Primarily 2 family with 1 store or office
31-01 91 STREET
QUEENS · BIN 4034063
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R4Zoning
3,400 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations 0 unresolved · 4 paperwork only ▸
Primarily 2 family with 1 store or office · 2,000 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JKW ENGINEERING, P.C.908/04/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JKW ENGINEERING PC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDWISE CONSTRUCTION GRGeneral Contractor104/09/2026
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
PIPESTYLISTS, INCPlumbing107/08/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JKW ENGINEERING, P.C.1856408/04/2026
Building Lifecycle
All (77)Filed (9)Permit Issued (4)Signed Off (2)Violation (19)Inspection (7)Objection (8)Special Inspection (28)
08/11/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/04/2026
Filed — Alteration
Remove partitions to restore basement to prior legal use. Finishing floor, walls and ceiling as per plans. This application is filed to resolve ECB violations 34622344L, 34622343J, 34848786K and 34848787M. No change in egress, occupancy or use.
Q01206791-P2
08/04/2026
Special inspection requirement — Interior lighting power
James Wai
08/04/2026
Special inspection requirement — Final
James Wai
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
James Wai
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
07/30/2026
Filed — Alteration
Remove partitions to restore basement to prior legal use. Finishing floor, walls and ceiling as per plans. This application is filed to resolve ECB violations 34622344L, 34622343J, 34848786K and 34848787M. No change in egress, occupancy or use.
Q01206791-P1
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
James Wai
07/28/2026
Special inspection requirement — Final
James Wai
07/28/2026
Special inspection requirement — Interior lighting power
James Wai
07/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/29/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2026
Permit issued — Plumbing
Q01206791-S1-PL
12/19/2025
Permit issued — General Construction
Q01206791-I1-GC
11/03/2025
Signed off — Alteration
Remove exist laundromat to restore the premise to prior legal use. Install partition walls, ceiling, finishing floor & HVAC units as per plans. This application is filed to comply with ECB viol. 34853327H & 34853328J. No change in egress, occupancy or use
Q01159906-I1
10/31/2025
Signed off — Alteration
Remove exist laundromat to restore the premise to prior legal use. Install partition walls, ceiling, finishing floor & HVAC units as per plans. This application is filed to comply with ECB viol. 34853327H & 34853328J. No change in egress, occupancy or use
Q01159906-S1
10/07/2025
Filed — Alteration
Remove exist laundromat to restore the premise to prior legal use. Install partition walls, ceiling, finishing floor & HVAC units as per plans. This application is filed to comply with ECB viol. 34853327H & 34853328J. No change in egress, occupancy or use
Q01159906-P3
09/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/03/2025
Violation issued (ECB, closed)
Construction
08/20/2025
Filed — Alteration
Remove exist laundromat to restore the premise to prior legal use. Install partition walls, ceiling, finishing floor & HVAC units as per plans. This application is filed to comply with ECB viol. 34853327H & 34853328J. No change in egress, occupancy or use
Q01159906-P2
08/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
James Wai
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
James Wai
08/15/2025
Special inspection requirement — Lighting controls
James Wai
08/15/2025
Special inspection requirement — Interior lighting power
James Wai
08/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
James Wai
08/15/2025
Special inspection requirement — Maintenance information
James Wai
08/15/2025
Special inspection requirement — Mechanical Systems
James Wai
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
08/15/2025
Special inspection requirement — Final
James Wai
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
James Wai
08/04/2025
Filed — Alteration
Remove exist laundromat to restore the premise to prior legal use. Install partition walls, ceiling, finishing floor & HVAC units as per plans. This application is filed to comply with ECB viol. 34853327H & 34853328J. No change in egress, occupancy or use
Q01159906-P1
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
08/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
James Wai
08/04/2025
Special inspection requirement — Lighting controls
James Wai
08/04/2025
Special inspection requirement — Maintenance information
James Wai
08/04/2025
Special inspection requirement — Interior lighting power
James Wai
08/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
James Wai
08/04/2025
Special inspection requirement — Final
James Wai
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
James Wai
08/04/2025
Special inspection requirement — Mechanical Systems
James Wai
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
James Wai
07/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/16/2025
Permit issued — Plumbing
Q01159906-S1-PL
06/16/2025
Permit issued — General Construction
Q01159906-I1-GC-CX
04/11/2025
Filed — Alteration
Remove partitions to restore basement to prior legal use. Finishing floor, walls and ceiling as per plans. This application is filed to resolve ECB violations 34622344L, 34622343J, 34848786K and 34848787M. No change in egress, occupancy or use.
Q01206791-S1
04/11/2025
Filed — Alteration
Remove partitions to restore basement to prior legal use. Finishing floor, walls and ceiling as per plans. This application is filed to resolve ECB violations 34622344L, 34622343J, 34848786K and 34848787M. No change in egress, occupancy or use.
