← Back
Condo, residential unit in elevator building
The Parkmoor Condominium
308312 WEST 113TH STREET · Harlem (South) · BIN 1090492
💬 Discuss this project
2018Year Built
8Stories
R4Building Class
R7AZoning
17,675 sfGross Floor Area
14Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: 308-312 W. 113TH STREET, LLC · 5,047 sf lot · 3.5 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalEquipmentGeneral
Floor 18p · 1 filing · 6 docs
Site & exterior6p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
308-312 W 113TH STREET1603/21/2026
308-312 WEST 113TH STREET, LLC803/21/2026
3087-312 W 113 LLC103/22/2026
310 WEST 113 STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PACE ENGINEERING P.C.511/04/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor1407/08/2026
MARIO CASTROElectrical303/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
Building Lifecycle
All (75)Filed (5)Permit Issued (6)Signed Off (2)Violation (60)Special Inspection (2)
06/16/2025
Violation issued (HPD, closed)
A
04/22/2025
Violation issued (ECB, closed)
Construction
07/20/2022
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00126222-I1
04/18/2022
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2018.
M00087554-I1
08/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2021
Violation issued (FDNY_NOV, closed)
02/24/2021
Violation issued (ECB, closed)
Construction
11/19/2020
Violation issued (ECB, closed)
Site Safety
10/14/2020
Violation issued (FDNY_ORDER, closed)
06/24/2020
Permit issued — Supported Scaffold
M00126222-I1-SF
06/19/2020
Permit issued — Sidewalk Shed
M00087554-I1-SH
11/04/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00126222-P2
11/04/2019
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2018.
M00087554-P1
11/04/2019
Special inspection requirement — Final
Baris Acar
11/04/2019
Special inspection requirement — Final
Baris Acar
10/28/2019
Violation issued (ECB, closed)
Construction
10/28/2019
Violation issued (ECB, closed)
Construction
10/28/2019
Violation issued (ECB, closed)
Construction
10/28/2019
Violation issued (ECB, closed)
Construction
10/28/2019
Violation issued (ECB, closed)
Construction
10/28/2019
Violation issued (ECB, closed)
Construction
10/28/2019
Violation issued (ECB, closed)
Unknown
09/30/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00126222-P1
07/17/2019
Permit issued — Sidewalk Shed
M00087554-I1-SH
06/26/2019
Permit issued — Supported Scaffold
M00126222-I1-SF
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2019
Permit issued — Supported Scaffold
M00126222-I1-SF
02/06/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00126222-I1
12/19/2018
Violation issued (ECB, closed)
Construction
12/18/2018
Violation issued (ECB, closed)
Construction
12/18/2018
Violation issued (ECB, closed)
Unknown
12/18/2018
Violation issued (ECB, closed)
Construction
12/18/2018
Violation issued (ECB, closed)
Construction
12/18/2018
Violation issued (ECB, closed)
Construction
12/18/2018
Violation issued (ECB, closed)
Construction
12/18/2018
Violation issued (ECB, closed)
Construction
12/18/2018
Violation issued (ECB, closed)
Construction
10/16/2018
Permit issued — Sidewalk Shed
M00087554-I1-SH
10/15/2018
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2018.
M00087554-I1
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/2017
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
07/28/2017
Violation issued (ECB, closed)
Construction
11/16/2016
Violation issued (HPD, closed)
B
11/16/2016
Violation issued (HPD, closed)
B
11/16/2016
Violation issued (HPD, closed)
B
10/26/2016
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
09/27/2014
Violation issued (HPD, closed)
B
08/26/2000
Violation issued (HPD, closed)
C
06/30/1998
Violation issued (HPD, closed)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/24/2020
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/19/2020
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/17/2019
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/26/2019
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING02/07/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING10/16/2018
BISSPISSUEDPHOENIX PLMBG & MECH CORP12/29/2020
BISSDISSUEDPHOENIX PLMBG & MECH CORP12/28/2020
BISEQISSUEDTHE VOREA CONSTRUCTION CO11/16/2020
BIS—ISSUEDTHE VOREA CONSTRUCTION CO11/16/2020
BISPLISSUEDGW MECHANICAL CORP10/16/2020
BISPLISSUEDGW MECHANICAL CORP10/16/2020
BISSDISSUEDPHOENIX PLMBG & MECH CORP07/10/2020
BIS—ISSUEDTHE VOREA CONSTRUCTION CO05/27/2020
BIS—ISSUEDTHE VOREA CONSTRUCTION CO11/14/2019
BISEQISSUEDTHE VOREA CONSTRUCTION CO11/14/2019
BISPLISSUEDGW MECHANICAL CORP10/16/2019
BISPLISSUEDGW MECHANICAL CORP10/16/2019
BISSPISSUEDPHOENIX PLMBG & MECH CORP06/11/2019
BISSDISSUEDPHOENIX PLMBG & MECH CORP12/12/2018
BIS—ISSUEDTHE VOREA CONSTRUCTION CO11/21/2018
BIS—ISSUEDTHE VOREA CONSTRUCTION CO09/20/2018
BIS—ISSUEDTHE VOREA CONSTRUCTION CO11/08/2017
BISEQISSUEDTHE VOREA CONSTRUCTION CO11/08/2017
BISSDISSUEDPHOENIX PLMBG & MECH CORP10/27/2017
BISEQISSUEDTRI BOROUGH SCAFFOLDING02/03/2017
BISEQISSUEDTRI BOROUGH SCAFFOLDING02/03/2017
BISEQISSUEDTRI BOROUGH SCAFFOLDING02/02/2017
BISEQISSUEDTRI BOROUGH SCAFFOLDING02/02/2017
8 projects · most recent 07/06/2022
General Wiring
FiledStatusContractorScope
07/06/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
04/05/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/16/2019CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
01/17/2019CompletePOWER SURGE ELECTRIC, INC2 meters, 1 new_meters
01/08/2019CompleteV. VASS ELECTRIC CORP—
10/11/2018CompleteV. VASS ELECTRIC CORP—
06/27/2018CompleteNTS ELECTRICAL, INC—
03/29/2018CompletePOWER SURGE ELECTRIC, INC1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/04/2019FinalBaris Acarprogress
