Elevator apt, fireproof with stores
307 3 AVENUE
MANHATTAN · BIN 1091824
💬 Discuss this project
2024Year Built
19Stories
D6Building Class
C2-8AZoning
110,672 sfGross Floor Area
70Units
11 Open Violations 1 unresolved · 10 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: SNAKE RIVER DEVELOPMENT · 7,228 sf lot · 15.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Permit Issued — active, not yet Signed-off
Roof39p · 12 filings · 20 docs
Floor 18Under Construction24p · 1 filing · 20 docs
Floor 17Under Construction23p · 1 filing · 20 docs
Floor 16Under Construction23p · 1 filing · 20 docs
Floor 15Under Construction20p · 1 filing · 20 docs
Floor 14Under Construction23p · 1 filing · 20 docs
Floor 13Under Construction20p · 1 filing · 20 docs
Floor 12Under Construction21p · 1 filing · 20 docs
Floor 11Under Construction17p · 1 filing · 20 docs
Floor 10Under Construction15p · 1 filing · 20 docs
Floor 9Under Construction15p · 1 filing · 20 docs
Floor 8Under Construction15p · 1 filing · 20 docs
Floor 7Under Construction15p · 1 filing · 20 docs
Floor 6Under Construction20p · 1 filing · 20 docs
Floor 5Under Construction21p · 2 filings · 20 docs
Floor 4Under Construction20p · 1 filing · 20 docs
Floor 3Under Construction22p · 1 filing · 20 docs
Floor 2Under Construction29p · 1 filing · 20 docs
Floor 1Under Construction157p · 6 filings · 20 docs
CellarUnder Construction145p · 4 filings · 20 docs
1 job · most recent 08/10/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/10/2026Permit IssuedRETAIL EXPERTS INCAir Conditioning Systems
Cooling
— SLIP-IN QUA 880 CFM · Electric Heater ×3
Mitsubishi Electric TLGHF0940RVX02 860 CFM · Erv ×2
Carrier 37MUHAQ60AA3 5 tons · Wshp ×1
__Junk__ 1648CL 1,250 kW · Radiant ×1
2 jobs · most recent 08/18/2026
Sprinkler System
FiledStatusContractorScope
08/18/2026Permit IssuedKG SPRINKLER CORPSprinkler System
08/10/2026Permit IssuedBUCKMILLER AUTO.SPKLR.COR32 heads
2 jobs · most recent 08/18/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/18/2026Permit IssuedDONATO PLUMBING GROUP INCGas, Storm, Water/Sanitary
08/10/2026Permit IssuedLIQUID PLBG & HTNG SCS INWater/Sanitary
20 jobs · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Pending Payment VerificationSOSA ELECTRIC LLCGeneral Wiring
09/23/2026Pending Payment VerificationSOSA ELECTRIC LLCGeneral Wiring
09/11/2026Permit IssuedPROSTO ELECTRIC CORPGeneral Wiring
08/20/2026CompleteSOSA ELECTRIC LLCGeneral Wiring
08/13/2026CompletePK ELECTRIC INC—
08/13/2026CompletePK ELECTRIC INC—
08/13/2026CompletePK ELECTRIC INC—
02/10/2026CompleteMACK ELECTRICAL INC—
09/18/2025Permit IssuedMACK ELECTRICAL INCGeneral Wiring
05/19/2025CompleteHOME RUN ELECTRIC—
01/29/2025Permit IssuedJAM ELECTRICAL CORP—
10/29/2024CompleteMACK ELECTRICAL INCGeneral Wiring
10/29/2024Permit IssuedMACK ELECTRICAL INCGeneral Wiring
09/19/2024CompleteSOLAS ELECTRICAL CORP—
09/11/2024CompleteSOLAS ELECTRICAL CORP—
2 jobs · most recent 08/18/2026
Steel Concrete
FiledStatusContractorScope
08/18/2026Permit IssuedTITANIUM CONSTRUCTION SERSteel, Concrete
08/10/2026Permit IssuedBUCKMILLER AUTO.SPKLR.COR2 scope_items
4 jobs · most recent 01/22/2026
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
01/22/2026Signed-offSNG BRICK AND STONE INCScaffold
02/28/2025Signed-offCONSOLIDATED SCAFFOLDINGScaffold, Sidewalk Shed
06/24/2024Signed-offVOLK INDUSTRIAL SERVICESFence
01/04/2024Signed-offVOLK INDUSTRIAL SERVICESFence
Building Lifecycle
All (296)Filed (55)Permit Issued (59)Signed Off (20)Violation (18)Inspection (34)Objection (80)Special Inspection (30)
09/21/2026
Permit issued — Sprinklers
M01441469-S2-EW-SP
09/11/2026
Permit issued — Plumbing
M01441469-S1-PL
09/03/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/25/2026
Permit issued — General Construction
M01440506-I1-GC
08/18/2026
Filed — New Building
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB # M00992159-I1
M00992159-P7
08/18/2026
Permit issued — Mechanical Systems
M01441469-I1-MS
