← Back
Condo, commercial tower (mixed-use) [derived]
3060 BROADWAY
MANHATTAN · BIN 1059648
💬 Discuss this project
1913Year Built
6Stories
RCBuilding Class
R8Zoning
57,546 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized12 Open Violations ▸FISP: SAFE
Condo, commercial tower (mixed-use) [derived] · Owner of record: BLUE SKY 3060 BROADWAY LLC · 9,983 sf lot · 5.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BARNARD COLLEGE907/08/2026
PLATINUM SERVICES NY1107/08/2026
RENTAL MANAGEMENT ASSOCIATES507/08/2026
BARNARD COLLEGE - COLUMBIA UNIVERSI304/09/2026
BLUE SKY 3060 BROADWAY LL103/22/2026
3060 BROADWAY LLC103/22/2026
3060 BROADWAY PROPERTY LL103/22/2026
PIKUS103/22/2026
SKYWORX CONTRACTING INC303/21/2026
ASSISTANT SECRETARY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BILLAH ENGINEERING PLLC105/29/2025
PACE ENGINEERING P.C.204/11/2023
ASHRAF CORP305/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SMEP DESIGN & CONSULTATION LLC203/21/2026
INSHA BUILDING CONSULTANTS203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TITAN CONSTRUCTION SERVICGeneral Contractor507/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
INNOVATING SIGNS & PRINTIGeneral Contractor207/08/2026
MELVYN ZWEBNERElectrical203/21/2026
TORRES IVANElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
S & P CONSTRUCTION MGMT.IElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369105/29/2025
AK ENGINEERING PC678204/11/2023
PACE ENGINEERING P.C.1679204/11/2023
Building Lifecycle
All (107)Filed (7)Permit Issued (10)Signed Off (4)Facade (FISP) (23)Violation (53)Inspection (1)Objection (2)Special Inspection (7)
07/06/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01364467-I1
06/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2026
Cycle 10 facade report signed — SAFE
04/16/2026
Cycle 10 facade report submitted
03/20/2026
Cycle 10 facade inspection completed
03/19/2026
Permit issued — Suspended Scaffold
M01364467-I1-SC
03/13/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01364467-I1
10/22/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00710639-I1
10/22/2025
Signed off — Alteration
M00675184-I1
10/07/2025
Permit issued — General Construction
M01215652-I1-GC
07/11/2025
Permit issued — General Construction
M01215652-I1-GC
06/16/2025
Objection resolved — Addressed
06/13/2025
Objection raised — Cost
05/29/2025
Filed — Alteration
ERECT A NEW STOREFRONT AWNING FOR THE CORNER COMMERCIAL SPACE (DELI) AS PER PLANS.
M01215652-I1
05/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
04/24/2025
Special inspection requirement — Final
RONALD VILLANO
02/08/2024
Violation issued (ECB, closed)
Local Law
02/06/2024
Cycle 9 facade report signed — SAFE
01/04/2024
Signed off — Alteration
M00643810-I1
12/28/2023
Cycle 9 facade inspection completed
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Special inspection requirement — Masonry
Baris Acar
06/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Baris Acar
06/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
06/20/2023
Special inspection requirement — Final
Baris Acar
06/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Baris Acar
06/13/2023
Permit issued — General Construction
M00643810-I1-GC
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2023
Filed — Alteration
M00643810-P1
03/15/2023
Violation issued (HPD, closed)
A
02/09/2023
Permit issued — Supported Scaffold
M00710639-I1-SF
02/09/2023
Permit issued — Sidewalk Shed
M00675184-I1-SH
12/01/2022
Cycle 9 facade report submitted
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/2022
Permit issued — General Construction
M00643810-I1-GC
06/09/2022
Violation issued (HPD, open)
A
06/09/2022
Violation issued (HPD, closed)
C
06/09/2022
Violation issued (HPD, open)
A
06/09/2022
Violation issued (HPD, closed)
C
06/09/2022
Violation issued (HPD, open)
A
06/09/2022
Violation issued (HPD, open)
C
06/09/2022
Violation issued (HPD, open)
A
06/09/2022
Violation issued (HPD, open)
A
06/09/2022
Violation issued (HPD, open)
A
05/23/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00710639-P1
05/06/2022
Permit issued — General Construction
M00643810-I1-GC
04/13/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00710639-I1
04/13/2022
Permit issued — Supported Scaffold
M00710639-I1-SF
04/06/2022
Filed — Alteration
M00643810-I1
02/21/2022
Cycle 9 facade report submitted
02/21/2022
Cycle 9 facade report signed — UNSAFE
02/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2022
Permit issued — Sidewalk Shed
M00675184-I1-SH
02/17/2022
Cycle 9 facade inspection completed
02/16/2022
Filed — Alteration
M00675184-I1
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
I
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S03/19/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATING SIGNS & PRINTI10/07/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATING SIGNS & PRINTI07/11/2025
