← Back
BuildNYC
Elevator cooperative
31-31 138TH STREET
QUEENS · BIN 4440075
💬 Discuss this project
1953Year Built
6Stories
D4Building Class
R5Zoning
176,061 sfGross Floor Area
136Units
LL97 CoveredRent Stabilized24 Active Violations 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Linden Towers Cooperative #2 · 74,923 sf lot · 2.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLinden Towers #2 Coop INC1p · 1 filing · 10 docs
BulkheadLinden Towers #2 Coop INC1p · 1 filing · 10 docs
Floor 6Linden Towers #2 Coop INC38p · 1 filing · 10 docs
Floor 5Linden Towers #2 Coop INC38p · 1 filing · 10 docs
Floor 4Linden Towers #2 Coop INC38p · 1 filing · 10 docs
Floor 3Linden Towers #2 Coop INC38p · 1 filing · 10 docs
Floor 2Linden Towers #2 Coop INC41p · 2 filings · 13 docs
Floor 1Linden Towers #2 Coop INC43p · 2 filings · 12 docs
Site & exteriorHeavy duty sidewalk shed installation6p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Linden Towers Co-OP #22103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/11/2018$131K—AFP TWENTY THREE CORP. → LINDEN TOWERS COOPERATIVE #2 INC.$1/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Node Architecture, Engineering, Cons207/21/2022
Syed Engineering108/11/2021
Royal T&E108/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
City Limit Construction *General Contractor303/21/2026
Star Electrical ContractorsElectrical103/22/2026
Topline NYC ContractingScaffold107/08/2026
Triera ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Node Architecture, Engineering6799207/21/2022
Building Lifecycle
All (84)Filed (4)Permit Issued (3)Signed Off (1)Facade (FISP) (12)Violation (60)Special Inspection (4)
12/18/2023
Violation issued (ECB, open)
Construction
12/04/2023
Violation issued (ECB, open)
Unknown
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2022
Violation issued (HPD, closed)
C
11/07/2022
Violation issued (HPD, open)
A
10/08/2022
Violation issued (ECB, open)
Construction
10/08/2022
Violation issued (ECB, open)
Construction
10/08/2022
Violation issued (ECB, open)
Construction
10/08/2022
Violation issued (ECB, open)
Construction
09/24/2022
Violation issued (ECB, open)
Construction
08/20/2022
Violation issued (HPD, open)
B
08/20/2022
Violation issued (HPD, open)
C
08/04/2022
Cycle 9 facade report submitted
08/02/2022
Cycle 9 facade report signed — SAFE
07/29/2022
Cycle 9 facade inspection completed
07/26/2022
Signed off — Alteration
Herewith Filing Facade Repairs as per plans.
Q00562361-I1
07/25/2022
Special inspection requirement — Masonry
Radomir Delic
07/25/2022
Special inspection requirement — Final
Radomir Delic
07/21/2022
Filed — Alteration
Herewith Filing Facade Repairs as per plans.
Q00562361-P2
07/21/2022
Special inspection requirement — Masonry
Radomir Delic
07/21/2022
Special inspection requirement — Final
Radomir Delic
03/04/2022
Violation issued (HPD, closed)
A
03/04/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/05/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/03/2021
Violation issued (ECB, closed)
Construction
11/04/2021
Violation issued (ECB, closed)
Construction
11/04/2021
Violation issued (ECB, closed)
Construction
11/04/2021
Violation issued (ECB, closed)
Construction
10/09/2021
Violation issued (ECB, closed)
Construction
10/09/2021
Violation issued (ECB, closed)
Unknown
10/09/2021
Violation issued (ECB, open)
Construction
10/09/2021
Violation issued (ECB, closed)
Site Safety
10/09/2021
Violation issued (ECB, closed)
Construction
09/29/2021
Violation issued (ECB, closed)
Construction
09/13/2021
Violation issued (HPD, open)
B
09/13/2021
Violation issued (HPD, open)
A
09/13/2021
Violation issued (HPD, open)
B
08/13/2021
Permit issued — General Construction
Q00562361-I1-GC
08/11/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00573655-I1
08/11/2021
Permit issued — Sidewalk Shed
Q00573655-I1-SH
08/02/2021
Filed — Alteration
Herewith Filing Facade Repairs as per plans.
