← Back
Primarily 1 family with 1 store or office
31-01 34 AVENUE
QUEENS · BIN 4008253
💬 Discuss this project
1935Year Built
3Stories
S1Building Class
R5Zoning
—Gross Floor Area
2Units
4 Open Violations 1 unresolved · 3 paperwork only ▸
Primarily 1 family with 1 store or office · Owner of record: AVORIA PROPERTIES LLC · 1.56 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 32p · 1 filing · 2 docs
Floor 2
Floor 1
Cellar2p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVORIA PROPERTIES LLC708/28/2026
ADLER REALTY703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AHT ENGINEERING PLLC105/05/2026
KING ARCHITECT, PLLC205/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR EXPEDITERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GO PRO PLUMBING AND HEATINGPlumbing407/08/2026
DAVEN ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AHT ENGINEERING PLLC8836105/05/2026
KING ARCHITECT PLLC7692105/04/2021
Building Lifecycle
All (19)Filed (3)Permit Issued (5)Signed Off (3)Violation (5)Inspection (1)Special Inspection (2)
08/26/2026
Signed off — Alteration
Q01391601-I1
07/01/2026
Permit issued — Mechanical Systems
Q01391601-I1-MS
05/05/2026
Filed — Alteration
Q01391601-I1
09/10/2024
Violation issued (ECB, open)
Construction
03/27/2024
Violation issued (ECB, open)
Construction
01/11/2023
Violation issued (ECB, open)
Construction
09/07/2022
Signed off — Alteration
replace existing gas line from cellar to floor 1. No change in use egress or occupancy.
Q00298199-I1
09/07/2022
Signed off — Alteration
install LARS Therm 11 gas fired boiler. No change in use, egress or occupancy.
Q00469778-I1
03/16/2022
Permit issued — Plumbing
Q00298199-I1-PL
02/08/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/19/2021
Permit issued — Boiler Equipment
Q00469778-I1-BE
05/04/2021
Filed — Alteration
install LARS Therm 11 gas fired boiler. No change in use, egress or occupancy.
Q00469778-I1
04/28/2021
Special inspection requirement — Heating Systems
KING LEUNG
04/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
KING LEUNG
04/30/2020
Permit issued — Plumbing
Q00298199-I1-PL
02/04/2020
Permit issued — Plumbing
Q00298199-I1-PL
01/29/2020
Filed — Alteration
replace existing gas line from cellar to floor 1. No change in use egress or occupancy.
Q00298199-I1
02/14/2008
Violation issued (HPD, open)
B
11/17/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAHT ENGINEERING PLLC07/01/2026
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI03/16/2022
DOB NOWBoiler EquipmentSigned-offGO PRO PLUMBING AND HEATI10/19/2021
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI04/30/2020
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI02/04/2020
BISFPISSUEDCITYWIDE FIRE SYSTEMS PLBG ENG03/23/2006
3 projects · most recent 11/13/2025
General Wiring
FiledStatusContractorScope
11/13/2025Permit IssuedDAVEN ELECTRIC CORPGeneral Wiring
05/16/2025Permit IssuedDAVEN ELECTRIC CORPGeneral Wiring
08/31/2023CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/08/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/28/2021Heating SystemsKING LEUNGspecial
04/28/2021HVAC-R and service water heating equipmentKING LEUNGenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch1
08/17/2026Q01391601-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/27/2026Q00469778-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026Q00469778-I1Open ↗
08/17/2026Q01391601-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026Q00469778-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q00469778-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00469778-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00469778-I1Open ↗