← Back
QUEENS
The Oasis Astoria Condominium
31-16 21 STREET · Old Astoria-Hallets Point · BIN 4430821
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
6 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction111p · 2 filings · 20 docs
Floor 7Under Construction111p · 2 filings · 20 docs
Floor 6Under Construction113p · 2 filings · 20 docs
Floor 5Under Construction13p · 2 filings · 20 docs
Floor 4Under Construction13p · 2 filings · 20 docs
Floor 3Under Construction13p · 2 filings · 20 docs
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction13p · 2 filings · 20 docs
CellarUnder Construction19p · 1 filing · 20 docs
Site & exteriorUnder Construction13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTRAL REALTY LIC5607/08/2026
FBL DEVELOPMENT4807/08/2026
TRI BOROUGH SCAFFOLDING307/03/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/08/2022$10.3M—THE GREEN POINT THREE, LLC → FBL ASTORIA LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANGELO NG + ANTHONY NG ARCHITECTS2603/21/2026
TURNKEY CONTRACTING1603/21/2026
CCA CONSTRUCTION CONSULTING ASSOCIA903/21/2026
FAVIO MARIA BARRIONUEVO203/21/2026
THE GREEN STUDIO403/21/2026
MILLENNIUM DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor1407/08/2026
BBTS MANAGEMENT INCGeneral Contractor1307/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor507/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection507/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
STONEHILL CONSTR SERV INCGeneral Contractor104/09/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T ENGINEERING, P.C.5912808/19/2025
AMC ENGINEERING PLLC3716110/31/2024
Building Lifecycle
All (218)Filed (39)Permit Issued (37)Signed Off (12)Violation (46)Inspection (17)Objection (34)Special Inspection (30)Tax Incentive (3)
07/01/2026
Signed off — Alteration
Q00942800-I1
06/12/2026
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-S8
05/11/2026
Violation issued (HPD, open)
A
02/04/2026
Violation issued (HPD, open)
C
02/04/2026
Violation issued (HPD, open)
C
02/04/2026
Violation issued (HPD, open)
A
02/04/2026
Violation issued (HPD, closed)
C
02/04/2026
Violation issued (HPD, open)
C
02/04/2026
Violation issued (HPD, open)
B
10/29/2025
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-S6
10/29/2025
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-Z1
09/15/2025
Special inspection requirement — Air barrier - visual inspection
Fei Zeng
09/15/2025
Special inspection requirement — Electrical motors and elevators
Fei Zeng
09/15/2025
Special inspection requirement — Interior lighting power
Fei Zeng
09/15/2025
Special inspection requirement — Lighting in dwelling units
Fei Zeng
09/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Fei Zeng
09/15/2025
Special inspection requirement — Insulation placement and R values
Fei Zeng
09/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fei Zeng
09/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
09/15/2025
Special inspection requirement — Air barrier — testing
Fei Zeng
09/15/2025
Special inspection requirement — Metering
Fei Zeng
09/15/2025
Special inspection requirement — Vestibules
Fei Zeng
09/15/2025
Special inspection requirement — Lighting controls
Fei Zeng
09/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fei Zeng
09/15/2025
Special inspection requirement — Fenestration air leakage
Fei Zeng
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
09/15/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Fei Zeng
09/15/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Fei Zeng
09/15/2025
Special inspection requirement — Lowest Floor Elevation
Fei Zeng
09/15/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Fei Zeng
09/15/2025
Special inspection requirement — Exterior lighting power
Fei Zeng
09/15/2025
Special inspection requirement — Fenestration areas
Fei Zeng
09/15/2025
Special inspection requirement — Maintenance information
Fei Zeng
09/15/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Fei Zeng
08/19/2025
Filed — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-C2
08/19/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Fei Zeng
08/19/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Fei Zeng
08/19/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fei Zeng
08/19/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Fei Zeng
08/19/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Fei Zeng
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
07/15/2025
Filed — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-C1
06/10/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/28/2025
Filed — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-B9
03/19/2025
Filed — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-B8
03/11/2025
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-S4
03/11/2025
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-S5
03/11/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLDING, AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00904242-I1
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2025
Filed — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-B5
02/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
02/24/2025
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-S3
02/24/2025
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-S2
02/24/2025
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-Z3
02/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2025
Signed off — New Building
FILING EIGHT (8) STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS.
