← Back
Library
New Dorp Branch Library
309 NEW DORP LANE · BIN 5052750
💬 Discuss this project
1971Year Built
1Stories
P8Building Class
R3-2Zoning
12,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Library · Owner of record: NEW YORK PUBLIC LIBRARY · 12,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction22p · 1 filing · 20 docs
Floor 1Under Construction19p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ADVANCED CONSTRUCTION EQUIPMENT COR407/08/2026
NYC DEPT OF DESIGN & CONS103/21/2026
DEPARTMENT OF DESIGN CONSTRU203/21/2026
DEPT OF DESIGN CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHENOY ENGINEERING, P.C.708/17/2023
JOEL PHAGOO P.E. PLLC102/13/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHENOY ENGINEERING P C603/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C. D. E. AIR-CONDITIONINGGeneral Contractor1107/08/2026
ADVANCED CONSTRUCTION EQUIPMENTGeneral Contractor407/08/2026
LOUIS L.BUTTERMARK & SONSPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUALITY CONTROL LABORATOR406303/01/2023
Building Lifecycle
All (60)Filed (8)Permit Issued (13)Signed Off (1)Violation (6)Inspection (2)Special Inspection (30)
01/22/2026
Permit issued — Mechanical Systems
S00816450-I1-GC-CX
01/05/2026
Permit issued — General Construction
S00816450-S2-GC
01/05/2026
Permit issued — Structural
S00816450-S3-ST
12/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/07/2025
Permit issued — Plumbing
S00816450-S1-PL
02/05/2025
Permit issued — Mechanical Systems
S00816450-I1-GC-CX
01/31/2025
Permit issued — Structural
S00816450-S3-ST
01/31/2025
Permit issued — General Construction
S00816450-S2-GC
05/07/2024
Permit issued — Plumbing
S00816450-S1-PL
02/20/2024
Permit issued — General Construction
S00816450-I1-GC-CX
02/16/2024
Permit issued — Structural
S00816450-S3-ST
02/16/2024
Permit issued — General Construction
S00816450-S2-GC
08/21/2023
Special inspection requirement — Maintenance information
EDWIN DEGUZMAN
08/21/2023
Special inspection requirement — Energy Code Compliance Inspections
EDWIN DEGUZMAN
08/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN DEGUZMAN
08/17/2023
Filed — Alteration
Existing gas service to be terminated and capped at wall. Existing gas fired domestic water heater to be replaced with equivalent electric domestic water heater.
S00816450-P2
08/16/2023
Special inspection requirement — Final
SAMUEL BAUTISTA
08/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMUEL BAUTISTA
08/16/2023
Special inspection requirement — Post-installed Anchors
SAMUEL BAUTISTA
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMUEL BAUTISTA
08/15/2023
Filed — Alteration
Existing gas service to be terminated and capped at wall. Existing gas fired domestic water heater to be replaced with equivalent electric domestic water heater.
S00816450-P3
08/15/2023
Filed — Alteration
Existing gas service to be terminated and capped at wall. Existing gas fired domestic water heater to be replaced with equivalent electric domestic water heater.
S00816450-P1
08/10/2023
Special inspection requirement — Final
08/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
08/10/2023
Special inspection requirement — Lighting controls
08/10/2023
Special inspection requirement — Shutoff dampers
08/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
08/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
08/10/2023
Special inspection requirement — Maintenance information
08/10/2023
Special inspection requirement — Electrical motors and elevators
08/10/2023
Special inspection requirement — Interior lighting power
08/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/10/2023
Special inspection requirement — Post-installed Anchors
08/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/10/2023
Special inspection requirement — Final
08/10/2023
Special inspection requirement — Energy Code Compliance Inspections
08/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
08/10/2023
Special inspection requirement — Maintenance information
08/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/10/2023
Special inspection requirement — Mechanical Systems
08/10/2023
Special inspection requirement — Post-installed Anchors
08/10/2023
Special inspection requirement — Energy Code Compliance Inspections
03/01/2023
Filed — Alteration
Existing gas service to be terminated and capped at wall. Existing gas fired domestic water heater to be replaced with equivalent electric domestic water heater.
S00816450-S3
02/28/2023
Filed — Alteration
Existing gas service to be terminated and capped at wall. Existing gas fired domestic water heater to be replaced with equivalent electric domestic water heater.
S00816450-S2
02/28/2023
Filed — Alteration
Existing gas service to be terminated and capped at wall. Existing gas fired domestic water heater to be replaced with equivalent electric domestic water heater.
S00816450-S1
02/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMUEL BAUTISTA
02/28/2023
Special inspection requirement — Structural Steel - Details
SAMUEL BAUTISTA
02/28/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SAMUEL BAUTISTA
01/27/2023
Filed — Alteration
Existing gas service to be terminated and capped at wall. Existing gas fired domestic water heater to be replaced with equivalent electric domestic water heater.
