Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTemporary personnel hoist installationUnder Construction5 filings
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01353032-I1
On file for this project
85 documents · 6 drawing sheets
Project X01480808Permit Issued · 10/28/2026
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Project X01475223Permit Issued · 10/19/2026
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Latest 3 of 5 filings on this floor.
RoofUnder Construction2p · 3 filings
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Structural · Supported Scaffold
Project X01475222Permit Issued · 10/19/2026
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Project X01475243Permit Issued · 10/19/2026
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Full demolition application of a two (2) story with cellar building.
On file for this project
14 documents · 2 drawing sheets
Floor 3Unit 3X11Under Construction1 filing
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Structural · Supported Scaffold
Project X01484070Permit Issued · 11/06/2026
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Floor 2Under Construction2p · 1 filing
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Structural · Supported Scaffold
Full demolition application of a two (2) story with cellar building.
On file for this project
14 documents · 2 drawing sheets
Floor 1Under Construction2p · 1 filing
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Foundation · General Construction · Plumbing · Protection and Mechanical Methods · Standpipe · Structural · Supported Scaffold · Support of Excavation
Full demolition application of a two (2) story with cellar building.
On file for this project
14 documents · 2 drawing sheets
Site & exteriorTemporary sidewalk shed installationUnder Construction4 filings
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Standpipe · Structural · Supported Scaffold
Project X01475222Permit Issued · 10/19/2026
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Project X01475243Permit Issued · 10/19/2026
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Project X01468236Permit Issued · 10/13/2026
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 drawing sheets
Latest 3 of 4 filings on this floor.
Filed — no permit issuedEngineered enclosure system installation1 filing · 3 docs
ArchitectureGeneral
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 3 drawing sheets