Q00562361-I1
04/06/2021
Violation issued (ECB, closed)
Construction
03/21/2021
Violation issued (HPD, open)
B
03/21/2021
Violation issued (HPD, closed)
A
11/11/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2020
Violation issued (ECB, closed)
Construction
08/28/2020
Violation issued (HPD, open)
A
08/28/2020
Violation issued (HPD, closed)
A
08/28/2020
Violation issued (HPD, open)
B
08/19/2020
Violation issued (ECB, closed)
Construction
08/14/2020
Violation issued (HPD, closed)
A
08/14/2020
Violation issued (HPD, closed)
A
08/14/2020
Violation issued (HPD, closed)
A
01/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/13/2019
Violation issued (HPD, closed)
C
11/13/2019
Violation issued (HPD, open)
B
11/13/2019
Violation issued (HPD, closed)
C
11/13/2019
Violation issued (HPD, closed)
A
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCity Limit Construction *08/13/2021
DOB NOWSidewalk ShedPermit IssuedTopline NYC Contracting08/11/2021
DOB NOWSidewalk ShedPermit IssuedTriera Contracting08/23/2019
BISOTISSUEDVirola Construction11/10/2020
BISOTISSUEDRCD Restorations05/03/2018
BISOTISSUEDRCD Restorations09/03/2015
BISPLISSUEDTechno Plumbing02/25/2004
BIS—ISSUEDZenco Construction Company02/18/2004
BISOTISSUEDXinos Construction04/18/2003
BISEQISSUEDXinos Construction04/08/2003
BISEQISSUEDXinos Construction03/17/2003
BISSPISSUEDApple Incinerator & Compactor06/14/1990
BISSPISSUEDApple Incinerator & Compactor06/14/1990
2 projects · most recent 08/18/2021
FiledStatusContractorScope
08/18/2021Permit IssuedRichard Neu—
05/22/2018Permit IssuedStar Electrical Contractors—
2 projects · most recent 08/11/2021
Sidewalk Shed
FiledStatusContractorScope
08/11/2021Permit IssuedTopline NYC ContractingSidewalk Shed
08/23/2019Permit IssuedTriera ContractingSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/25/2022MasonryRadomir Delicspecial
07/25/2022FinalRadomir Delicprogress
07/21/2022MasonryRadomir Delicspecial
07/21/2022FinalRadomir Delicprogress
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/27/2026Q00562361-I1Request digital key ↗
08/27/2026Q00562361-P2Request digital key ↗
08/27/2026Q00573655-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00215887-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
06/10/2022440643751Open ↗
04/22/2021440643751Open ↗
11/02/2020440643751Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
11/10/2020440643751Open ↗
05/11/2018421625487Open ↗
09/11/2015421210371Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00215887-I1Open ↗
08/13/2026Q00562361-I1Open ↗
08/13/2026Q00573655-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/02/2020440643751Open ↗
04/26/2018421625487Open ↗
09/10/2015421210371Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/26/2018421625487Open ↗
11/28/2015421210371Open ↗
09/10/2015421210371Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/26/2018421625487Open ↗
09/10/2015421210371Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00562361-P2Open ↗
08/22/2026Q00562361-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q00562361-P2Open ↗
08/22/2026Q00562361-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/02/2020440643751Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/02/2020440643751Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
04/26/2018421625487Open ↗
11/02/2020440643751Open ↗
▸DOB NOWTenant Protection Plan1
08/28/2026Q00215887-I1Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/02/2020440643751Open ↗
04/26/2018421625487Open ↗
09/10/2015421210371Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00562361-I1Open ↗
08/13/2026Q00562361-P2Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/26/2018421625487Open ↗
11/27/2015421210371Open ↗
09/10/2015421210371Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/28/2015421210371Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/13/2022440643751Open ↗
11/05/2020440643751Open ↗
11/02/2020440643751Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/15/2022440643751Open ↗
12/07/2015421210371Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/10/2015421210371Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
11/02/2020440643751Open ↗
04/26/2018421625487Open ↗
11/28/2015421210371Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/13/2022440643751Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
04/26/2018421625487Open ↗
09/10/2015421210371Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/02/2020440643751Open ↗