← Back
Elevator apt, semi-fireproof with stores
3073 BARKER AVENUE
BRONX · BIN 2054725
💬 Discuss this project
2022Year Built
7Stories
D7Building Class
R7-1Zoning
20,225 sfGross Floor Area
26Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 3073 BARKER AVENUE LLC · 4,254 sf lot · 4.75 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof1p · 1 filing · 2 docs
Floor 21p · 1 filing · 2 docs
Floor 14p · 1 filing · 2 docs
Cellar2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP2307/08/2026
AFFORDABLELIVINGNY1207/08/2026
3073 BARKER AVENUE LLC503/22/2026
PARK MANAGEMENT USA103/22/2026
EDWARD BUILDERS103/22/2026
G-WADO INC203/22/2026
2995 CONEY ISLAND203/21/2026
2279 BARKER AVENUE403/21/2026
2257 GRABD AVE KKC903/21/2026
FLATBUSH T GROUP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/06/2018$660K—FLATBUSH T GROUP LLC → 3073 BARKER AVENUE LLC— not available
11/09/2017$262K—Private party → FLATBUSH T. GROUP LLC— not available
08/29/2013$200K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1803/21/2026
PATUXENT ENGINEERING203/21/2026
ADAM BERGMAN CONSTRUCTION AND DEVEL203/21/2026
ZV Drafting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor2507/08/2026
GV IMPERIAL CONSTGROUP INGeneral Contractor2307/08/2026
SILVERCUP SCFFLDNG I LLCGeneral Contractor1005/29/2026
G-NADO INCGeneral Contractor307/08/2026
TOVIA WERZBERGERElectrical303/21/2026
EDWARD BUILDERS INCGeneral Contractor203/21/2026
ALEXANDER LEVINElectrical103/21/2026
PARK MANAGEMENT USA CORPGeneral Contractor105/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481110/03/2023
BIG APPLE GROUP NY A RMA9168109/30/2021
Building Lifecycle
All (125)Filed (15)Permit Issued (30)Signed Off (10)Violation (60)Inspection (2)Objection (5)Special Inspection (3)
07/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00899866-I1
07/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00899839-I1
07/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00903047-I1
07/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00903066-I1
07/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00899820-I1
04/28/2026
Signed off — Alteration
Install Temporary Wood Construction fence.
X00137109-I1
04/21/2026
Signed off — Alteration
X01226965-I1
03/04/2026
Signed off — Alteration
X00601128-I1
02/23/2026
Objection raised — Scope
02/05/2026
Filed — Alteration
INTERIOR FIT-OUT SCOPE OF WORK FOR COMMUNITY FACILITY USE AT GROUND FLOOR LEVEL FOR DAYCARE.
X01351825-I1
10/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00903047-P1
10/06/2025
Violation issued (ECB, closed)
Construction
07/18/2025
Permit issued — Protection and Mechanical Methods
X00899866-I1-PMM
07/18/2025
Permit issued — Protection and Mechanical Methods
X00899839-I1-PMM
07/18/2025
Permit issued — Supported Scaffold
X00903047-I1-SF
07/07/2025
Permit issued — Sidewalk Shed
X00899820-I1-SH
05/16/2025
Filed — Alteration
X01226965-I1
05/16/2025
Permit issued — Construction Fence
X01226965-I1-FN
04/15/2025
Violation issued (ECB, closed)
Construction
04/15/2025
Violation issued (ECB, closed)
Construction
04/15/2025
Violation issued (ECB, closed)
Construction
01/30/2025
Permit issued — Construction Fence
X00137109-I1-FN
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2024
Violation issued (ECB, closed)
Construction
11/14/2024
Violation issued (ECB, closed)
Construction
11/04/2024
Violation issued (ECB, closed)
Construction
11/04/2024
Violation issued (ECB, closed)
Cranes and Derricks
11/04/2024
Violation issued (ECB, closed)
Construction
10/31/2024
Violation issued (ECB, closed)
Construction
10/30/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2024
Violation issued (ECB, closed)
Construction
07/31/2024
Permit issued — Protection and Mechanical Methods
X00899839-I1-PMM
07/26/2024
Permit issued — Protection and Mechanical Methods
X00899866-I1-PMM
07/25/2024
Permit issued — Supported Scaffold
X00903047-I1-SF
07/17/2024
Violation issued (ECB, closed)
Construction
07/08/2024
Permit issued — Sidewalk Shed
X00899820-I1-SH
05/15/2024
Violation issued (ECB, closed)
Unknown
05/15/2024
Violation issued (ECB, closed)
Construction
05/15/2024
Violation issued (ECB, closed)
Unknown
05/15/2024
Violation issued (ECB, closed)
Unknown
05/15/2024
Violation issued (ECB, closed)
Construction
03/11/2024
Violation issued (ECB, closed)
Construction
01/25/2024
Permit issued — Construction Fence
X00137109-I1-FN
01/24/2024
