← Back
Zoned commercial or Manhattan residential
31-01 37 AVENUE
QUEENS · Queensbridge-Ravenswood-Dutch Kills · BIN 4007889
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M1-2/R6AZoning
0 sfGross Floor Area
0Units
3 Open Violations 2 unresolved · 1 paperwork only ▸
Zoned commercial or Manhattan residential · Owner of record: VENTURA LAND ACQUISITIONS, LLC · 2,929 sf lot · 0 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Roof1p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VENTURA LAND ACQUISITIONS, LLC3607/08/2026
BIGFOOT CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN DESIGN CONSTRUCT, LLC703/31/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRINCE CONTRACTING INCGeneral Contractor203/21/2026
MADISON ROSAGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN DESIGN CONSTRUCT, L4145603/31/2025
Building Lifecycle
All (101)Filed (7)Permit Issued (2)Violation (6)Objection (53)Special Inspection (30)Tax Incentive (3)
01/14/2027
421-a(16) construction completed
11/07/2025
Objection resolved — Resolved
11/07/2025
Objection resolved — Resolved
11/07/2025
Objection resolved — Resolved
11/07/2025
Objection resolved — Resolved
08/05/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
03/31/2025
Filed — New Building
Installation of 1 interior column footing under cellar slab to satisfy the requirements of the 421A abatement program before the 06/15/2022 deadline.
Q00655889-P1
03/31/2025
Special inspection requirement — Final
john senisi
03/31/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
john senisi
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
john senisi
03/31/2025
Special inspection requirement — Masonry
john senisi
03/31/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
john senisi
03/31/2025
Special inspection requirement — Post-installed Anchors
john senisi
03/31/2025
Special inspection requirement — Structural Cold-Formed Steel
john senisi
03/31/2025
Special inspection requirement — Structural Steel - Details
john senisi
03/31/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
john senisi
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
john senisi
03/31/2025
Special inspection requirement — Concrete - Cast-In-Place
john senisi
03/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
john senisi
03/31/2025
Special inspection requirement — Footing and Foundation
john senisi
03/31/2025
Special inspection requirement — Air barrier — testing
john senisi
03/31/2025
Special inspection requirement — Fenestration air leakage
john senisi
03/31/2025
Special inspection requirement — Maintenance information
john senisi
03/31/2025
Special inspection requirement — Air barrier - visual inspection
john senisi
03/31/2025
Special inspection requirement — Interior lighting power
john senisi
03/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
john senisi
03/31/2025
Special inspection requirement — Exterior lighting power
john senisi
03/31/2025
Special inspection requirement — Lighting controls
john senisi
03/31/2025
Special inspection requirement — Protection of exposed foundation insulation
john senisi
03/31/2025
Special inspection requirement — Metering
john senisi
03/31/2025
Special inspection requirement — Fenestration areas
john senisi
03/31/2025
Special inspection requirement — Lighting in dwelling units
john senisi
03/31/2025
Special inspection requirement — Insulation placement and R values
john senisi
03/26/2025
Objection raised — Admin
03/26/2025
Objection raised — Scope
03/26/2025
Objection raised — Scope
03/26/2025
Objection raised — Inspections
03/26/2025
Objection raised — Zoning
03/26/2025
Objection raised — Energy
03/26/2025
Objection raised — Zoning
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/24/2025
Filed — New Building
Installation of 1 interior column footing under cellar slab to satisfy the requirements of the 421A abatement program before the 06/15/2022 deadline.
Q00655889-S6
03/21/2025
Objection raised — Admin
03/21/2025
Objection raised — Inspections
03/21/2025
Objection raised — Other
03/21/2025
Objection raised — Scope
03/21/2025
Objection raised — Admin
03/18/2025
Filed — New Building
Installation of 1 interior column footing under cellar slab to satisfy the requirements of the 421A abatement program before the 06/15/2022 deadline.
Q00655889-S7
03/18/2025
Filed — New Building
Installation of 1 interior column footing under cellar slab to satisfy the requirements of the 421A abatement program before the 06/15/2022 deadline.
