← Back
Walk-up apt, over six families with stores
307 WEST 39 STREET
MANHATTAN · BIN 1013685
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
C6-4Zoning
10,100 sfGross Floor Area
17Units
Rent Stabilized7 Open Violations 6 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: NOVITA LLC · 2,468 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof15p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 511p · 1 filing · 20 docs
Floor 45p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 115p · 3 filings · 20 docs
Cellar30p · 5 filings · 20 docs
Basement1p · 1 filing · 20 docs
1 job · most recent 08/15/2025
Sprinkler System
FiledStatusContractorScope
08/15/2025Signed-offORBIT SPRINKLER CORPSprinkler System
2 jobs · most recent 08/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/15/2025Permit IssuedLG ELITE PLUMBING INCGas, Water/Sanitary
11/04/2024——Gas
5 jobs · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026CompleteTRIZA ELECTRICAL CORPGeneral Wiring
03/13/2026Permit IssuedVOLTRON ELECTRIC LLC—
10/10/2025Permit IssuedTRIZA ELECTRICAL CORPGeneral Wiring
06/21/2023CompleteMEGA ELEC'L CONTR'G, INC—
06/16/2022CompleteBDS ELECTRIC CORP.—
1 job · most recent 05/18/2023
Steel Concrete Masonry
FiledStatusContractorScope
05/18/2023——Steel, Concrete, Masonry
Building Lifecycle
All (248)Filed (44)Permit Issued (36)Signed Off (16)Violation (60)Inspection (17)Objection (45)Special Inspection (30)
03/11/2026
Permit issued — Sign
M01355002-I1-SG
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
02/26/2026
Objection raised — Scope
02/26/2026
Objection raised — Other
02/26/2026
Objection raised — Scope
02/26/2026
Objection raised — Other
02/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/03/2026
Filed — Alteration
PROPOSE TO INSTALL BEW ILLUMINATED PLEXI LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE THAT IS ALSO NON-FLASHING AND NON-ADVERTISING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01355002-I1
12/29/2025
Signed off — Alteration
Interior Renovations with repair to fire and water damage and 1 story rear extension. Adding stucco for facade.
M00704722-S2
12/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/04/2025
Signed off — Alteration
M01096238-I1
12/02/2025
Signed off — Alteration
Interior Renovations with repair to fire and water damage and 1 story rear extension. Adding stucco for facade.
M00704722-S5
12/01/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/24/2025
Signed off — Alteration
Interior Renovations with repair to fire and water damage and 1 story rear extension. Adding stucco for facade.
M00704722-I1
11/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2025
Signed off — Alteration
Interior Renovations with repair to fire and water damage and 1 story rear extension. Adding stucco for facade.
M00704722-S4
09/19/2025
Objection resolved — Addressed
09/17/2025
Objection resolved — Addressed
09/16/2025
Objection raised — Admin
08/25/2025
Special inspection requirement — Interior lighting power
ZHENHUAN XU
08/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/25/2025
Special inspection requirement — Lighting controls
ZHENHUAN XU
08/25/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
08/25/2025
Special inspection requirement — Final
ZHENHUAN XU
08/22/2025
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
08/22/2025
Special inspection requirement — Shutoff dampers
ZHENHUAN XU
08/22/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
08/22/2025
Special inspection requirement — Final
ZHENHUAN XU
08/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
08/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
08/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
08/22/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/15/2025
Filed — Alteration
Interior renovation to existing commercial space in cellar and on first floor as shown on plans. No change to egress use or occupancy.
M01234015-P4
08/15/2025
Filed — Alteration
Interior renovation to existing commercial space in cellar and on first floor as shown on plans. No change to egress use or occupancy.
M01234015-P2
08/15/2025
Filed — Alteration
Interior renovation to existing commercial space in cellar and on first floor as shown on plans. No change to egress use or occupancy.
M01234015-P3
08/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/15/2025
Special inspection requirement — Sprinkler Systems
NARESH MAHANGU
08/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
08/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
08/13/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
08/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
08/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/12/2025
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
08/12/2025
Special inspection requirement — Interior lighting power
ZHENHUAN XU
08/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/11/2025
Filed — Alteration
Interior renovation to existing commercial space in cellar and on first floor as shown on plans. No change to egress use or occupancy.
