← Back
BuildNYC
Three families
31-25 14TH STREET
QUEENS · BIN 4005856
💬 Discuss this project
1930Year Built
3Stories
C0Building Class
R6BZoning
3,531 sfGross Floor Area
3Units
Rent Stabilized56 Active Violations ▸
Three families · 2,485 sf lot · 1.42 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 12 docs
BulkheadUnder Construction1p · 1 filing · 12 docs
Floor 1Under Construction8p · 1 filing · 12 docs
CellarUnder Construction2p · 1 filing · 12 docs
Site & exteriorUnder Construction8p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Trevor O. Flowers108/24/2026
Askon Architects207/17/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Akala ConstructionScaffold108/25/2026
Assured BuildersScaffold104/09/2026
Building Lifecycle
All (103)Filed (3)Permit Issued (2)Violation (60)Objection (14)Special Inspection (24)
08/24/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING FOR CONSTRUCTION FENCE
Q00908267-S2
08/24/2026
Permit issued — Sidewalk Shed
Q00908267-S2-SH
05/06/2026
Violation issued (HPD, open)
A
03/10/2026
Objection resolved — Addressed
01/15/2026
Objection resolved — Addressed
12/03/2025
Objection raised — Other
11/21/2025
Violation issued (HPD, open)
I
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
09/07/2025
Special inspection requirement — Lighting in dwelling units
09/07/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/07/2025
Special inspection requirement — Masonry
09/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/07/2025
Special inspection requirement — Subgrade Inspections
09/07/2025
Special inspection requirement — Vestibules
09/07/2025
Special inspection requirement — Protection of exposed foundation insulation
09/07/2025
Special inspection requirement — Exterior lighting power
09/07/2025
Special inspection requirement — Interior lighting power
09/07/2025
Special inspection requirement — Lighting controls
09/07/2025
Special inspection requirement — Concrete - Cast-In-Place
09/07/2025
Special inspection requirement — Energy Code Compliance Inspections
09/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/07/2025
Special inspection requirement — Air barrier — testing
09/07/2025
Special inspection requirement — Maintenance information
09/07/2025
Special inspection requirement — Air barrier continuity plan testing
09/07/2025
Special inspection requirement — Metering
08/05/2025
Permit issued — Construction Fence
Q00908267-S1-FN
07/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING FOR CONSTRUCTION FENCE
Q00908267-S1
06/30/2025
Special inspection requirement — Fenestration areas
06/30/2025
Special inspection requirement — Insulation placement and R values
06/30/2025
Special inspection requirement — Fenestration air leakage
06/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/30/2025
Special inspection requirement — Air barrier - visual inspection
06/11/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
C
11/27/2024
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, closed)
C
04/17/2024
Violation issued (HPD, closed)
C
04/17/2024
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
C
04/17/2024
Violation issued (HPD, open)
C
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
B
04/16/2024
Violation issued (HPD, open)
B
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAkala Construction08/24/2026
DOB NOWConstruction FencePermit IssuedAssured Builders08/05/2025
1 project · most recent 08/24/2026
FiledStatusContractorScope
08/24/2026Permit IssuedRichard Neu—
1 project · most recent 08/24/2026
Fence
FiledStatusContractorScope
08/24/2026Permit IssuedAkala ConstructionFence
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
09/07/2025Lighting in dwelling units—energy_progress
09/07/2025Excavations - Sheeting, Shoring, and Bracing—special
09/07/2025Fire-Resistant Penetrations and Joints—special
09/07/2025Masonry—special
09/07/2025Structural Stability – Alterations of existing buildings—special
09/07/2025Subgrade Inspections—special
09/07/2025Vestibules—energy_progress
09/07/2025Protection of exposed foundation insulation—energy_progress
09/07/2025Exterior lighting power—energy_progress
09/07/2025Interior lighting power—energy_progress
09/07/2025Lighting controls—energy_progress
09/07/2025Concrete - Cast-In-Place—special
09/07/2025Energy Code Compliance Inspections—progress
09/07/2025Fire-Resistance Rated Construction—progress
09/07/2025Air barrier — testing —energy_progress
09/07/2025Maintenance information—energy_progress
09/07/2025Air barrier continuity plan testing—energy_progress
09/07/2025Metering—energy_progress
06/30/2025Fenestration areas—energy_progress
06/30/2025Insulation placement and R values—energy_progress
06/30/2025Fenestration air leakage—energy_progress
06/30/2025Fenestration and door U-factor and product ratings—energy_progress
06/30/2025Air barrier - visual inspection—energy_progress
08/06/2023Lowest Floor Elevation—progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026Q00908267-S1Request digital key ↗
08/24/2026Q00908267-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00908267-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q00908267-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00908267-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026Q00908267-S2Open ↗
08/13/2026Q00908267-I1Open ↗
08/13/2026Q00908267-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00908267-S1Open ↗
08/13/2026Q00908267-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00908267-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00908267-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00908267-I1Open ↗