S00816450-I1
07/24/2018
Signed off — Alteration
S00017564-I1
03/30/2018
Permit issued — Sidewalk Shed
S00017564-I1-SH
02/13/2018
Filed — Alteration
S00017564-I1
02/13/2018
Permit issued — Sidewalk Shed
S00017564-I1-SH
07/30/2010
Violation issued (ECB, closed)
Construction
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedC. D. E. AIR-CONDITIONING01/22/2026
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING01/05/2026
DOB NOWStructuralSigned-offC. D. E. AIR-CONDITIONING01/05/2026
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS05/07/2025
DOB NOWMechanical SystemsPermit IssuedC. D. E. AIR-CONDITIONING02/05/2025
DOB NOWStructuralSigned-offC. D. E. AIR-CONDITIONING01/31/2025
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING01/31/2025
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS05/07/2024
DOB NOWGeneral ConstructionPermit IssuedC. D. E. AIR-CONDITIONING02/20/2024
DOB NOWStructuralSigned-offC. D. E. AIR-CONDITIONING02/16/2024
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING02/16/2024
DOB NOWSidewalk ShedSigned-offADVANCED CONSTRUCTION EQU03/30/2018
DOB NOWSidewalk ShedSigned-offADVANCED CONSTRUCTION EQU02/13/2018
BISOTISSUEDARMSTRONG ROOFING CORP05/23/2018
BISMHISSUEDROCKY SHEET METAL10/28/1999
BISOTISSUEDS&N WATERPROOFING & RESTORATION08/23/1999
BISEQISSUEDS&N WATERPROOFING & RESTORATION07/27/1999
BISEQISSUEDS&N WATERPROOFING & RESTORATION03/16/1999
BISEQISSUEDS&N WATERPROOFING & RESTORATION03/04/1999
BISPLISSUEDAARON PLBG AND MECH SYST11/06/1998
BISOTISSUEDS&N WATERPROOFING & RESTORATION10/13/1998
BISEQISSUEDS&N WATERPROOFING & RESTORATION10/09/1998
1 project · most recent 08/17/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2023Permit IssuedC. D. E. AIR-CONDITIONINGAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PKFY-P15NLMU-E 350 CFM · Vrf Indoor ×16
PEFY-P54NMAU-E4 1,400 CFM · Vrf Indoor ×14
PEFY-P48NMAU-E4 1,300 CFM · Vrf Indoor ×4
PLFY-EP12NEMU-ER1 600 CFM · Vrf Indoor ×4
PLFY-EP24NEMU-ER1 812 CFM · Vrf Indoor ×4
PLFY-P05NFMU-E 280 CFM · Vrf Indoor ×2
Heating
Mitsubishi Electric PURY-P240TSNU-A(-BS) 8 kW · Vrf Outdoor ×6
Ventilation
Aaon RNA-016 92,900 BTU ×2
1 project · most recent 08/17/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/17/2023Signed-offLOUIS L.BUTTERMARK & SONSGas, Water/Sanitary
2 projects · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026Permit IssuedG.S.H. ELECTRIC INC.General Wiring
02/09/2018CompleteSTANCO SYSTEM ELEC'L CONT—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/21/2023Maintenance informationEDWIN DEGUZMANenergy_progress
08/21/2023Energy Code Compliance InspectionsEDWIN DEGUZMANprogress
08/21/2023HVAC-R and service water piping design and insulationEDWIN DEGUZMANenergy_progress
08/16/2023FinalSAMUEL BAUTISTAprogress
08/16/2023Structural Stability – Alterations of existing buildingsSAMUEL BAUTISTAspecial
08/16/2023Post-installed AnchorsSAMUEL BAUTISTAspecial
08/16/2023Fire-Resistant Penetrations and JointsSAMUEL BAUTISTAspecial
08/10/2023Final—progress
08/10/2023HVAC-R and service water heating equipment—energy_progress
08/10/2023Lighting controls—energy_progress
08/10/2023Shutoff dampers—energy_progress
08/10/2023HVAC-R and service water piping design and insulation—energy_progress
08/10/2023HVAC-R and service water heating system controls—energy_progress
08/10/2023Maintenance information—energy_progress
08/10/2023Electrical motors and elevators—energy_progress
08/10/2023Interior lighting power—energy_progress
08/10/2023Fire-Resistant Penetrations and Joints—special
08/10/2023Post-installed Anchors—special
08/10/2023Structural Stability – Alterations of existing buildings—special
08/10/2023Final—progress
08/10/2023Energy Code Compliance Inspections—progress
08/10/2023HVAC-R and service water piping design and insulation—energy_progress
08/10/2023Maintenance information—energy_progress
08/10/2023Fire-Resistant Penetrations and Joints—special
08/10/2023Mechanical Systems—special
Latest 25 of 33.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026S00017564-I1Request digital key ↗
08/22/2026S00816450-I1Request digital key ↗
08/22/2026S00816450-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
07/25/2017520305278Open ↗
12/09/2016520282239Open ↗
10/28/2016520282239Open ↗
▸BISWORK PERMIT APPLICATION1
05/24/2018520305278Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026S00017564-I1Open ↗
08/22/2026S00816450-I1Open ↗
08/22/2026S00816450-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/24/2026S00816450-S2Open ↗
08/24/2026S00816450-S2Open ↗
08/24/2026S00816450-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026S00017564-I1Open ↗
08/24/2026S00816450-S2Open ↗
08/23/2026S00816450-S3Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/14/2018520305278Open ↗
07/25/2017520305278Open ↗
07/25/2017520305278Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/25/2017520305278Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/25/2017520305278Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
08/06/2018520282239Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026S00816450-P5Open ↗
08/22/2026S00816450-S2Open ↗
08/22/2026S00816450-S1Open ↗
Showing 3 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/24/2018520305278Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/28/2016520282239Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/14/2018520305278Open ↗
07/25/2017520305278Open ↗
07/25/2017520305278Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
12/14/2018520305278Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/22/2026S00816450-I1Open ↗
08/22/2026S00816450-S2Open ↗
08/22/2026S00816450-S1Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/04/2019520305278Open ↗
12/14/2018520305278Open ↗
09/20/2018520282239Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/25/2017520305278Open ↗
10/28/2016520282239Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/25/2017520305278Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/14/2018520305278Open ↗
09/20/2018520282239Open ↗
07/25/2017520305278Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
12/14/2018520305278Open ↗
09/20/2018520282239Open ↗
▸BISEFILING COVER SHEET2
07/25/2017520305278Open ↗
10/28/2016520282239Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/25/2017520305278Open ↗
10/28/2016520282239Open ↗