ECB03/10/2018WORK W/O A PERMIT. WORK NOTED: STEEL STAIR CAGE INSTALLED (ATTACHED TO2ND FLOOR STEEL BEAMS SUPPORTING BALCONY) FROM 2D FLOOR TO GRADE LEVE L AT SIT YARD ALONG WEST 23 ST, 90% WORK COMPLETED. ALL WORK PERFORMEDNothing owed — awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.