Zoned residential, not Manhattan
306 PENNSYLVANIA AVENUE
BROOKLYN · BIN 3823969
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6Zoning
0 sfGross Floor Area
0Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: HP NEW PENN HOUSING DEVELOPMENT FUND COM PANY, INC · 5,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction32p · 2 filings · 20 docs
Floor 7Under Construction31p · 2 filings · 20 docs
Floor 6Under Construction31p · 2 filings · 20 docs
Floor 5Under Construction31p · 2 filings · 20 docs
Floor 4Under Construction31p · 2 filings · 20 docs
Floor 3Under Construction31p · 2 filings · 20 docs
Floor 2Under Construction31p · 2 filings · 20 docs
Floor 1Under Construction34p · 3 filings · 20 docs
CellarUnder Construction38p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW PENN DEVELOPMENT HDFC1708/30/2026
TECHNOCRAFT1203/22/2026
HP NEW PENN HOUSING DEVELOPMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC807/29/2026
JOEL PHAGOO P.E. PLLC211/05/2025
PAUL PERDEK, PROF. ENG. PLLC208/05/2025
WEXLER ASSOCIATES403/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC2003/21/2026
A1 EXPEDITING SERVICE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TECHNOCRAFT INCGeneral Contractor807/08/2026
NATIONWIDE MECHANICAL INCPlumbing608/26/2026
AKM CONSTRUCTION NY CORPGeneral Contractor504/09/2026
KIRI CONSTRUCTION CORPGeneral Contractor307/08/2026
ALEXANDER EUGENEElectrical103/21/2026
C. JAMES PLBG & HTG INCFire Protection107/08/2026
VITO INGRAVALLOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304907/29/2026
Building Lifecycle
All (135)Filed (16)Permit Issued (17)Signed Off (6)Violation (13)Inspection (13)Objection (40)Special Inspection (30)
09/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228175-S2
08/21/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228175-S1
08/19/2026
Special inspection requirement — Mechanical Systems
Naeem Anwar
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
PARAG MEHTA
08/19/2026
Special inspection requirement — Final
PARAG MEHTA
08/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
PARAG MEHTA
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
PARAG MEHTA
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
PARAG MEHTA
08/19/2026
Special inspection requirement — Shutoff dampers
PARAG MEHTA
08/12/2026
Permit issued — Sprinklers
B00447269-I1-PL
08/07/2026
Violation issued (ECB, open)
Site Safety
08/03/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228175-I1
07/29/2026
Filed — Alteration
New mechanical work with ERV units for intake and exhaust and new heat pump for heating and cooling in conjunction with NB filing 321599294
B00611425-P2
04/17/2026
Filed — Alteration
New plumbing and sprinkler at proposed residential building.
B00447269-P3
03/30/2026
Permit issued — Sidewalk Shed
B01228175-I1-SH
03/19/2026
Permit issued — Mechanical Systems
B00611425-I1-MS
03/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
PARAG MEHTA
02/10/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Naeem Anwar
02/10/2026
Special inspection requirement — Sprinkler Systems
Naeem Anwar
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
PARAG MEHTA
02/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PARAG MEHTA
02/10/2026
Special inspection requirement — Mechanical Systems
Naeem Anwar
02/10/2026
Special inspection requirement — Final
PARAG MEHTA
02/10/2026
Special inspection requirement — Shutoff dampers
PARAG MEHTA
02/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
PARAG MEHTA
02/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
PARAG MEHTA
02/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
PARAG MEHTA
01/31/2026
Violation issued (ECB, open)
Unknown
01/22/2026
Violation issued (ECB, closed)
Construction
01/22/2026
Violation issued (ECB, closed)
Construction
01/22/2026
Violation issued (ECB, open)
Construction
01/15/2026
Violation issued (ECB, closed)
Unknown
01/12/2026
Permit issued — Sprinklers
B00447269-I1-EW-SP
12/24/2025
Signed off — Alteration
Reinforced concrete and steel structure for new building
B00615025-I1
12/23/2025
Permit issued — Construction Fence
B01135545-I1-FN
12/20/2025
Violation issued (ECB, closed)
Unknown
12/20/2025
Violation issued (ECB, closed)
Unknown
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Permit issued — Construction Fence
B01135545-I1-FN
11/05/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228175-P1
09/22/2025
Violation issued (ECB, closed)
Construction
09/22/2025
Violation issued (ECB, closed)
Construction
09/15/2025
Signed off — Alteration
