| Owner | Filings | Most Recent |
|---|---|---|
| ALBA SERVICES | 4 | 08/30/2026 |
| HIGH POINT ENGINEERING | 13 | 07/08/2026 |
| CONNER STREET REALTY | 5 | 03/22/2026 |
| 3083 WEBSTER | 1 | 03/21/2026 |
| SKF GENERAL CONTRACTORS | 1 | 03/21/2026 |
| POWER TEST REALTY | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 04/25/2024 | $7.0M | — | 3083 WEBSTER REALTY LLC → 3083 WEBSTER AVENUE HOUSING DEVELOPMENT FUND CORP. | $3,590/sf building |
| 12/22/2020 | $6.0M | — | — → — | $3,077/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| AUTOMATED DESIGN ENGINEERING, PLLC | 4 | 04/27/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 04/07/2025 |
| WEXLER ASSOCIATES | 3 | 01/20/2025 |
| ANCORA ENGINEERING, PLLC | 5 | 09/19/2024 |
| BECALL ENGINEERING SERVICES INC. | 1 | 06/12/2024 |
| HIGH POINT ENGINEERING | 7 | 03/09/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| HIGH POINT ENGINEERING | 7 | 03/21/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| VOLK INDUSTRIAL SERVICES | General Contractor | 5 | 09/03/2026 |
| AMERICAN PETROLEUM EQUIP | General Contractor | 4 | 07/08/2026 |
| METRO ENVIRONMENTAL SRVCS | General Contractor | 4 | 07/08/2026 |
| ALBA SERVICES INC | General Contractor | 3 | 07/09/2026 |
| SKF GENERAL CONTRACTORS, | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MASTROGIACOMO ENGINEERING | 4237 | 3 | 04/27/2026 |
| ENVIRONMENTAL CODE CONSUL | 5516 | 2 | 09/19/2024 |
| AMARACON TESTING & INSPEC | 5842 | 2 | 08/04/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Full Demolition | Permit Issued | VOLK INDUSTRIAL SERVICES | 09/02/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | VOLK INDUSTRIAL SERVICES | 08/31/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | VOLK INDUSTRIAL SERVICES | 08/31/2026 |
| DOB NOW | Construction Fence | Permit Issued | VOLK INDUSTRIAL SERVICES | 08/27/2026 |
| DOB NOW | Full Demolition | Permit Issued | VOLK INDUSTRIAL SERVICES | 08/24/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ALBA SERVICES INC | 07/07/2026 |
| DOB NOW | Construction Fence | Permit Issued | ALBA SERVICES INC | 07/07/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ALBA SERVICES INC | 07/07/2026 |
| DOB NOW | Construction Fence | Signed-off | SKF GENERAL CONTRACTORS, | 06/26/2024 |
| DOB NOW | Construction Fence | Signed-off | SKF GENERAL CONTRACTORS, | 04/24/2024 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | AMERICAN PETROLEUM EQUIP | 04/18/2023 |
| DOB NOW | Construction Fence | Signed-off | AMERICAN PETROLEUM EQUIP | 03/14/2023 |
| DOB NOW | Construction Fence | Signed-off | AMERICAN PETROLEUM EQUIP | 02/28/2022 |
| DOB NOW | General Construction | Signed-off | METRO ENVIRONMENTAL SRVCS | 08/20/2021 |
| DOB NOW | Construction Fence | Signed-off | METRO ENVIRONMENTAL SRVCS | 08/20/2021 |
| BIS | — | ISSUED | 2260 MAG CORP | 09/15/2017 |
| BIS | — | ISSUED | NATIONWIDE SIGNS & SERVICE | 09/15/2003 |
| BIS | — | ISSUED | NATIONWIDE SIGNS & SERVICE | 09/12/2003 |
| BIS | — | ISSUED | NATIONWIDE SIGNS & SERVICE | 09/12/2003 |
| BIS | — | ISSUED | NATIONWIDE SIGNS & SERVICE | 09/12/2003 |
| BIS | FS | ISSUED | EASTMOND AND SONS BOILER REPAIR | 12/30/2002 |
| BIS | — | ISSUED | BERGER SIGN FABRICATION, INC. | 07/27/1998 |
| BIS | FP | ISSUED | FIRE GUARD OF LONG ISLAND | 04/13/1998 |
| BIS | OT | RE-ISSUED | ENGLISH & VOGT INC | 01/26/1998 |
| BIS | OT | ISSUED | LARRY E. TYREE, INC. | 12/08/1997 |
| BIS | OT | ISSUED | LARRY E. TYREE, INC. | 12/08/1997 |
| BIS | OT | ISSUED | LARRY E. TYREE, INC. | 12/08/1997 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/27/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Islandaire EZLT07L3B1S45AL 7,300 BTU · Ptac ×298 EZLT12L3C1S45AL 11,900 BTU · Ptac ×168 EZLT16L3E1S45AL 15,000 BTU · Ptac ×118 Cadet CEC163TW 5,115 BTU · Electric Heater ×128 Mitsubishi Electric PEFY-P54NMAU-E4 54,000 BTU · Vrf Indoor ×4 PUHY-P120TNU-A 135,000 BTU · Vrf Outdoor ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/27/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/27/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/27/2026 | — | — | Concrete |
| 03/09/2023 | — | — | 1 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 11/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/09/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 09/09/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/28/2026 | Mechanical Systems | MICHAEL MASTROGIACOMO | special |
| 04/28/2026 | Energy Code Compliance Inspections | MICHAEL MASTROGIACOMO | progress |
| 04/28/2026 | Final | MICHAEL MASTROGIACOMO | progress |
| 04/28/2026 | HVAC-R and service water heating system controls | MICHAEL MASTROGIACOMO | energy_progress |
| 04/28/2026 | Maintenance information | MICHAEL MASTROGIACOMO | energy_progress |
| 04/28/2026 | HVAC-R and service water piping design and insulation | MICHAEL MASTROGIACOMO | energy_progress |
| 04/28/2026 | HVAC-R and service water heating equipment | MICHAEL MASTROGIACOMO | energy_progress |
| 04/28/2026 | Ventilation and air distribution system | MICHAEL MASTROGIACOMO | energy_progress |
| 04/28/2026 | Shutoff dampers | MICHAEL MASTROGIACOMO | energy_progress |
| 03/15/2026 | HVAC-R and service water heating system controls | MICHAEL MASTROGIACOMO | energy_progress |
| 03/15/2026 | Mechanical Systems | MICHAEL MASTROGIACOMO | special |
| 03/15/2026 | Energy Code Compliance Inspections | MICHAEL MASTROGIACOMO | progress |
| 03/15/2026 | Final | MICHAEL MASTROGIACOMO | progress |
| 03/15/2026 | HVAC-R and service water heating equipment | MICHAEL MASTROGIACOMO | energy_progress |
| 03/15/2026 | HVAC-R and service water piping design and insulation | MICHAEL MASTROGIACOMO | energy_progress |
| 03/15/2026 | Shutoff dampers | MICHAEL MASTROGIACOMO | energy_progress |
| 03/15/2026 | Ventilation and air distribution system | MICHAEL MASTROGIACOMO | energy_progress |
| 03/15/2026 | Maintenance information | MICHAEL MASTROGIACOMO | energy_progress |
| 04/23/2025 | Electrical motors and elevators | — | energy_progress |
| 04/23/2025 | Air barrier — testing | — | energy_progress |
| 03/04/2025 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 03/04/2025 | Deep Foundation Elements | — | special |
| 03/04/2025 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 03/04/2025 | Concrete - Cast-In-Place | — | special |
| 03/04/2025 | Post-installed Anchors | — | special |