← Back
BuildNYC
Garden apartments
3080 EAST TREMONT AVENUE
BRONX · BIN 2074100
💬 Discuss this project
1962Year Built
3Stories
C9Building Class
R4-1Zoning
16,507 sfGross Floor Area
27Units
Rent Stabilized12 Active Violations 7 unresolved · 5 paperwork only 2 likely answered 5 old, status unconfirmed ▸
Garden apartments · Owner of record: 3080 East Tremont · 13,434 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3080 East Tremont607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering112/07/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808112/07/2021
Building Lifecycle
07/01/2026
§ 27-2005 ADM code properly repair with similar material the broken or defective (brick and motar joints at north exterior wall
HPD violation · open
07/01/2026
§ 27-2005 ADM code properly repair with similar material the broken or defective cement flashing at south exterior wall
HPD violation · open
07/01/2026
§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER TACK WIELD WITH…
HPD violation · open
07/01/2026
§ 27-2005 ADM code properly repair with similar material the broken or defective brick and mortar joints (cracking) at east exterior wall
HPD violation · open
07/01/2026
§ 27-2005 ADM code properly repair with similar material the broken or defective cement flashing at west exterior wall
HPD violation · open
160 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offRockway Fuel Oil11/07/2022
BISBLISSUEDG. Bauer12/09/1992
1 project · most recent 11/29/2021
Boiler Controls
FiledStatusContractorScope
11/29/2021CompleteRaleigh Powell Lic ElectricBoiler Controls
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/12/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/22/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
10/22/2021HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account