Foundation and Earthwork in conjunction to NB filing 321599294
B00615044-I1
09/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/09/2025
Violation issued (ECB, closed)
Construction
08/06/2025
Permit issued — Protection and Mechanical Methods
B01228175-S2-PMM
08/05/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228175-S2
08/05/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228175-S1
08/05/2025
Permit issued — Supported Scaffold
B01228175-S1-SF
07/24/2025
Permit issued — Sprinklers
B00447269-I1-PL
05/23/2025
Signed off — Alteration
Foundation and Earthwork in conjunction to NB filing 321599294
B00615044-S1
05/23/2025
Permit issued — Sidewalk Shed
B01228175-I1-SH
05/22/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228175-I1
05/15/2025
Violation issued (ECB, closed)
Construction
05/15/2025
Violation issued (ECB, closed)
Unknown
05/08/2025
Objection resolved — Addressed
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedNATIONWIDE MECHANICAL INC08/12/2026
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY03/30/2026
DOB NOWMechanical SystemsPermit IssuedTECHNOCRAFT INC03/19/2026
DOB NOWSprinklersPermit IssuedC. JAMES PLBG & HTG INC01/12/2026
DOB NOWConstruction FencePermit IssuedTECHNOCRAFT INC12/23/2025
DOB NOWConstruction FencePermit IssuedTECHNOCRAFT INC11/14/2025
DOB NOWProtection and Mechanical MethodsSigned-offAKM CONSTRUCTION NY08/06/2025
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY08/05/2025
DOB NOWSprinklersPermit IssuedNATIONWIDE MECHANICAL INC07/24/2025
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY05/23/2025
DOB NOWSprinklersPermit IssuedNATIONWIDE MECHANICAL INC04/09/2025
DOB NOWStructuralSigned-offTECHNOCRAFT INC01/14/2025
DOB NOWEarth WorkSigned-offTECHNOCRAFT INC01/14/2025
DOB NOWEarth WorkSigned-offKIRI CONSTRUCTION CORP12/02/2024
DOB NOWStructuralSigned-offKIRI CONSTRUCTION CORP12/02/2024
DOB NOWSupport of ExcavationSigned-offKIRI CONSTRUCTION CORP11/29/2024
DOB NOWConstruction FencePermit IssuedTECHNOCRAFT INC11/12/2024
BIS—ISSUEDTECHNOCRAFT INC07/14/2025
BIS—ISSUEDTECHNOCRAFT INC06/10/2025
BIS—ISSUEDTECHNOCRAFT INC06/10/2025
BIS—ISSUEDTECHNOCRAFT INC01/10/2025
BIS—ISSUEDKIRI CONSTRUCTION CORP12/03/2024
1 project · most recent 07/29/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2026Permit IssuedTECHNOCRAFT INCAir Conditioning Systems, Ventilation Systems
Cooling
Ephoca AIO AWP10N4HI (FORMELY KNOWN AS HPAC 2.0) 10,200 BTU ×165
Mitsubishi Electric Mitsubishi electric MXZ-SM60NAM2-UI 60,000 BTU · Vrf Outdoor ×3
Ventilation
Greenheck Greenheck inline fan BSQ90 1,012 CFM · Exhaust Fan ×3
Pennbarry Penn Barry Exhaust Roof Fan Model # DX8Q 317 CFM · Exhaust Fan ×3
Tjernlund Tjernlund RT750 750 CFM · Exhaust Fan ×3
Ventacity VENTACITY VS3000 RT 3,000 CFM ×3
1 project · most recent 04/17/2026
FiledStatusContractorScope
04/17/2026Permit IssuedC. JAMES PLBG & HTG INC202 heads
1 project · most recent 04/17/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/17/2026Permit IssuedNATIONWIDE MECHANICAL INCStorm, Water/Sanitary
3 projects · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026Permit IssuedL J ELEC'L SERV. INC.—
05/19/2025CompleteHIGH QUALITY ELEC.OF NYC—
05/01/2025Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
2 projects · most recent 11/05/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
11/05/2025Signed-offAKM CONSTRUCTION NY CORPScaffold, Sidewalk Shed
11/01/2024Permit IssuedTECHNOCRAFT INCFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
09/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/28/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/19/2026Mechanical SystemsNaeem Anwarspecial
08/19/2026Energy Code Compliance InspectionsPARAG MEHTAprogress
08/19/2026FinalPARAG MEHTAprogress
08/19/2026Duct leakage testing, insulation and designPARAG MEHTAenergy_progress
08/19/2026HVAC-R and service water heating system controlsPARAG MEHTAenergy_progress
08/19/2026HVAC-R and service water heating equipmentPARAG MEHTAenergy_progress
08/19/2026Shutoff dampersPARAG MEHTAenergy_progress
02/10/2026Energy Code Compliance InspectionsPARAG MEHTAprogress
02/10/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNaeem Anwarspecial
02/10/2026Sprinkler SystemsNaeem Anwarspecial
02/10/2026Energy Code Compliance InspectionsPARAG MEHTAprogress
02/10/2026HVAC-R and service water piping design and insulationPARAG MEHTAenergy_progress
02/10/2026Mechanical SystemsNaeem Anwarspecial
02/10/2026FinalPARAG MEHTAprogress
02/10/2026Shutoff dampersPARAG MEHTAenergy_progress
02/10/2026HVAC-R and service water heating equipmentPARAG MEHTAenergy_progress
