| Owner | Filings | Most Recent |
|---|---|---|
| VENTURA LAND ACQUISITIONS, LLC | 36 | 07/08/2026 |
| BIGFOOT CONSTRUCTION | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GREEN DESIGN CONSTRUCT, LLC | 7 | 03/31/2025 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PRINCE CONTRACTING INC | General Contractor | 2 | 03/21/2026 |
| MADISON ROSA | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| GREEN DESIGN CONSTRUCT, L | 4145 | 6 | 03/31/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | PRINCE CONTRACTING INC | 06/05/2023 |
| DOB NOW | Construction Fence | Permit Issued | MADISON ROSA | 06/06/2022 |
| BIS | — | ISSUED | BIGFOOT CONSTRUCTION LLC | 01/10/2013 |
| BIS | EQ | ISSUED | BIGFOOT CONSTRUCTION LLC | 11/09/2012 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/31/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-SM36NAMHZ2 HYPER HEAT; Paired with (14) MSZ-FS06NA-U1 Non-Ducted Indoor Air Handlers and (10) MSZ-FS12NA-U1 Non-Ducted Indoor Air Handlers, all within the Apartments 36,000 BTU · Heat Pump Outdoor ×10 MXZ-SM36NAMHZ2 HYPER HEAT; Paired With (3) MSZ-FS12NA-U1 Non-Ducted Indoor Air Handlers all within public spaces on 1st floor including recreation and main lobby 48,000 BTU · Vrf Outdoor ×1 MXZ-SM48NAMHZ2 HYPER HEAT; Paired with (2) PEAD-A24AA7 Ducted Indoor Air Handlers, all within Commercial Areas in 1st floor and cellar 48,000 BTU · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/31/2025 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/31/2025 | — | — | 4 scope_items |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/31/2025 | Final | john senisi | progress |
| 03/31/2025 | Exterior Insulation and Finish Systems (EIFS) | john senisi | special |
| 03/31/2025 | Fire-Resistant Penetrations and Joints | john senisi | special |
| 03/31/2025 | Masonry | john senisi | special |
| 03/31/2025 | Mastic and Intumescent Fire-resistant Coatings | john senisi | special |
| 03/31/2025 | Post-installed Anchors | john senisi | special |
| 03/31/2025 | Structural Cold-Formed Steel | john senisi | special |
| 03/31/2025 | Structural Steel - Details | john senisi | special |
| 03/31/2025 | Wall Panels, Curtain Walls, and Veneers | john senisi | special |
| 03/31/2025 | Energy Code Compliance Inspections | john senisi | progress |
| 03/31/2025 | Concrete - Cast-In-Place | john senisi | special |
| 03/31/2025 | Fire-Resistance Rated Construction | john senisi | progress |
| 03/31/2025 | Footing and Foundation | john senisi | progress |
| 03/31/2025 | Air barrier — testing | john senisi | energy_progress |
| 03/31/2025 | Fenestration air leakage | john senisi | energy_progress |
| 03/31/2025 | Maintenance information | john senisi | energy_progress |
| 03/31/2025 | Air barrier - visual inspection | john senisi | energy_progress |
| 03/31/2025 | Interior lighting power | john senisi | energy_progress |
| 03/31/2025 | Fenestration and door U-factor and product ratings | john senisi | energy_progress |
| 03/31/2025 | Exterior lighting power | john senisi | energy_progress |
| 03/31/2025 | Lighting controls | john senisi | energy_progress |
| 03/31/2025 | Protection of exposed foundation insulation | john senisi | energy_progress |
| 03/31/2025 | Metering | john senisi | energy_progress |
| 03/31/2025 | Fenestration areas | john senisi | energy_progress |
| 03/31/2025 | Lighting in dwelling units | john senisi | energy_progress |