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
08/10/2026
Filed — Alteration
INSTALLATION OF 32 SPRINKLER HEADS ON FLOOR 001. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01441469-S1
08/10/2026
Filed — Alteration
INSTALLATION OF 32 SPRINKLER HEADS ON FLOOR 001. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01441469-I1
08/10/2026
Filed — Alteration
INSTALLATION OF 32 SPRINKLER HEADS ON FLOOR 001. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01441469-S2
08/06/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01135194-I1
08/06/2026
Signed off — Alteration
M01067611-I1
08/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Vincent Liotta
08/05/2026
Filed — Alteration
ALTERATION FOR INTERIOR WORK TO NON-BEARING PARTITIONS AT FIRST FLOOR
M01440506-I1
08/05/2026
Special inspection requirement — Sprinkler Systems
Vincent Liotta
08/04/2026
Permit issued — General Construction
M00992159-I1-GC
07/06/2026
Objection resolved — Open
07/02/2026
Objection raised — Other
06/23/2026
Filed — New Building
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB # M00992159-I1
M00992159-P6
05/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/13/2026
Signed off — Alteration
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002-Option B
M01286073-I1
05/08/2026
Permit issued — Mechanical Systems
M00992159-S7-MS
05/01/2026
Permit issued — Construction Fence
M01067611-I1-FN
04/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/07/2026
Violation issued (ECB, open)
Construction
04/07/2026
Violation issued (ECB, open)
Construction
04/07/2026
Violation issued (ECB, open)
Construction
04/07/2026
Violation issued (ECB, open)
Construction
04/01/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/10/2026
Special inspection requirement — Fenestration areas
Zoltan Saro
03/10/2026
Special inspection requirement — Air barrier continuity plan testing
Zoltan Saro
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
03/10/2026
Special inspection requirement — Lowest Floor Elevation
JOHN MCMONAGLE
03/10/2026
Special inspection requirement — Air barrier - visual inspection
Zoltan Saro
03/10/2026
Special inspection requirement — Protection of exposed foundation insulation
Zoltan Saro
03/10/2026
Special inspection requirement — Vestibules
Zoltan Saro
03/10/2026
Special inspection requirement — Insulation placement and R values
Zoltan Saro
03/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Zoltan Saro
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
03/10/2026
Special inspection requirement — Fenestration air leakage
Zoltan Saro
03/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
03/10/2026
Special inspection requirement — Masonry
JOHN MCMONAGLE
03/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/03/2026
Filed — New Building
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB # M00992159-I1
M00992159-P5
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
03/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
03/03/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
03/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
03/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
03/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
02/27/2026
Filed — New Building
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB # M00992159-I1
M00992159-P4
Latest 60 of 296 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NAFTALI GROUP8009/22/2026
BNS REAL ESTATE1507/08/2026
ALBA SERVICES404/09/2026
CONSOLIDATED SCAFFOLDING INC.1103/22/2026
TITANIUM CONSTRUCTION SER1103/22/2026
TITATINUM CONSTRUCTION SE203/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM1603/21/2026
AE DESIGN SOLUTION1403/21/2026
DOMANI CONSULTING2403/21/2026
HIERARCH-E203/21/2026
CONSTRUCTION PERMIT SERVICES1003/21/2026
PS ENGINEERS203/21/2026
CCM CONSULTING GROUP, INC.203/21/2026
KAZAM CONSULTANTS203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TITANIUM CONSTRUCTION SERGeneral Contractor2308/26/2026
