← Back
Three families
309 VAN BUREN STREET
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3043615
💬 Discuss this project
1899Year Built
2Stories
C0Building Class
R6BZoning
2,295 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · 1,700 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 2 filings · 8 docs
Floor 11p · 1 filing · 5 docs
Cellar1p · 1 filing · 5 docs
Basement1p · 1 filing · 3 docs
Sub-Basement1p · 2 filings · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/08/2016$975K—Private party → Private party$425/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAEIK KIM ARCHITECT201/12/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSL DESIGN INCGeneral Contractor107/08/2026
LIQUID PLBG & HTNG SCS INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHONG ENGINEERING P.C.7411112/19/2022
Building Lifecycle
All (28)Filed (2)Permit Issued (2)Signed Off (2)Violation (17)Inspection (3)Special Inspection (2)
05/06/2026
Violation issued (HPD, open)
A
06/11/2025
Violation issued (HPD, open)
A
04/12/2024
Violation issued (HPD, open)
A
07/24/2023
Signed off — Alteration
B08002065-I1
07/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/19/2023
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURE AN EXISTING RESIDENTIAL BUILDING ON BASEMENT, 2ND FLOOR(NEW ELECTRIC DRYER(2) & WASHER(2), SHOWER(1) INSTALLATION), GENERAL CONSTRUCTION WORK TO BE FILED UNDER SEPARATE APPLICATION. (N/A)
B00802293-I1
07/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2023
Permit issued — Plumbing
B00802293-I1-PL
03/27/2023
Violation issued (HPD, open)
A
01/12/2023
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURE AN EXISTING RESIDENTIAL BUILDING ON BASEMENT, 2ND FLOOR(NEW ELECTRIC DRYER(2) & WASHER(2), SHOWER(1) INSTALLATION), GENERAL CONSTRUCTION WORK TO BE FILED UNDER SEPARATE APPLICATION. (N/A)
B00802293-I1
01/10/2023
Permit issued — General Construction
B08002065-I1-GC
12/19/2022
Filed — Alteration
B08002065-I1
11/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Tae Chong
11/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
03/02/2022
Violation issued (HPD, open)
A
04/29/2021
Violation issued (ECB, open)
Construction
04/13/2021
Violation issued (HPD, closed)
I
04/13/2021
Violation issued (HPD, open)
A
10/31/2019
Violation issued (HPD, closed)
I
10/22/2018
Violation issued (HPD, closed)
I
11/30/2017
Violation issued (HPD, closed)
I
11/16/2016
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
02/25/2015
Violation issued (HPD, closed)
I
01/09/2002
Violation issued (HPD, open)
C
01/09/2002
Violation issued (HPD, open)
C
09/04/1996
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLIQUID PLBG & HTNG SCS IN05/09/2023
DOB NOWGeneral ConstructionSigned-offJSL DESIGN INC01/10/2023
BISPLISSUEDLIQUID PLBG & HTNG SCS IN08/13/2018
BISOTISSUEDPROMENADE GEN CORP06/23/2017
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/22/2022Energy Code Compliance InspectionsTae Chongprogress
11/21/2022Fire-Resistant Penetrations and JointsTae Chongspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B08002065-I1Request digital key ↗
08/28/2026B00802293-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
12/11/2019340493353Open ↗
04/14/2017340493353Open ↗
▸BISWORK PERMIT APPLICATION2
08/14/2018340493353Open ↗
06/23/2017340493353Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026B08002065-I1Open ↗
08/13/2026B00802293-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/14/2017340493353Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/14/2017340493353Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/14/2017340493353Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B08002065-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B08002065-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
06/26/2019340493353Open ↗
04/14/2017340493353Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/31/2019340493353Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B08002065-I1Open ↗
08/13/2026B00802293-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/14/2017340493353Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/14/2017340493353Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/14/2017340493353Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/14/2017340493353Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/14/2017340493353Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
12/11/2019340493353Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/14/2017340493353Open ↗