← Back
Garden apartments
3080 EAST TREMONT AVENUE
BRONX · Throgs Neck-Schuylerville · BIN 2074100
💬 Discuss this project
1962Year Built
3Stories
C9Building Class
R4-1Zoning
16,507 sfGross Floor Area
27Units
Rent Stabilized21 Open Violations 16 unresolved · 5 paperwork only ▸
Garden apartments · Owner of record: 3080 EAST TREMONT LLC · 13,434 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3080 EAST TREMONT LLC607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.112/07/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808112/07/2021
Building Lifecycle
All (66)Filed (1)Permit Issued (1)Signed Off (1)Violation (60)Inspection (1)Special Inspection (2)
07/01/2026
Violation issued (HPD, open)
A
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
02/09/2026
Violation issued (HPD, closed)
C
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
B
06/16/2025
Violation issued (HPD, closed)
B
06/16/2025
Violation issued (HPD, closed)
B
06/16/2025
Violation issued (HPD, closed)
A
06/14/2025
Violation issued (HPD, open)
C
06/14/2025
Violation issued (HPD, closed)
B
06/14/2025
Violation issued (HPD, closed)
A
06/14/2025
Violation issued (HPD, closed)
B
05/03/2025
Violation issued (HPD, closed)
B
05/03/2025
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
C
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
C
10/21/2024
Violation issued (HPD, closed)
C
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
10/21/2024
Violation issued (HPD, closed)
B
04/16/2024
Violation issued (HPD, closed)
B
04/03/2024
Violation issued (HPD, closed)
C
02/21/2024
Violation issued (HPD, closed)
A
02/21/2024
Violation issued (HPD, closed)
C
11/15/2023
Violation issued (HPD, closed)
B
11/15/2023
Violation issued (HPD, closed)
B
11/15/2023
Violation issued (HPD, closed)
B
11/15/2023
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
B
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2023
Signed off — Alteration
REPLACE OIL BURNER ON EXISTING LOW PRESSURE BOILER. CHANGE GRADE OF FUEL FROM #4 TO #2. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00617120-I1
12/12/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/07/2022
Permit issued — Boiler Equipment
X00617120-I1-BE
10/01/2022
Violation issued (HPD, closed)
A
10/01/2022
Violation issued (HPD, closed)
A
10/01/2022
Violation issued (HPD, closed)
A
03/31/2022
Violation issued (ECB, closed)
Construction
03/31/2022
Violation issued (ECB, closed)
Construction
03/31/2022
Violation issued (ECB, closed)
Construction
12/07/2021
Filed — Alteration
REPLACE OIL BURNER ON EXISTING LOW PRESSURE BOILER. CHANGE GRADE OF FUEL FROM #4 TO #2. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00617120-I1
10/22/2021
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
10/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/22/2020
Violation issued (ECB, closed)
Construction
02/06/2020
Violation issued (ECB, open)
Construction
02/06/2020
Violation issued (ECB, open)
Plumbing
02/06/2020
Violation issued (ECB, open)
Construction
02/06/2020
Violation issued (ECB, open)
Plumbing
02/06/2020
Violation issued (ECB, open)
Plumbing
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offROCKWAY FUEL OIL CORP11/07/2022
BISBLISSUEDG. BAUER INC.12/09/1992
1 project · most recent 11/29/2021
Boiler Controls
FiledStatusContractorScope
11/29/2021CompleteRALEIGH POWELL LIC ELECBoiler Controls
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/12/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/22/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
10/22/2021HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026X00617120-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X00617120-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026X00617120-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026X00617120-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00617120-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00617120-I1Open ↗