B01050647-I1Open ↗
08/25/2026B01057864-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00750030-I1Open ↗
08/28/2026B00583456-I1Open ↗
08/28/2026B00583456-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00583456-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00583456-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01149672-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026B00583456-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00583456-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00583456-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00583456-I1Open ↗