M01234015-P1
07/21/2025
Permit issued — Sprinklers
M01234015-S3-EW-SP
Latest 60 of 248 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MY FRIEND CONSTRUCTION13407/08/2026
CELTIC SERVICES NYC607/08/2026
8203 3RD AVE PROPERTY404/09/2026
NOVITA4803/22/2026
VAGGELAS CONSTRUCTION GRO1003/22/2026
CONSTRUCTION GR* VAGGELAS103/22/2026
307 WEST RESTURANT CORP103/22/2026
OWNER:307 W.39TH ST103/22/2026
OWNER OF 307 WEST 39 S103/22/2026
307 WEST 39 REALTY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1403/21/2026
JLS DESIGNS1203/21/2026
NAGAN EX CONSULTANTS3803/21/2026
ARCHI PRO GROUP203/21/2026
A1 EXPEDITING SERVICE203/21/2026
SANDEEP KAUR103/21/2026
IDA DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VAGGELAS CONSTRUCTION GR*General Contractor2107/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor1307/08/2026
CELTIC SERVICES NYC INCGeneral Contractor807/08/2026
4 BROTHERS & SONS FENCEGeneral Contractor407/08/2026
MASTER 2 PLBG & HTG INCPlumbing207/08/2026
MASTER PLBG AND HTG INCFire Protection207/08/2026
PROSPERITY CONSTRUCTION*General Contractor204/09/2026
A1 SPECIALIZED, INCScaffold107/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
DONE RIGHT HOOD & FIRE SAGeneral Contractor104/09/2026
MY FRIEND CONSTRUCTION LLGeneral Contractor107/08/2026
LG ELITE PLUMBING INCPlumbing106/28/2026
JOSEPH HUANGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669608/15/2025
NKM ENGINEERING PLLC6244208/15/2025
PRUDIGM ENGINEERING LLCU43041507/03/2025
VIBRANALYSIS INC., DBA VT6864606/20/2025
SHAHRISH CONSULTING LLC5702101/21/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedMAD SIGNS INC03/11/2026
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP07/21/2025
DOB NOWGeneral ConstructionPermit IssuedPROSPERITY CONSTRUCTION*06/11/2025
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC06/09/2025
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC06/06/2025
DOB NOWMechanical SystemsPermit IssuedPROSPERITY CONSTRUCTION*06/05/2025
DOB NOWSprinklersSigned-offMASTER PLBG AND HTG INC04/03/2025
DOB NOWGeneral ConstructionSigned-offVAGGELAS CONSTRUCTION GR*03/06/2025
DOB NOWMechanical SystemsSigned-offDONE RIGHT HOOD & FIRE SA01/24/2025
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE12/18/2024
DOB NOWStructuralSigned-offVAGGELAS CONSTRUCTION GR*12/13/2024
DOB NOWMechanical SystemsSigned-offVAGGELAS CONSTRUCTION GR*12/13/2024
DOB NOWConstruction FenceSigned-offVAGGELAS CONSTRUCTION GR*12/13/2024
DOB NOWGeneral ConstructionSigned-offVAGGELAS CONSTRUCTION GR*12/12/2024
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I08/09/2024
DOB NOWFoundationSigned-offVAGGELAS CONSTRUCTION GR*08/02/2024
DOB NOWMechanical SystemsSigned-offVAGGELAS CONSTRUCTION GR*05/30/2024
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC05/20/2024
DOB NOWSprinklersSigned-offMASTER PLBG AND HTG INC05/17/2024
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I05/13/2024
DOB NOWConstruction FenceSigned-offVAGGELAS CONSTRUCTION GR*04/23/2024
DOB NOWStructuralSigned-offMY FRIEND CONSTRUCTION LL04/22/2024
DOB NOWGeneral ConstructionSigned-offVAGGELAS CONSTRUCTION GR*04/22/2024
DOB NOWGeneral ConstructionSigned-offVAGGELAS CONSTRUCTION GR*03/11/2024
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I08/17/2023
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I08/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offEMPIRE NY INSTALLATIONS I08/02/2023
DOB NOWConstruction FenceSigned-offVAGGELAS CONSTRUCTION GR*07/28/2023
DOB NOWGeneral ConstructionSigned-offVAGGELAS CONSTRUCTION GR*06/01/2023
DOB NOWGeneral ConstructionSigned-offVAGGELAS CONSTRUCTION GR*05/16/2023
DOB NOWSidewalk ShedSigned-offCELTIC SERVICES NYC INC04/28/2023
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE01/27/2023
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE06/02/2022
DOB NOWSidewalk ShedSigned-offCELTIC SERVICES NYC INC05/23/2022
DOB NOWGeneral ConstructionSigned-offCELTIC SERVICES NYC INC05/17/2022
DOB NOWStructuralSigned-offCELTIC SERVICES NYC INC02/19/2021
BISOTISSUEDLAKHI GENERAL CONTRACTOR07/11/2008
BISEQISSUEDLAKHI GENERAL CONTRACTOR05/23/2008
BISEQISSUEDLAKHI GENERAL CONTRACTOR05/23/2008
BISOTISSUEDFORZA ITALIA06/06/2003
+ 10 more permits on file
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
02/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/01/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/16/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
06/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/17/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/25/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
08/25/2025Tenant Protection Plan Compliance—special
08/25/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/25/2025Interior lighting powerZHENHUAN XUenergy_progress
08/25/2025Lighting controlsZHENHUAN XUenergy_progress
08/25/2025FinalZHENHUAN XUprogress
08/22/2025Shutoff dampersZHENHUAN XUenergy_progress
08/22/2025Maintenance informationZHENHUAN XUenergy_progress
08/22/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
08/22/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/22/2025Tenant Protection Plan Compliance—special
08/22/2025Mechanical SystemsZHENHUAN XUspecial
08/22/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
08/22/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
08/22/2025HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
08/22/2025FinalZHENHUAN XUprogress
08/15/2025Tenant Protection Plan Compliance—special
08/15/2025Sprinkler SystemsNARESH MAHANGUspecial
08/13/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
08/13/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
08/13/2025Tenant Protection Plan ComplianceZHENHUAN XUspecial
08/13/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/13/2025HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
08/13/2025Maintenance informationZHENHUAN XUenergy_progress
08/13/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
Latest 25 of 150.