VOLK INDUSTRIAL SERVICESGeneral Contractor2007/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor1507/08/2026
KG SPRINKLER CORPFire Protection607/08/2026
SNG BRICK AND STONE INCGeneral Contractor407/08/2026
DONATO PLUMBING GROUP INCPlumbing307/08/2026
SOLAS ELECTRICAL CORPElectrical203/22/2026
LEVEST ELECTRIC CORPGeneral Contractor207/08/2026
RETAIL EXPERTS INCGeneral Contractor208/26/2026
VERTICAL SOLUTIONS INCGeneral Contractor207/08/2026
AURA PLUMBING INCPlumbing207/08/2026
NATIONAL MAINTENANCEScaffold107/08/2026
BUCKMILLER AUTO.SPKLR.CORFire Protection109/22/2026
LIQUID PLBG & HTNG SCS INPlumbing109/13/2026
ALBA SERVICES INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431408/18/2026
VINCENT J. LIOTTA P. E.1974208/10/2026
CATALPA SPECIAL INSPECTIO2004108/05/2026
LEO Y LEE ASSOCIATES2481401/21/2026
FRANCISCO D. PEREZ PE3306104/17/2025
ANCORA ENGINEERING, PLLC6818607/08/2024
DESIMONE CONSULTING ENGIN5942202/26/2024
KMB DESIGN GROUP, LLC513306/15/2023
R MARSAC CONSULTING LLC329203/03/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedBUCKMILLER AUTO.SPKLR.COR09/21/2026
DOB NOWPlumbingPermit IssuedLIQUID PLBG & HTNG SCS IN09/11/2026
DOB NOWGeneral ConstructionPermit IssuedRETAIL EXPERTS INC08/25/2026
DOB NOWMechanical SystemsPermit IssuedRETAIL EXPERTS INC08/18/2026
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER08/04/2026
DOB NOWMechanical SystemsSigned-offTITANIUM CONSTRUCTION SER05/08/2026
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER05/01/2026
DOB NOWSupported ScaffoldSigned-offSNG BRICK AND STONE INC01/14/2026
DOB NOWGeneral ConstructionSigned-offTITANIUM CONSTRUCTION SER12/08/2025
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING12/03/2025
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER11/26/2025
DOB NOWSuspended ScaffoldPermit IssuedSNG BRICK AND STONE INC11/13/2025
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER10/17/2025
DOB NOWStandpipePermit IssuedH M SPRINKLER INC09/05/2025
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC09/05/2025
DOB NOWStandpipePermit IssuedH M SPRINKLER INC09/03/2025
DOB NOWPlumbingPermit IssuedDONATO PLUMBING GROUP INC08/07/2025
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER08/07/2025
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER07/18/2025
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER05/22/2025
DOB NOWMechanical SystemsSigned-offTITANIUM CONSTRUCTION SER05/07/2025
DOB NOWSuspended ScaffoldSigned-offWKR CONSTRUCTION INC04/21/2025
DOB NOWSupported ScaffoldSigned-offSNG BRICK AND STONE INC01/17/2025
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING12/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING11/27/2024
DOB NOWSuspended ScaffoldPermit IssuedSNG BRICK AND STONE INC11/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offALBA SERVICES INC10/01/2024
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER09/12/2024
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER08/19/2024
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC08/13/2024
DOB NOWStandpipePermit IssuedH M SPRINKLER INC08/13/2024
DOB NOWStandpipePermit IssuedH M SPRINKLER INC08/13/2024
DOB NOWPlumbingPermit IssuedDONATO PLUMBING GROUP INC08/13/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING GROUP INC08/06/2024
DOB NOWFoundationSigned-offTITANIUM CONSTRUCTION SER06/25/2024
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER06/21/2024
DOB NOWSupport of ExcavationSigned-offTITANIUM CONSTRUCTION SER06/21/2024
DOB NOWFull DemolitionSigned-offVOLK INDUSTRIAL SERVICES04/24/2024
DOB NOWFull DemolitionSigned-offVOLK INDUSTRIAL SERVICES04/19/2024
DOB NOWConstruction FenceSigned-offVOLK INDUSTRIAL SERVICES03/14/2024
+ 11 more permits on file
▾Field Inspections (DOB CAP) — 34
DateTypeResultReport
09/03/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/22/2026Pass-Final SD - Fire PumpPassView ↗
01/15/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/12/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 34.