Violation issued (ECB, closed)
Unknown
01/24/2024
Violation issued (ECB, closed)
Unknown
01/24/2024
Violation issued (ECB, closed)
Construction
01/24/2024
Violation issued (ECB, closed)
Unknown
01/24/2024
Violation issued (ECB, closed)
Construction
11/27/2023
Permit issued — Construction Fence
X00137109-I1-FN
11/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2023
Permit issued — Protection and Mechanical Methods
X00903066-I1-PMM
10/17/2023
Special inspection requirement — Post-installed Anchors
Leo Lee
10/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
10/11/2023
Objection raised — Other
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection raised — Other
10/11/2023
Objection resolved — Addressed
10/03/2023
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00903066-I1
09/25/2023
Signed off — Alteration
Stabilization of formwork shoring system and removal of debris materials application is filed to resolve related violations.
X00915319-I1
09/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/18/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/18/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/18/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/07/2025
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP05/16/2025
DOB NOWConstruction FenceSigned-offG-NADO INC01/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/31/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/26/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/25/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/08/2024
DOB NOWConstruction FenceSigned-offG-NADO INC01/25/2024
DOB NOWConstruction FenceSigned-offGV IMPERIAL CONSTGROUP IN11/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC10/31/2023
DOB NOWGeneral ConstructionSigned-offGV IMPERIAL CONSTGROUP IN08/16/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/15/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/07/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/07/2023
DOB NOWSupport of ExcavationSigned-offDELRIC CONSTRUCTION CO01/04/2023
DOB NOWSupport of ExcavationSigned-offGV IMPERIAL CONSTGROUP IN01/04/2023
DOB NOWConstruction FenceSigned-offGV IMPERIAL CONSTGROUP IN09/23/2022
DOB NOWSupport of ExcavationSigned-offGV IMPERIAL CONSTGROUP IN07/21/2022
DOB NOWConstruction FenceSigned-offGV IMPERIAL CONSTGROUP IN10/21/2021
DOB NOWConstruction FenceSigned-offGV IMPERIAL CONSTGROUP IN01/07/2021
DOB NOWConstruction FenceSigned-offGV IMPERIAL CONSTGROUP IN12/16/2020
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC07/30/2019
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC07/29/2019
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC06/13/2019
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC06/13/2019
DOB NOWConstruction FenceSigned-offGV IMPERIAL CONSTGROUP IN03/07/2019
BISPLISSUEDAMOK INC11/04/2025
BIS—ISSUEDPARK MANAGEMENT USA CORP07/28/2025
BIS—ISSUEDPARK MANAGEMENT USA CORP07/28/2025
BIS—ISSUEDPARK MANAGEMENT USA CORP05/08/2025
BIS—ISSUEDPARK MANAGEMENT USA CORP05/08/2025
BIS—ISSUEDG-NADO INC07/03/2024
BISPLISSUEDAMOK INC03/18/2024
BIS—ISSUEDGV IMPERIAL CONSTGROUP IN01/22/2024
BIS—ISSUEDGV IMPERIAL CONSTGROUP IN06/28/2023
BIS—ISSUEDGV IMPERIAL CONSTGROUP IN04/05/2023
+ 10 more permits on file
7 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
10/30/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
08/27/2024Permit IssuedA.L. ELECTRICAL CORP.General Wiring
04/01/2024Permit IssuedPOWER DIRECT ELECTRIC INC—
07/09/2023CompleteSOLAS ELECTRICAL CORP—
01/12/2021Permit IssuedLENS ELECTRIC, INCGeneral Wiring
06/12/2019Permit IssuedV. VASS ELECTRIC CORP—
2 projects · most recent 10/08/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/08/2025Signed-offCORE SCAFFOLD SYSTEMS INCScaffold
07/17/2023Signed-offCORE SCAFFOLD SYSTEMS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/20/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/17/2023Post-installed AnchorsLeo Leespecial
10/17/2023Structural Stability – Alterations of existing buildingsLeo Leespecial
06/12/2019FinalJOHN O'CONNOR, P.E.progress
▾Documents — 205 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch13
08/25/2026X00601128-I1Request digital key ↗
08/23/2026X00899866-P1Request digital key ↗
08/23/2026X00899866-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00137109-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00179214-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00179214-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION32