▾Documents — 439 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch42
09/02/2026M00625362-I1Request digital key ↗
09/02/2026M00542792-I1Request digital key ↗
09/02/2026M00722854-I1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00449798-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION10
09/15/2023102846663Open ↗
09/14/2023100615728Open ↗
08/24/2023121622654Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit4
08/22/2026M01234015-I1Open ↗
Showing 1 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
07/11/2008110289633Open ↗
05/23/2008110173268Open ↗
05/23/2008110180018Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Seals & Professional Certifications167
▸DOB NOWProgress Inspector Seal & Signature72
09/27/2026M01234015-P3Open ↗
09/27/2026M01234015-P3Open ↗
09/27/2026M01234015-P3Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/02/2026M00722854-I1Open ↗
08/30/2026M00893839-I1Open ↗
08/30/2026M00893820-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/27/2026M01234015-P3Open ↗
09/23/2026M01234015-S3Open ↗
09/05/2026M00704722-A1Open ↗
Showing 3 of 39 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/20/2013121622654Open ↗
08/13/2010120435001Open ↗
02/25/2009110180018Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/10/2008110289633Open ↗
05/21/2008110173268Open ↗
05/21/2008110180018Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/10/2008110289633Open ↗
05/21/2008110173268Open ↗
05/21/2008110180018Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING1
08/13/2010120435001Open ↗
▸Safety & Tenant Protection52
▸DOB NOWHPD-1: Anti-Harassment Area Checklist43
09/02/2026M00722854-I1Open ↗
08/27/2026M00893819-P3Open ↗
08/22/2026M01234015-S2Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWCertificate of No Harassment6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
07/10/2008110289633Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
09/20/2010120435001Open ↗
▸DOB NOWStreet Tree Checklist1
08/24/2026M01172711-I1Open ↗
▸Environmental & Asbestos71
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
08/29/2026M00845577-P2Open ↗
08/29/2026M00845577-P3Open ↗
08/29/2026M00845577-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWOER: Notice to Proceed20
08/22/2026M01234015-I1Open ↗
08/22/2026M01234015-S1Open ↗
Showing 2 of 20 on file for this type
▸DOB NOWOER: Notice of Satisfaction17
08/22/2026M01234015-S1Open ↗
08/22/2026M01234015-I1Open ↗
Showing 2 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
07/10/2008110289633Open ↗
05/21/2008110173268Open ↗
05/21/2008110180018Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/20/2013121622654Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/13/2010120435001Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/20/2013121622654Open ↗
▸Approvals, Objections & Sign-offs6
▸BISADMINISTRATIVE OBJECTIONS4
05/20/2013121622654Open ↗
07/10/2008110289633Open ↗
05/21/2008110173268Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/25/2009110180018Open ↗
08/25/2008110289633Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
05/20/2013121622654Open ↗
08/13/2010120435001Open ↗
08/22/2008110289633Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
05/20/2013121622654Open ↗
08/13/2010120435001Open ↗
07/10/2008110289633Open ↗
▸BISeFiling Job Application Cover Sheet2
05/21/2008110173268Open ↗
05/21/2008110180018Open ↗
▸Other Documents60
▸DOB NOWDHCR Document40
09/02/2026M00722854-I1Open ↗
08/27/2026M00893819-P3Open ↗
08/22/2026M01234015-S1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlot Diagram6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWSite Survey: Initial6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/24/2026M01172711-I1Open ↗