DOB NOWGeneral ConstructionSigned-offTITAN CONSTRUCTION SERVIC06/13/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC02/09/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/09/2023
DOB NOWGeneral ConstructionSigned-offTITAN CONSTRUCTION SERVIC06/24/2022
DOB NOWGeneral ConstructionSigned-offTITAN CONSTRUCTION SERVIC05/06/2022
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC04/13/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/17/2022
BISEQISSUEDJJS BUILDERS08/10/2018
BISOTISSUEDTRICE CONTRACTING INC01/23/2018
BISEQISSUEDSKYWORX CONTRACTING INC08/04/2017
BISOTISSUEDMY CONTRACTING COMPANY I*08/04/2016
BISEQISSUEDOUTDOOR INSTALLATIONS LLC04/30/2007
BISOTISSUEDCOMPUSITE TURNKEY CONSTRUCTION06/24/1998
BISOTISSUEDCOMPUSITE TURNKEY CONSTRUCTION01/30/1998
BISOTISSUEDCOMPUSITE TURNKEY CONSTRUCTION06/06/1997
BISFSISSUEDABILENE, INC07/26/1993
3 projects · most recent 07/15/2022
General Wiring
FiledStatusContractorScope
07/15/2022Permit IssuedROBERT CHIMENTI5 meters, 1 new_meters
04/07/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
02/21/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 03/13/2026
FiledStatusContractorScope
03/13/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/29/2025Tenant Protection Plan ComplianceLuis Pichardospecial
04/24/2025FinalRONALD VILLANOprogress
06/20/2023MasonryBaris Acarspecial
06/20/2023Structural Stability – Alterations of existing buildingsBaris Acarspecial
06/20/2023Tenant Protection Plan ComplianceAri Kamospecial
06/20/2023FinalBaris Acarprogress
06/20/2023Energy Code Compliance InspectionsBaris Acarprogress
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/02/2026M00675184-I1Request digital key ↗
09/02/2026M00710639-P1Request digital key ↗
09/02/2026M00710639-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION4
08/14/2018140673563Open ↗
01/23/2018140688780Open ↗
08/04/2017140673563Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/19/2017140688780Open ↗
07/26/2017140673563Open ↗
04/08/2016122728183Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/12/2020123922620Open ↗
06/12/2020123922620Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00675184-I1Open ↗
09/02/2026M00710639-I1Open ↗
08/31/2026M00643810-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/18/2026M01215652-I1Open ↗
08/30/2026M00643810-I1Open ↗
08/30/2026M00643810-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/03/2016122728183Open ↗
04/01/2016122728183Open ↗
04/01/2016122728183Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/18/2026M01215652-I1Open ↗
08/30/2026M00643810-I1Open ↗
08/30/2026M00643810-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/19/2017140688780Open ↗
07/26/2017140673563Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/19/2017140688780Open ↗
07/26/2017140673563Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/19/2017140688780Open ↗
07/26/2017140673563Open ↗
▸Safety & Tenant Protection10
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist5
09/02/2026M00710639-I1Open ↗
08/13/2026M00710639-P1Open ↗
08/13/2026M00643810-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes3
06/06/2016122728183Open ↗
04/01/2016122728183Open ↗
09/19/2017140688780Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
09/19/2017140688780Open ↗
07/26/2017140673563Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/01/2016122728183Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/19/2017140688780Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/31/2026M00643810-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/03/2016122728183Open ↗
04/01/2016122728183Open ↗
04/01/2016122728183Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/19/2017140688780Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/03/2016122728183Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/19/2017140688780Open ↗
▸BISNYCECC ANALYSIS1
09/19/2017140688780Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/19/2017140688780Open ↗
07/26/2017140673563Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/03/2016122728183Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/03/2016122728183Open ↗
▸BISSUPERSEDING LETTER1
08/14/2018140673563Open ↗
▸BISSHED LETTER1
08/14/2018140673563Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M01364467-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00643810-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/19/2017140688780Open ↗
11/03/2016122728183Open ↗
04/01/2016122728183Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET2
09/19/2017140688780Open ↗
07/26/2017140673563Open ↗
▸BISEFILING COVER SHEET2
06/10/2020123922620Open ↗
04/08/2016122728183Open ↗
▸BISADDITIONAL INFORMATION1
08/04/2017140673563Open ↗
▸BISBOROUGH INTAKE FORM1
06/10/2020123922620Open ↗
▸Other Documents4
▸DOB NOWDHCR Document2
08/13/2026M00643810-I1Open ↗
08/13/2026M00643810-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/08/2016122728183Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01364467-I1Open ↗