▾Special Inspection Requirements (DOB NOW) — 117
DateRequirementInspectorRole
08/17/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/17/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/17/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
08/17/2026Maintenance informationJOHN MCMONAGLEenergy_progress
08/17/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
08/06/2026Tenant Protection Plan ComplianceVincent Liottaspecial
08/05/2026Sprinkler SystemsVincent Liottaspecial
03/10/2026Air barrier - visual inspectionZoltan Saroenergy_progress
03/10/2026Protection of exposed foundation insulationZoltan Saroenergy_progress
03/10/2026Fenestration areasZoltan Saroenergy_progress
03/10/2026Air barrier continuity plan testingZoltan Saroenergy_progress
03/10/2026Insulation placement and R valuesZoltan Saroenergy_progress
03/10/2026Fenestration and door U-factor and product ratingsZoltan Saroenergy_progress
03/10/2026Lowest Floor ElevationJOHN MCMONAGLEprogress
03/10/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
03/10/2026Fenestration air leakageZoltan Saroenergy_progress
03/10/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
03/10/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/10/2026MasonryJOHN MCMONAGLEspecial
03/10/2026VestibulesZoltan Saroenergy_progress
03/03/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
03/03/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
03/03/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
03/03/2026Maintenance informationJOHN MCMONAGLEenergy_progress
Latest 25 of 117.
▾Documents — 293 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch52
08/30/2026M00888673-I1Request digital key ↗
08/28/2026M00963142-I1Request digital key ↗
08/28/2026M00963142-S2Request digital key ↗
Showing 3 of 52 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00153934-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00298959-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/27/2025124055627Open ↗
08/29/2024141026271Open ↗
▸BISWORK PERMIT APPLICATION1
09/03/2024141026271Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/15/2026M00992159-P6Open ↗
Showing 1 of 5 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/24/2025124055627Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/24/2025124055627Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/24/2025124055627Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications133
▸DOB NOWDPL-1: Design Professional Seal & Signature53
09/04/2026M00298959-I1Open ↗
08/31/2026M00846740-I1Open ↗
08/30/2026M00888673-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWProgress Inspector Seal & Signature43
09/01/2026M00992159-P3Open ↗
09/01/2026M00992159-P3Open ↗
09/01/2026M00992159-P3Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/23/2026M01441469-S2Open ↗
09/23/2026M00992159-P5Open ↗
09/18/2026M00992159-P1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/29/2024141026271Open ↗
06/18/2024141025502Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/29/2024141026271Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/29/2024141026271Open ↗
▸Trade Schedules & Equipment14
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWElectric Cut-Off2
08/15/2026M00963359-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWGas Cut-Off2
08/15/2026M00963359-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWWater Cut-Off2
08/15/2026M00963359-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWSewer Cut-Off2
08/15/2026M00963359-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/12/2024141025502Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/12/2024141025502Open ↗
▸BISSTREET TREE CHECKLIST1
06/12/2024141025502Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00298959-I1Open ↗
08/30/2026M00888673-I1Open ↗
08/15/2026M00846740-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026M00963142-I1Open ↗
08/15/2026M00963359-I1Open ↗
▸DOB NOWRodent Control2
08/15/2026M00963359-I1Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/18/2025141026271Open ↗
11/18/2025141026271Open ↗
09/03/2024141026271Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWConcrete Testing Exception Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/25/2025124055627Open ↗
07/24/2025124055627Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/19/2025141026271Open ↗
▸BISFINAL1
11/19/2025141026271Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
06/27/2025124055627Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/29/2024141026271Open ↗
▸BISADDITIONAL INFORMATION1
06/12/2024141025502Open ↗
▸Other Documents42
▸DOB NOWProperty Ownership Certification8
08/28/2026M00963142-I1Open ↗
08/28/2026M00963359-P1Open ↗
08/28/2026M00963359-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWManufacturer's Specifications5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWCalculations5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStructure Photographs4
08/28/2026M00963359-P1Open ↗
08/28/2026M00963359-P2Open ↗
08/15/2026M00963359-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCommunity Board Notification2
08/15/2026M00963359-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWFull Demo: 10-Day Notice2
08/15/2026M00963359-I1Open ↗
Showing 1 of 2 on file for this type
▸BISBPP-51
01/27/2026141025502Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/12/2024141025502Open ↗
▸BISPLOT DIAGRAM1
07/25/2025124055627Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type