Two family converted from one family
31-24 COLD SPRING ROAD
QUEENS · BIN 4300547
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R2Zoning
—Gross Floor Area
2Units
Two family converted from one family · 0.38 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/11/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/23/2026
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 21 modules, 8.61 KW
Q01331615-I1
12/23/2025
Permit issued — Solar
Q01331615-I1-SL
12/11/2025
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 21 modules, 8.61 KW
Q01331615-I1
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/11/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/10/2025
Special inspection requirement — Final
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/23/2025
BISCCISSUEDMARTA CONSTRUCTION INC11/25/2003
BISOTISSUEDMARTA COSNTRUCTION INC02/10/2003
BISPLISSUEDSPARACO'S P&H CORP02/09/2001
BIS—ISSUEDN/A09/20/2000
1 job · most recent 12/11/2025
FiledStatusContractorScope
12/11/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/11/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
12/11/2025Air barrier - visual inspectionMina Makarenergy_progress
12/10/2025Fire-Resistant Penetrations and JointsMina Makarspecial
12/10/2025Energy Code Compliance InspectionsMina Makarprogress
12/10/2025FinalMina Makarprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01331615-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q01331615-I1Open ↗
08/28/2026Q01331615-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01331615-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q01331615-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01331615-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01331615-I1Open ↗