11/04/2019FinalBaris Acarprogress
▾Documents — 264 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00126222-I1Request digital key ↗
08/15/2026M00126222-P2Request digital key ↗
08/15/2026M00126222-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00087554-I1Request digital key ↗
09/05/2026M00087554-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/05/2026M00087554-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION27
09/13/2022140996162Open ↗
09/07/2022122996641Open ↗
01/11/2021121191067Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION22
05/27/2020121191067Open ↗
12/31/2019123145088Open ↗
11/14/2019121191067Open ↗
Showing 3 of 22 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/17/2020140590965Open ↗
12/05/2018140590965Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
01/22/2021121191067Open ↗
02/21/2017121191067Open ↗
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/11/2019140590956Open ↗
03/05/2018140600384Open ↗
03/05/2018140600437Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/29/2020140996162Open ↗
10/25/2017123145088Open ↗
02/02/2017140600384Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
12/29/2020140996162Open ↗
02/02/2017140600384Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
12/29/2020140996162Open ↗
02/02/2017140600384Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/05/2026M00087554-P1Open ↗
09/05/2026M00087554-I1Open ↗
08/13/2026M00126222-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026M00087554-I1Open ↗
08/26/2026M00126222-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/25/2017123145088Open ↗
▸Trade Schedules & Equipment30
▸BISEQUIPMENT USE PERMITS16
03/09/2021121191067Open ↗
03/09/2021121191067Open ↗
03/09/2021121191067Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
04/06/2021121191067Open ↗
03/10/2021121191067Open ↗
03/10/2021121191067Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
08/29/2020140590956Open ↗
05/18/2017140590956Open ↗
Showing 2 of 3 on file for this type
▸BISSTANDPIPE SYSTEMS3
02/18/2022123145088Open ↗
02/18/2022123145088Open ↗
02/18/2022140590956Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/13/2020122956328Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
09/17/2019121191067Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/25/2017123145088Open ↗
▸BISSPRINKLER SYSTEMS1
02/18/2022140590956Open ↗
▸Safety & Tenant Protection16
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE7
11/09/2017121191067Open ↗
11/09/2017121191067Open ↗
11/09/2017121191067Open ↗
Showing 3 of 7 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST4
02/02/2017140600384Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
12/05/2018140590965Open ↗
11/09/2017121191067Open ↗
▸BISSTREET TREE SIGNOFF1
09/06/2022121191067Open ↗
▸BISSTREET TREES SITE PLAN1
12/05/2018140590965Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
04/25/2017140590956Open ↗
▸Energy Compliance4
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
02/02/2017140600384Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/01/2017121191067Open ↗
11/01/2017121191067Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY5
02/02/2017140600384Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
07/20/2021121191067Open ↗
07/20/2021121191067Open ↗
02/26/2021121191067Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
09/19/2018121191067Open ↗
08/21/2018121191067Open ↗
03/19/2018121191067Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/18/2022140590956Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/21/2017121191067Open ↗
▸BISDEP Hydrant Flow Test Letter1
03/02/2017140590956Open ↗
▸BISSOIL REPORT1
02/21/2017121191067Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
03/02/2017140590956Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
04/04/2022140590956Open ↗
04/04/2022123145088Open ↗
02/04/2021122956328Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/27/2020121191067Open ↗
10/08/2019121191067Open ↗
03/02/2017140590956Open ↗
▸BISFINAL3
02/18/2022123145088Open ↗
02/18/2022123145088Open ↗
02/18/2022140590956Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
08/12/2019121191067Open ↗
▸Cost, Insurance & Ownership14
▸BISPROJECT-SPECIFIC GL INSURANCE5
05/27/2020121191067Open ↗
11/14/2019121191067Open ↗
11/23/2018121191067Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
03/31/2022140590956Open ↗
03/31/2022123145088Open ↗
02/04/2021122956328Open ↗
▸BISDEPT OF FINANCE VERIFICATION3
01/16/2020123795946Open ↗
01/16/2020123795946Open ↗
01/16/2020123795946Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
11/23/2018121191067Open ↗
09/24/2018121191067Open ↗
▸BISCOST AFFIDAVIT1
12/29/2020140996162Open ↗
▸Filing & Intake Forms38
▸BISADDITIONAL INFORMATION17
02/09/2021121191067Open ↗
01/22/2021121191067Open ↗
01/15/2021121191067Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET10
01/16/2020123795946Open ↗
01/09/2020123795946Open ↗
10/25/2017123145088Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
12/29/2020140996162Open ↗
Showing 1 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
03/05/2018140600384Open ↗
03/05/2018140600437Open ↗
03/02/2018140600464Open ↗
Showing 3 of 4 on file for this type
▸Other Documents34
▸BISUnknown26
12/07/2022121191067Open ↗
12/07/2022121191067Open ↗
09/06/2022121191067Open ↗
Showing 3 of 26 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/05/2018140590965Open ↗
12/05/2018140590965Open ↗
▸BISPLOT DIAGRAM2
01/16/2020123795946Open ↗
01/09/2020123795946Open ↗
▸BISTCO - Supporting Documents1
02/26/2021121191067Open ↗
▸BISSITE SURVEY: INITIAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSITE SURVEY: FINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/09/2017121191067Open ↗