Q00655889-S8
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
john senisi
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
john senisi
11/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
john senisi
11/12/2024
Special inspection requirement — Maintenance information
john senisi
07/15/2024
421-a(16) registration filed
01/09/2024
Violation issued (ECB, open)
Construction
01/09/2024
Violation issued (ECB, open)
Construction
12/27/2023
Objection resolved — Addressed
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPRINCE CONTRACTING INC06/05/2023
DOB NOWConstruction FencePermit IssuedMADISON ROSA06/06/2022
BIS—ISSUEDBIGFOOT CONSTRUCTION LLC01/10/2013
BISEQISSUEDBIGFOOT CONSTRUCTION LLC11/09/2012
1 project · most recent 03/31/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ2 HYPER HEAT; Paired with (14) MSZ-FS06NA-U1 Non-Ducted Indoor Air Handlers and (10) MSZ-FS12NA-U1 Non-Ducted Indoor Air Handlers, all within the Apartments 36,000 BTU · Heat Pump Outdoor ×10
MXZ-SM36NAMHZ2 HYPER HEAT; Paired With (3) MSZ-FS12NA-U1 Non-Ducted Indoor Air Handlers all within public spaces on 1st floor including recreation and main lobby 48,000 BTU · Vrf Outdoor ×1
MXZ-SM48NAMHZ2 HYPER HEAT; Paired with (2) PEAD-A24AA7 Ducted Indoor Air Handlers, all within Commercial Areas in 1st floor and cellar 48,000 BTU · Heat Pump Outdoor ×1
Ventilation
Panasonic Intelli-Balance 100 FV-10VEC2 ERV 50 CFM · Erv ×11
Renewaire HE1.5XRT ERV 650 CFM · Erv ×1
1 project · most recent 03/31/2025
Storm Water/Sanitary
FiledStatusContractorScope
03/31/2025——Storm, Water/Sanitary
1 project · most recent 03/31/2025
FiledStatusContractorScope
03/31/2025——4 scope_items
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
03/31/2025Finaljohn senisiprogress
03/31/2025Exterior Insulation and Finish Systems (EIFS)john senisispecial
03/31/2025Fire-Resistant Penetrations and Jointsjohn senisispecial
03/31/2025Masonryjohn senisispecial
03/31/2025Mastic and Intumescent Fire-resistant Coatingsjohn senisispecial
03/31/2025Post-installed Anchorsjohn senisispecial
03/31/2025Structural Cold-Formed Steeljohn senisispecial
03/31/2025Structural Steel - Detailsjohn senisispecial
03/31/2025Wall Panels, Curtain Walls, and Veneersjohn senisispecial
03/31/2025Energy Code Compliance Inspectionsjohn senisiprogress
03/31/2025Concrete - Cast-In-Placejohn senisispecial
03/31/2025Fire-Resistance Rated Constructionjohn senisiprogress
03/31/2025Footing and Foundationjohn senisiprogress
03/31/2025Air barrier — testing john senisienergy_progress
03/31/2025Fenestration air leakagejohn senisienergy_progress
03/31/2025Maintenance informationjohn senisienergy_progress
03/31/2025Air barrier - visual inspectionjohn senisienergy_progress
03/31/2025Interior lighting powerjohn senisienergy_progress
03/31/2025Fenestration and door U-factor and product ratingsjohn senisienergy_progress
03/31/2025Exterior lighting powerjohn senisienergy_progress
03/31/2025Lighting controlsjohn senisienergy_progress
03/31/2025Protection of exposed foundation insulationjohn senisienergy_progress
03/31/2025Meteringjohn senisienergy_progress
03/31/2025Fenestration areasjohn senisienergy_progress
03/31/2025Lighting in dwelling unitsjohn senisienergy_progress
Latest 25 of 47.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00743941-I1Request digital key ↗
08/20/2026Q00655889-S6Request digital key ↗
08/20/2026Q00655889-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION10
01/10/2023440761846Open ↗
06/13/2022420282722Open ↗
06/13/2022420282722Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/10/2023440761846Open ↗
01/10/2023440761846Open ↗
▸BISWORK PERMIT APPLICATION1
01/16/2013420282722Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026Q00655889-P1Open ↗
08/15/2026Q00655889-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026Q00655889-P1Open ↗
08/15/2026Q00655889-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00655889-P1Open ↗
09/01/2026Q00655889-P1Open ↗
09/01/2026Q00655889-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026Q00655889-S8Open ↗
08/20/2026Q00655889-S7Open ↗
08/20/2026Q00655889-S6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00655889-P1Open ↗
09/01/2026Q00655889-P1Open ↗
09/01/2026Q00655889-S1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/10/2023440761846Open ↗
08/05/2014440147850Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/10/2023440761846Open ↗
08/11/2015440243023Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/27/2014420958592Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/11/2015440243023Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/11/2015440243023Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/20/2026Q00655889-P1Open ↗
08/15/2026Q00655889-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/10/2023440761846Open ↗
▸BISSTREET TREE CHECKLIST1
02/10/2023440761846Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026Q00655889-I1Open ↗
▸Environmental & Asbestos3
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
01/10/2023440761846Open ↗
08/11/2015440243023Open ↗
▸DOB NOWOER: Notice to Proceed1
08/20/2026Q00655889-S1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/27/2014420958592Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/11/2015440243023Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS2
03/27/2014420958592Open ↗
11/05/2010420282722Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
05/30/2014420958592Open ↗
03/27/2014420958592Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
04/18/2023440761846Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
01/11/2013420282722Open ↗
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET3
01/10/2023440761846Open ↗
08/11/2015440243023Open ↗
08/05/2014440147850Open ↗
▸BISBOROUGH INTAKE FORM2
06/13/2022420282722Open ↗
06/13/2022420282722Open ↗
▸BISEFILING COVER SHEET2
03/27/2014420958592Open ↗
11/05/2010420282722Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/10/2023440761846Open ↗
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/08/2011420282722Open ↗
12/08/2011420282722Open ↗
▸DOB NOWSite Survey: Initial2
08/20/2026Q00655889-P1Open ↗
08/15/2026Q00655889-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026Q00655889-P1Open ↗
08/15/2026Q00655889-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q00655889-P1Open ↗
08/15/2026Q00655889-I1Open ↗
▸BISPLOT DIAGRAM1
03/27/2014420958592Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/10/2023440761846Open ↗