Q08016879-S7
01/27/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/15/2025
Permit issued — Standpipe
Q08016879-S6-EW-SD
Latest 60 of 218 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offCITYWIDE PLBG, HTG &SPRKL01/15/2025
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL01/15/2025
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/22/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/18/2024
DOB NOWSupport of ExcavationSigned-offBBTS MANAGEMENT INC06/21/2024
DOB NOWGeneral ConstructionPermit IssuedBBTS MANAGEMENT INC06/21/2024
DOB NOWFoundationSigned-offBBTS MANAGEMENT INC06/21/2024
DOB NOWStructuralSigned-offBBTS MANAGEMENT INC06/21/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS04/08/2024
DOB NOWMechanical SystemsSigned-offBBTS MANAGEMENT INC03/06/2024
DOB NOWFoundationSigned-offBBTS MANAGEMENT INC02/09/2024
DOB NOWStructuralSigned-offBBTS MANAGEMENT INC02/09/2024
DOB NOWSupport of ExcavationSigned-offBBTS MANAGEMENT INC02/09/2024
DOB NOWGeneral ConstructionPermit IssuedBBTS MANAGEMENT INC02/09/2024
DOB NOWConstruction FenceSigned-offBBTS MANAGEMENT INC02/09/2024
DOB NOWStructuralSigned-offACER CONSTRUCTION INC12/29/2023
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC12/29/2023
DOB NOWFoundationSigned-offACER CONSTRUCTION INC12/29/2023
DOB NOWSupport of ExcavationSigned-offACER CONSTRUCTION INC12/29/2023
DOB NOWStandpipeSigned-offCITYWIDE PLBG, HTG &SPRKL10/19/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL10/18/2023
DOB NOWStandpipeSigned-offCITYWIDE PLBG, HTG &SPRKL10/18/2023
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC10/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC10/13/2023
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC10/13/2023
DOB NOWStructuralSigned-offACER CONSTRUCTION INC10/13/2023
DOB NOWFoundationSigned-offACER CONSTRUCTION INC10/12/2023
DOB NOWSupport of ExcavationSigned-offACER CONSTRUCTION INC10/12/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/16/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/16/2023
DOB NOWSupport of ExcavationSigned-offACER CONSTRUCTION INC05/31/2023
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS04/05/2023
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC04/04/2023
DOB NOWStructuralSigned-offACER CONSTRUCTION INC04/04/2023
DOB NOWCurb CutSigned-offACER CONSTRUCTION INC04/04/2023
DOB NOWFoundationSigned-offACER CONSTRUCTION INC03/22/2023
DOB NOWConstruction FenceSigned-offSTONEHILL CONSTR SERV INC03/02/2023
BIS—ISSUEDTHE GREEN PONT THREE LLC.05/03/2006
1 project · most recent 08/19/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2025Signed-offBBTS MANAGEMENT INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree GMV-36WL/B-T(U) 36,000 BTU · Vrf Outdoor ×104
GMV-24WL/C-T(U) 24,000 BTU · Vrf Outdoor ×6
GMV-72WM/B-F(U) 72,000 BTU · Vrf Outdoor ×2
General Electric AZ45E12DBM 1 tons · Ptac ×1
Ventilation
N/A CUE-140-VG 2,000 CFM · Exhaust Fan ×3
AX-72-190- 0415-A30 8,400 CFM · Exhaust Fan ×4
CUE-080-VG 100 CFM · Exhaust Fan ×1
CUE-160-VG 2,400 CFM · Exhaust Fan ×1
SQ-80-VG 150 CFM · Exhaust Fan ×1
USF-06 275 CFM ×1
Greenheck SQ-70-VG 130 CFM · Exhaust Fan ×2
CUE-140-VG 1,000 CFM · Exhaust Fan ×2
CUE-160-VG 2,200 CFM · Exhaust Fan ×2
RVE-40-36D-101-C-D1 10 tons · Erv ×1
Fantech FG-4XL-EC 130 CFM · Exhaust Fan ×4
— CUE-140-VG 2,000 CFM · Exhaust Fan ×3
CUE-080-VG 100 CFM · Exhaust Fan ×1
CUE-160-VG 2,400 CFM · Exhaust Fan ×1
SQ-80-VG 150 CFM · Exhaust Fan ×1
SQ-90-VG 260 CFM · Exhaust Fan ×1
USF-06 275 CFM ×1
Aaon RNA-009-8-0-HA09-3FB 9 tons · Erv ×1
Empire WIND-DRIVEN TURBINE EXHAUST VENTILATOR, MODEL NO. TV06G 147 CFM · Exhaust Fan ×1
1 project · most recent 08/19/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2025Signed-offDYNAMIC PLBG & SPRKLR CORGas, Storm, Water/Sanitary
6 projects · most recent 03/18/2024
General Wiring
FiledStatusContractorScope
03/18/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
03/05/2024CompleteAL-LECTRIC ELECT'L CONTRG—
09/19/2023CompleteNASH ELECTRIC SERVICES IN—
08/21/2023CompleteNASH ELECTRIC SERVICES IN—
08/14/2023CompleteAL-LECTRIC ELECT'L CONTRG1 meters, 1 new_meters
05/26/2023CompleteTUXEDO ELEC'L CONTR'G INC—
1 project · most recent 08/19/2025
Concrete
FiledStatusContractorScope
08/19/2025Signed-offDYNAMIC PLBNG & SPRKR CORConcrete
1 project · most recent 08/19/2025
Fence
FiledStatusContractorScope
08/19/2025Signed-offDYNAMIC PLBNG & SPRKR CORFence
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
06/10/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
02/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/26/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
02/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/15/2025Fail-Final SP - Up to 9 Requested FloorsFailView ↗
01/15/2025Pass-Final SD - Fire PumpPassView ↗
01/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
01/09/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/15/2025Alternative Materials - OTCR Buildings Bulletin NumberFei Zengspecial
