← Back
BRONX
3070 WILLIAMSBRIDGE ROAD
BRONX · BIN 2131248
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Roof1p · 1 filing · 11 docs
Bulkhead3p · 1 filing · 11 docs
Floor 84p · 1 filing · 11 docs
Floor 74p · 1 filing · 11 docs
Floor 64p · 1 filing · 11 docs
Floor 51p · 1 filing · 11 docs
Floor 4
Floor 34p · 1 filing · 11 docs
Floor 25p · 1 filing · 11 docs
Floor 15p · 1 filing · 11 docs
Cellar5p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P GEORGOPOULOS ARCHITECT PC403/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U103/21/2026
Building Lifecycle
All (26)Filed (4)Objection (4)Special Inspection (18)
04/16/2026
Objection raised — Other
04/16/2026
Objection raised — Other
04/16/2026
Objection raised — Other
03/24/2026
Filed — New Building
SUBSEQUENT FOUNDATION AND EARTHWORK APPLICATION FILED HEREWITH.
X01354549-S5
03/24/2026
Filed — New Building
SUBSEQUENT FOUNDATION AND EARTHWORK APPLICATION FILED HEREWITH.
X01354549-S4
03/24/2026
Filed — New Building
SUBSEQUENT FOUNDATION AND EARTHWORK APPLICATION FILED HEREWITH.
X01354549-S6
03/24/2026
Objection raised — Other
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/06/2026
Special inspection requirement — Maintenance information
03/06/2026
Special inspection requirement — Shutoff dampers
03/06/2026
Special inspection requirement — Metering
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
03/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/06/2026
Special inspection requirement — Maintenance information
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/02/2026
Special inspection requirement — Mechanical Systems
03/02/2026
Special inspection requirement — Final
02/04/2026
Filed — New Building
SUBSEQUENT FOUNDATION AND EARTHWORK APPLICATION FILED HEREWITH.
X01354549-I1
Nothing on file for this building.
1 project · most recent 03/24/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/24/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Amana PTC093G 9,200 BTU · Ptac ×106
PTC153G 15,000 BTU · Ptac ×62
Heating
Amana PTC093G 8,500 BTU · Ptac ×106
PTC153G 17,100 BTU · Ptac ×62
Ventilation
Greenheck SQ-97-VG 200 CFM · Exhaust Fan ×61
SP-A125 100 CFM · Exhaust Fan ×3
ERV-10-20H-VG 800 CFM · Erv ×1
SP-A90 50 CFM · Exhaust Fan ×1
1 project · most recent 03/24/2026
Sprinkler System
FiledStatusContractorScope
03/24/2026——Sprinkler System
1 project · most recent 03/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/24/2026——Storm, Water/Sanitary
1 project · most recent 03/24/2026
Concrete
FiledStatusContractorScope
03/24/2026——Concrete
1 project · most recent 03/24/2026
Fence
FiledStatusContractorScope
03/24/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/06/2026Fire-Resistant Penetrations and Joints—special
03/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/06/2026Energy Code Compliance Inspections—progress
03/06/2026HVAC-R and service water heating system controls—energy_progress
03/06/2026HVAC-R and service water piping design and insulation—energy_progress
03/06/2026HVAC-R and service water heating equipment—energy_progress
03/06/2026Maintenance information—energy_progress
03/06/2026Shutoff dampers—energy_progress
03/06/2026Metering—energy_progress
03/06/2026Fire-Resistant Penetrations and Joints—special
03/06/2026Energy Code Compliance Inspections—progress
03/06/2026Fire-Resistance Rated Construction—progress
03/06/2026HVAC-R and service water piping design and insulation—energy_progress
03/06/2026Maintenance information—energy_progress
03/06/2026HVAC-R and service water heating system controls—energy_progress
03/06/2026HVAC-R and service water heating equipment—energy_progress
03/02/2026Mechanical Systems—special
03/02/2026Final—progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026X01354549-I1Request digital key ↗
08/15/2026X01354549-S6Request digital key ↗
08/15/2026X01354549-S4Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01354549-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026X01354549-S6Open ↗
08/17/2026X01354549-S5Open ↗
08/17/2026X01354549-S4Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X01354549-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X01354549-I1Open ↗