← Back
Two family brick
31-30 28 ROAD
QUEENS · BIN 4008621
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R6BZoning
1,910 sfGross Floor Area
2Units
Two family brick · 3,537 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
BulkheadUnder Construction2p · 1 filing · 10 docs
Floor 3Under Construction2p · 1 filing · 10 docs
Floor 2
Floor 1Under Construction2p · 1 filing · 10 docs
CellarUnder Construction2p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MK IMPROVEMENT GROUP509/25/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DIAGRID CONSULTANTS508/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LINGE CONSTRUCTIONGeneral Contractor109/25/2026
Building Lifecycle
All (50)Filed (5)Permit Issued (1)Objection (14)Special Inspection (30)
09/24/2026
Permit issued — Construction Fence
Q01353015-S7-FN
08/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO AN EXISTING 2 STORY & CELLAR BUILDING.
Q01353015-S3
08/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO AN EXISTING 2 STORY & CELLAR BUILDING.
Q01353015-S2
08/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO AN EXISTING 2 STORY & CELLAR BUILDING.
Q01353015-S1
08/24/2026
Objection resolved — Addressed
08/24/2026
Special inspection requirement — Structural Steel - Welding
08/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
08/24/2026
Special inspection requirement — Concrete - Cast-In-Place
08/24/2026
Special inspection requirement — Masonry
08/19/2026
Special inspection requirement — Structural Steel - Details
08/19/2026
Special inspection requirement — Structural Cold-Formed Steel
08/19/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/19/2026
Special inspection requirement — Subgrade Inspections
07/30/2026
Objection raised — Structural
07/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO AN EXISTING 2 STORY & CELLAR BUILDING.
Q01353015-S7
07/29/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Addressed
06/10/2026
Special inspection requirement — Metering
05/29/2026
Objection raised — Other
05/26/2026
Objection raised — Energy
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/19/2026
Objection resolved — Addressed
05/19/2026
Special inspection requirement — Concrete - Cast-In-Place
05/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/19/2026
Special inspection requirement — Subgrade Inspections
05/18/2026
Special inspection requirement — Final
05/18/2026
Special inspection requirement — Final
05/18/2026
Special inspection requirement — Footing and Foundation
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/16/2026
Objection raised — Energy
04/16/2026
Objection raised — Other
04/16/2026
Objection raised — Other
03/31/2026
Objection resolved — Addressed
03/19/2026
Objection raised — Admin
03/06/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO AN EXISTING 2 STORY & CELLAR BUILDING.
Q01353015-I1
02/10/2026
Special inspection requirement — Lighting in dwelling units
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
02/10/2026
Special inspection requirement — Lighting controls
02/10/2026
Special inspection requirement — Interior lighting power
02/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
02/10/2026
Special inspection requirement — Exterior lighting power
02/10/2026
Special inspection requirement — Maintenance information
01/29/2026
Special inspection requirement — Fenestration air leakage
01/29/2026
Special inspection requirement — Insulation placement and R values
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedLINGE CONSTRUCTION INC09/24/2026
1 job · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026Permit IssuedLINGE CONSTRUCTION INC1 scope_items
1 job · most recent 08/26/2026
Fence
FiledStatusContractorScope
08/26/2026Permit IssuedLINGE CONSTRUCTION INCFence
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/24/2026Structural Steel - Welding—special
08/24/2026Structural Steel - High Strength Bolting—special
08/24/2026Concrete - Cast-In-Place—special
08/24/2026Masonry—special
08/19/2026Structural Steel - Details—special
08/19/2026Structural Cold-Formed Steel—special
08/19/2026Excavations - Sheeting, Shoring, and Bracing—special
08/19/2026Subsurface Investigations (Borings/Test Pits)—special
08/19/2026Subgrade Inspections—special
06/10/2026Metering—energy_progress
05/20/2026Structural Stability – Alterations of existing buildings—special
05/19/2026Concrete - Cast-In-Place—special
05/19/2026Structural Stability – Alterations of existing buildings—special
05/19/2026Structural Stability – Alterations of existing buildings—special
05/19/2026Subsurface Investigations (Borings/Test Pits)—special
05/19/2026Subgrade Inspections—special
05/18/2026Final—progress
05/18/2026Final—progress
05/18/2026Footing and Foundation—progress
02/10/2026Lighting in dwelling units—energy_progress
02/10/2026Fire-Resistant Penetrations and Joints—special
02/10/2026Exterior Insulation and Finish Systems (EIFS)—special
02/10/2026Lighting controls—energy_progress
02/10/2026Interior lighting power—energy_progress
02/10/2026Fire-Resistance Rated Construction—progress
Latest 25 of 34.
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01353015-I1Request digital key ↗
08/15/2026Q01353015-S7Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01353015-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01353015-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01353015-S2Open ↗
08/17/2026Q01353015-S1Open ↗
08/17/2026Q01353015-S7Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q01353015-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01353015-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01353015-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01353015-I1Open ↗