← Back
Five to six families
309 STANHOPE STREET
BROOKLYN · BIN 3074254
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
4,650 sfGross Floor Area
6Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 309 STANHOPE STREET REAL ESTATE CORP. · 2,500 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
309 STANHOPE STREET REAL ESTATE COR903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.307/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELL FUEL OIL, LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851112/07/2021
Building Lifecycle
All (27)Filed (3)Permit Issued (2)Signed Off (2)Violation (13)Inspection (2)Special Inspection (5)
05/06/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, closed)
I
06/11/2025
Violation issued (HPD, open)
A
04/11/2024
Violation issued (HPD, open)
A
03/27/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, closed)
I
08/22/2022
Signed off — Alteration
B00633312-I1
08/22/2022
Signed off — Alteration
REGISTER TWO GAS HOT WATER HEATERS AND GAS CONNECTION FOR REPLACEMENT GAS BOILER. REPLACE GAS PIPING.
B00633298-I1
08/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/01/2022
Filed — Alteration
REGISTER TWO GAS HOT WATER HEATERS AND GAS CONNECTION FOR REPLACEMENT GAS BOILER. REPLACE GAS PIPING.
B00633298-P1
07/01/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
07/01/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
07/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
07/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
07/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/22/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/02/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, open)
A
12/16/2021
Permit issued — Boiler Equipment
B00633312-I1-BE
12/16/2021
Permit issued — Plumbing
B00633298-I1-PL
12/07/2021
Filed — Alteration
B00633312-I1
12/07/2021
Filed — Alteration
REGISTER TWO GAS HOT WATER HEATERS AND GAS CONNECTION FOR REPLACEMENT GAS BOILER. REPLACE GAS PIPING.
B00633298-I1
04/13/2021
Violation issued (HPD, closed)
A
02/24/2015
Violation issued (HPD, closed)
I
05/12/2010
Violation issued (HPD, open)
B
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/15/1991
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC12/16/2021
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC12/16/2021
1 project · most recent 04/25/2025
General Wiring
FiledStatusContractorScope
04/25/2025CompleteORBA ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/01/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
07/01/2022Maintenance informationLOUIS ARENAenergy_progress
07/01/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/01/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/01/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00633298-P1Request digital key ↗
08/31/2026B00633298-I1Request digital key ↗
08/31/2026B00633312-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00633312-I1Open ↗
08/13/2026B00633298-I1Open ↗
08/13/2026B00633298-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B00633298-I1Open ↗
08/25/2026B00633298-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00633312-I1Open ↗
08/13/2026B00633298-I1Open ↗
08/13/2026B00633298-P1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00633312-I1Open ↗
08/13/2026B00633298-I1Open ↗