ECB07/20/2026At time of inspection, 7-story school building observed with dumpster storage zone at exposure 1 not properly enclosed. Required 4-foot solid barrier and 4-foot chain-link fencing were not provided around the d$2K due
ECB05/18/20267-story new building topped out, i observed exposure #1 where a delivery truck was used for window delivery and a forklift was lifting equipment over a pedestrian walkway. Review of DOT records and onsite docum$2K due
ECB04/10/2026Failure to maintain adequate housekeeping per section requirement. As noted: at time of inspection at a jobsite of a proposed 7 story building already at the bulkhead level. Observed from the bulkhead level to$2K due
ECB03/04/2026At the time of inspection, active jobsite i observed pipe scaffolds not as per code while using, upon request installation inspection report prior to use as per code 3314.4.3.3 non was onsite or made available$10K due
ECB03/04/2026At the time of inspection of a 7-story new building, active jobsite with supported pipe scaffolds installation operation ongoing upon requesting orientation for the workers installing pipe scaffolds non was pre$25K due
ECB03/04/2026At the time of inspection of a 7-story new building, observed supported pipe scaffolds erected at all exposures that were not maintained in accordance with code. Scaffolds were not fully planked and were missin$10K due
ECB03/04/2026At the time of inspection of a 6-story new building, active construction site i noticed inadequate housekeeping 1ST floor to roof and sidewalk shed deck not free of debris, this creates unsafe working condition$12K due
ECB02/03/202628-103.8. Failure to maintain embed safety straps installation inspection log book on site. As noted: at time of inspection on an active jobsite of a proposed 7 story building already at the bulkhead level of a$6K due
ECB02/03/2026Failure to maintain adequate housekeeping per section requirement. As noted: at time of inspection at a jobsite of a proposed 7 story building already at the bulkhead level. Observed from the 1ST floor level mi$12K due
ECB02/03/2026Failure to institute safety equip measures or temporary construction "improper guardrails". As noted: at time of inspection at an active jobsite of a proposed 7 story building already at the rooftop/bulkhead le$25K due
ECB12/26/2025Failure to comply with commissioner's order to file a certificate of correction with the department of building. Failure to file coc with the DOB. Remedy: file a certificate of correction file certificate of co$6K due
ECB10/28/20257-story proposed new building,active jobsite during my inspection i observed pipe scaffolds erected exp#2-3 not maintainer as per code 3314.1 pipe scaffold erected exp#2-3 not fully plank missing,toe broad,miss$10K due
ECB05/13/2025Observed 2ND story slab poured of a 7 story NB with no ohp for adj.property egress and yard EXP2,BC3309.1 stipulates protection required for adj.public and private property, including persons thereon, shall be$10K due
ECB12/19/2024Temporary construction fencing under DOB permit# X00776731 being extended up to eight feet high in contrary to approved plans (eq-022.00)., conform work to approved construction documents/amendments$500 due
ECB06/14/20243303.14 at a closed foundation jobsite.a large amount of stand still water at open excavation area accumulating.as per section 3303.14-3303.14.5.dewatering at construction site excavation shall be drained.this$1K due
ECB05/07/2024Temporary construction fencing unstable post at exposure#2 leaning outwards., comply with code$5K due
ECB01/08/2024Pedestrian protection does not meet code specifications. At time of inspection i observed inadequate material and machinery stored in open space materials stored higher then barriers. Remedy: comply with code.$2K due
ECB06/18/2026Failure to institute safety equip measures or temporary construction "improper guardrail". As noted: at time of inspection at an active jobsite of a proposed 7 story building already at the bulkhead level. ObseHearing held — result not yet published$5K proposed
ECB06/18/2026Failure to maintain adequate housekeeping per section requirements. Asnoted: at time of inspection at a jobsite of a proposed 7 story building already at the bulkhead level. Observed from the bulkhead level toHearing held — result not yet published$2K proposed
ECB05/05/2023Standing water. At time of inspection i observed standing water approx. 4 inches deep throughout jobsite creating a health hazard from mosquitoes and other insects and rodents also creating a slip and fall hazaNothing owed — awaiting certificate of correction
ECB05/05/2023Required means of egress. At time of inspection i observed wood ladder used for egress not properly secured and with step height inadequate and large spaces in between steps creating a hazardous condition forNothing owed — awaiting certificate of correction
ECB03/06/2023At the time of inspection, observed damaged sidewalk at exposure 1, rear yard pavement for EXP2 property (3147 tibbett ave) and separation between asphalt paving and curb at exposure 4 parking lot(3130 irwin avNothing owed — awaiting certificate of correction
ECB03/14/2022Job site fence not constructed or maintained pursuant to subsection. I observed missing panels from the fence at exposure #3 and exposure #4, comply with codeNothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB10/04/2023Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2023; DOB's record still lists it as active