03/02/2026220676329Open ↗
02/27/2026220676329Open ↗
02/17/2026220676329Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION18
11/14/2025220676329Open ↗
05/09/2025220676329Open ↗
05/09/2025220676329Open ↗
Showing 3 of 18 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/20/2024220694871Open ↗
03/19/2019220694871Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/20/2026220676329Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM1
06/11/2019220676329Open ↗
▸BISVERIFY TAX LOT1
02/25/2026220676329Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026X00137109-I1Open ↗
08/26/2026X00179214-I1Open ↗
08/25/2026X00601128-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/14/2022220676329Open ↗
01/14/2022220676329Open ↗
06/10/2019220676329Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/06/2019240259796Open ↗
12/20/2017220625955Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/06/2019240259796Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/20/2017220625955Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/06/2019240259796Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026X00903066-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026X00179214-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/02/2019220676329Open ↗
11/05/2018220676329Open ↗
12/20/2017220625955Open ↗
▸BISSCHEDULE B - PLUMBING3
03/02/2026220676329Open ↗
02/13/2026220676329Open ↗
04/21/2021220676329Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/20/2026220676329Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST3
06/10/2019220676329Open ↗
05/28/2019220694871Open ↗
11/05/2018220676329Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/05/2019220655002Open ↗
08/05/2019220654986Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
08/05/2019220654986Open ↗
03/15/2019220655002Open ↗
▸BISSTREET TREES SITE PLAN1
06/03/2019220694871Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/14/2022220676329Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/14/2022220676329Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
08/05/2019220655002Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/05/2019220655002Open ↗
08/05/2019220654986Open ↗
04/04/2019220654986Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/14/2022220676329Open ↗
06/10/2019220676329Open ↗
11/05/2018220676329Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: SOIL INSPECTION2
06/10/2019220676329Open ↗
11/05/2018220676329Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/14/2022220676329Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/14/2022220676329Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
06/10/2019220676329Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
02/19/2026220676329Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/06/2019240259796Open ↗
▸BISHYDRO FLOW TEST LETTER1
06/11/2019220676329Open ↗
▸Approvals, Objections & Sign-offs36
▸BISLETTERS - SUPPORTING DOCUMENTATION29
03/19/2024220676329Open ↗
08/05/2019220655002Open ↗
08/05/2019220655002Open ↗
Showing 3 of 29 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
08/04/2022220676329Open ↗
01/06/2022220676329Open ↗
10/08/2020220676329Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
05/09/2025220676329Open ↗
06/30/2023220676329Open ↗
08/08/2022220676329Open ↗
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE7
05/09/2025220676329Open ↗
07/05/2024220676329Open ↗
06/30/2023220676329Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT2
04/11/2019220697949Open ↗
12/26/2017220625955Open ↗
▸Filing & Intake Forms24
▸BISADDITIONAL INFORMATION11
09/22/2023220676329Open ↗
09/22/2023220676329Open ↗
07/21/2023220676329Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET9
04/11/2019220697949Open ↗
04/04/2019220654986Open ↗
04/02/2019220676329Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/06/2019240259796Open ↗
▸BISBOROUGH INTAKE FORM1
03/19/2024220676329Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/19/2019220694871Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X00899820-P1Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM3
06/10/2019220676329Open ↗
06/10/2019220676329Open ↗
11/05/2018220676329Open ↗
▸BISSITE CONNECTION:DEP2
06/11/2019220676329Open ↗
06/10/2019220676329Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00601128-I1Open ↗