02/10/2026Duct leakage testing, insulation and designPARAG MEHTAenergy_progress
02/10/2026HVAC-R and service water heating system controlsPARAG MEHTAenergy_progress
04/24/2025HVAC-R and service water piping design and insulationPARAG MEHTAenergy_progress
04/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNaeem Anwarspecial
04/24/2025Sprinkler SystemsNaeem Anwarspecial
04/24/2025Energy Code Compliance InspectionsPARAG MEHTAprogress
03/20/2025Excavations - Sheeting, Shoring, and BracingNaeem Anwarspecial
03/20/2025Structural Stability – Alterations of existing buildingsNaeem Anwarspecial
03/20/2025Structural Steel - DetailsNaeem Anwarspecial
Latest 25 of 42.
▾Documents — 149 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch13
08/25/2026B00615044-S1Request digital key ↗
08/25/2026B00615044-P1Request digital key ↗
08/25/2026B00615025-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/17/2026B00447269-P1Request digital key ↗
08/17/2026B00447269-P3Request digital key ↗
08/17/2026B00447269-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/17/2026B00447269-P1Request digital key ↗
08/17/2026B00447269-P3Request digital key ↗
08/17/2026B00447269-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION12
09/17/2025321599294Open ↗
04/24/2025321599294Open ↗
08/16/2024321599294Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION2
01/16/2025321599294Open ↗
12/03/2024321599294Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/08/2022340829571Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/01/2022321599294Open ↗
▸BISZONING DIAGRAM1
07/14/2022321599294Open ↗
▸Seals & Professional Certifications49
▸DOB NOWSpecial Inspector Seal & Signature19
09/26/2026B00615044-P1Open ↗
09/26/2026B00615044-P1Open ↗
09/26/2026B00615044-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/21/2026B01228175-P2Open ↗
08/21/2026B01228175-P1Open ↗
08/21/2026B01228175-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/28/2026B00611425-I1Open ↗
08/28/2026B00611425-I1Open ↗
08/27/2026B00611425-P2Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/29/2022340829571Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/29/2022340829571Open ↗
▸Trade Schedules & Equipment1
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
04/01/2022321599294Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
04/01/2022321599294Open ↗
12/02/2021321599294Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/01/2024321599294Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/29/2022340829571Open ↗
▸BISSTREET TREES SITE PLAN1
08/08/2022340829571Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/03/2024321599294Open ↗
11/14/2024321599294Open ↗
05/13/2022321599294Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/14/2024321599294Open ↗
05/13/2022321599294Open ↗
05/13/2022321599294Open ↗
Showing 3 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
11/29/2024321599294Open ↗
▸BISSOIL REPORT1
04/01/2022321599294Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/01/2022321599294Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
12/03/2024321599294Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00615044-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00615044-I1Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/13/2026B01228175-I1Open ↗
08/13/2026B01228175-P1Open ↗
08/13/2026B00611425-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026B00615025-I1Open ↗
08/13/2026B00447269-I1Open ↗
08/13/2026B00447269-P1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/15/2024321599294Open ↗
05/12/2022321599294Open ↗
04/01/2022321599294Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
07/13/2022321599294Open ↗
03/31/2022321599294Open ↗
03/04/2022321599294Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00615044-I1Open ↗
08/13/2026B01135545-I1Open ↗
08/13/2026B00615025-I1Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/29/2022340829571Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/29/2024321599294Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
05/22/2025321599294Open ↗
10/29/2024321599294Open ↗
10/02/2024321599294Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/29/2022340829571Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/08/2022340829571Open ↗
▸Other Documents5
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00615044-I1Open ↗
08/13/2026B00615044-S1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/01/2022321599294Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/08/2022340829571Open ↗
▸BISPLOT DIAGRAM1
04/01/2022321599294Open ↗