09/15/2025MeteringFei Zengenergy_progress
09/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFei Zengspecial
09/15/2025Fire-Resistant Penetrations and JointsFei Zengspecial
09/15/2025VestibulesFei Zengenergy_progress
09/15/2025Fenestration areasFei Zengenergy_progress
09/15/2025Air barrier — testing Fei Zengenergy_progress
09/15/2025Maintenance informationFei Zengenergy_progress
09/15/2025Fire-Resistance Rated ConstructionFei Zengprogress
09/15/2025Wall Panels, Curtain Walls, and VeneersFei Zengspecial
09/15/2025Lowest Floor ElevationFei Zengprogress
09/15/2025Interior lighting powerFei Zengenergy_progress
09/15/2025Insulation placement and R valuesFei Zengenergy_progress
09/15/2025Fenestration air leakageFei Zengenergy_progress
09/15/2025Energy Code Compliance InspectionsFei Zengprogress
09/15/2025Exterior lighting powerFei Zengenergy_progress
09/15/2025Lighting in dwelling unitsFei Zengenergy_progress
09/15/2025Lighting controlsFei Zengenergy_progress
09/15/2025Exterior Insulation and Finish Systems (EIFS)Fei Zengspecial
09/15/2025Air barrier - visual inspectionFei Zengenergy_progress
09/15/2025Electrical motors and elevatorsFei Zengenergy_progress
09/15/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Fei Zengspecial
09/15/2025Fenestration and door U-factor and product ratingsFei Zengenergy_progress
08/19/2025Electrical motors and elevatorsFei Zengenergy_progress
08/19/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Fei Zengspecial
Latest 25 of 150.
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch39
08/24/2026Q00904242-P2Request digital key ↗
08/24/2026Q00904242-P3Request digital key ↗
08/24/2026Q00904242-I1Request digital key ↗
Showing 3 of 39 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
07/17/2025440754015Open ↗
03/28/2025421841564Open ↗
01/12/2023440754015Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
10/30/2024421841564Open ↗
10/30/2024421841564Open ↗
10/30/2024421841564Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram11
08/13/2026Q08016879-A6Open ↗
08/13/2026Q08016879-C2Open ↗
Showing 2 of 11 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
10/30/2024421841564Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/30/2024421841564Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/30/2024421841564Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications134
▸DOB NOWProgress Inspector Seal & Signature51
09/23/2026Q08016879-A4Open ↗
09/02/2026Q08016879-P3Open ↗
09/01/2026Q08016879-S4Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
09/23/2026Q08016879-A4Open ↗
09/23/2026Q08016879-A4Open ↗
09/02/2026Q08016879-S6Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature39
08/24/2026Q00904242-P1Open ↗
08/24/2026Q00904242-P2Open ↗
08/24/2026Q00904242-I1Open ↗
Showing 3 of 39 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/12/2023440754015Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/12/2023440754015Open ↗
▸Trade Schedules & Equipment12
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q08016879-I1—
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist11
08/13/2026Q08016879-C2Open ↗
08/13/2026Q08016879-C1Open ↗
Showing 2 of 11 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
09/11/2024440754015Open ↗
▸BISSTREET TREE CHECKLIST1
09/11/2024440754015Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos28
▸DOB NOWOER: Notice to Proceed20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
02/24/2025440754015Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/12/2023440754015Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q08016879-P4Open ↗
08/13/2026Q08016879-S2Open ↗
08/13/2026Q08016879-A8Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q08016879-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q08016879-S2Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
07/21/2025440754015Open ↗
02/06/2025440754015Open ↗
▸BISEFILING COVER SHEET1
03/28/2025421841564Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/12/2023440754015Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/15/2023440754015Open ↗
▸Other Documents45
▸DOB NOWSite Survey: Initial11
08/13/2026Q08016879-C1Open ↗
08/13/2026Q08016879-C2Open ↗
Showing 2 of 11 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWProperty Ownership Certification11
08/20/2026Q08016879-C2Open ↗
08/20/2026Q08016879-C1Open ↗
08/20/2026Q08016879-B9Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWFlood Plan Emergency Temporary Flood Shields4
08/20/2026Q08016879-C2Open ↗
08/20/2026Q08016879-C1Open ↗
08/20/2026Q08016879-B9Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
03/15/2023440754015Open ↗
01/12/2023440754015Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q08016879-S2Open ↗
08/13/2026Q08016879-S1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
10/30/2024421841564Open ↗
▸BISBPP51
09/11/2024440754015Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q08016879-I1Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type