Q01206791-I1
01/24/2025
Objection raised — Other
01/24/2025
Objection resolved — Addressed
01/24/2025
Objection resolved — Addressed
01/18/2025
Objection resolved — Addressed
01/18/2025
Objection resolved — Addressed
01/10/2025
Objection raised — Admin
01/10/2025
Objection raised — Other
01/10/2025
Objection raised — Other
12/29/2024
Filed — Alteration
Remove exist laundromat to restore the premise to prior legal use. Install partition walls, ceiling, finishing floor & HVAC units as per plans. This application is filed to comply with ECB viol. 34853327H & 34853328J. No change in egress, occupancy or use
Q01159906-I1
12/29/2024
Filed — Alteration
Remove exist laundromat to restore the premise to prior legal use. Install partition walls, ceiling, finishing floor & HVAC units as per plans. This application is filed to comply with ECB viol. 34853327H & 34853328J. No change in egress, occupancy or use
Q01159906-S1
12/04/2024
Violation issued (HPD, closed)
I
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP06/05/2026
DOB NOWGeneral ConstructionSigned-offBUILDWISE CONSTRUCTION GR12/19/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/16/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY06/16/2025
BISPLISSUEDTHE PLUMBING COMPANY INC06/18/2008
BISOTISSUEDYU HUA CONSTRUCTION CORP06/17/2008
BISOTISSUEDYU HUA CONSTRUCTION CORP02/11/2008
BISBLISSUEDV. C. VITANZA SONS INC08/10/1992
BISPLISSUEDV. C. VITANZA SONS INC08/10/1992
BISOTISSUEDFUNG'S SHUNG DEE CONSTRUCTION IN08/06/1992
1 project · most recent 08/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/04/2026Signed-offW.R. PLBG AND HTG CORPGas, Water/Sanitary
1 project · most recent 06/23/2025
General Wiring
FiledStatusContractorScope
06/23/2025CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/11/2026Pass-Final PL - UndergroundPassView ↗
07/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/29/2026Pass-Final PL - UndergroundPassView ↗
06/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/04/2026Interior lighting powerJames Waienergy_progress
08/04/2026FinalJames Waiprogress
08/04/2026Energy Code Compliance InspectionsJames Waiprogress
08/04/2026Fire-Resistant Penetrations and JointsJames Waispecial
07/28/2026Fire-Resistant Penetrations and JointsJames Waispecial
07/28/2026Energy Code Compliance InspectionsJames Waiprogress
07/28/2026FinalJames Waiprogress
07/28/2026Interior lighting powerJames Waienergy_progress
08/15/2025HVAC-R and service water heating system controlsJames Waienergy_progress
08/15/2025HVAC-R and service water piping design and insulationJames Waienergy_progress
08/15/2025Lighting controlsJames Waienergy_progress
08/15/2025Interior lighting powerJames Waienergy_progress
08/15/2025HVAC-R and service water heating equipmentJames Waienergy_progress
08/15/2025Maintenance informationJames Waienergy_progress
08/15/2025Mechanical SystemsJames Waispecial
08/15/2025Fire-Resistant Penetrations and JointsJames Waispecial
08/15/2025FinalJames Waiprogress
08/15/2025Energy Code Compliance InspectionsJames Waiprogress
08/04/2025Fire-Resistant Penetrations and JointsJames Waispecial
08/04/2025HVAC-R and service water heating system controlsJames Waienergy_progress
08/04/2025Lighting controlsJames Waienergy_progress
08/04/2025Maintenance informationJames Waienergy_progress
08/04/2025Interior lighting powerJames Waienergy_progress
08/04/2025HVAC-R and service water heating equipmentJames Waienergy_progress
08/04/2025FinalJames Waiprogress
Latest 25 of 28.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026Q01206791-P2Request digital key ↗
08/20/2026Q01206791-P1Request digital key ↗
08/20/2026Q01206791-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
06/18/2008410055620Open ↗
06/17/2008410055620Open ↗
02/11/2008410055620Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/02/2010420244603Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature20
08/26/2026Q01159906-P1Open ↗
08/26/2026Q01159906-P1Open ↗
08/26/2026Q01159906-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026Q01206791-S1Open ↗
08/20/2026Q01206791-P2Open ↗
08/20/2026Q01206791-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/26/2026Q01159906-P1Open ↗
08/26/2026Q01159906-P1Open ↗
08/25/2026Q01206791-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/02/2010420244603Open ↗
01/22/2008410055620Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/02/2010420244603Open ↗
01/22/2008410055620Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/02/2010420244603Open ↗
01/22/2008410055620Open ↗
▸BISPC FULL REPORT1
01/22/2008410055620Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
09/02/2010420244603Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026Q01206791-P2Open ↗
08/20/2026Q01206791-P1Open ↗
08/19/2026Q01159906-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/02/2010420244603Open ↗
01/22/2008410055620Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
09/02/2010420244603Open ↗
02/08/2008410055620Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/02/2010420244603Open ↗
06/18/2008410055620Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/02/2010420244603Open ↗