Office only, 2-6 stories
31-42 STEINWAY STREET
QUEENS · Astoria (East)-Woodside (North) · BIN 4010530
💬 Discuss this project
1985Year Built
2Stories
O2Building Class
C4-2AZoning
2,875 sfGross Floor Area
1Units
0 Open Violations
Office only, 2-6 stories · Owner of record: MASPETH FEDERAL SAVINGS AND LOAN ASSOCIA TION · 2,250 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilOther
Roof26p · 4 filings · 20 docs
Floor 138p · 5 filings · 20 docs
Mezzanine40p · 4 filings · 20 docs
Cellar42p · 5 filings · 20 docs
Site & exterior36p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MASPETH FEDERAL SAVINGS2407/08/2026
VEZANDIO CONTRACTING203/21/2026
31-42 STEINWAY ASSOCIATES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/25/2024$3.5M—GRAMPS GIFT LLC → MASPETH FEDERAL SAVINGS AND LOAN ASSOCIATION$1,217/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UNIVERSAL SIGNS SERVICE403/21/2026
OCULUS CONSULTING GROUP1003/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H.M. HUGHES CO. INCGeneral Contractor607/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor204/09/2026
UNIVERSAL SIGNS SVCScaffold207/08/2026
CARA PLUMBING GROUP INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930810/08/2025
Building Lifecycle
All (82)Filed (14)Permit Issued (9)Signed Off (9)Violation (1)Inspection (3)Objection (16)Special Inspection (30)
12/03/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01131919-S1
12/03/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01131919-I1
12/02/2025
Signed off — Alteration
INT ALT OF EX BANK AT 1ST FL & MEZZ. NEW PARTITIONS, COUNTERS/CABS/MILL/FINISHES. NEW SUSP CEILING. NEW TOILETS & LOUNGE. REFURBISH EX MEZZ. NEW FIRE-RATED EXT STOREFRONT GLAZING SYSTEM AT N&E FACADES. NEW EXT FINISHES & AWNING. NO CHANGE USE/OCC/EGRESS.
Q01164462-I1
11/18/2025
Signed off — Alteration
MODIFICATIONS TO THE EX PLUMBING SYSTEM AT THE EX COMMERCIAL BANK. NEW TOILETS AND EMPLOYEE LOUNGE AT 1ST FLOOR. NEW ROOF DRAINS. NEW GAS CONNECTION TO ROOFTOP MECHANICAL UNIT. MODIFICATIONS TO EX PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01164475-I1
10/20/2025
Signed off — Alteration
Q01245135-I1
10/20/2025
Signed off — Alteration
ERECT ACCECSSORY BUSINESS WALL SIGN FOR MASPETH FEDERAL SAVINGS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01245140-I1
10/14/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/09/2025
Special inspection requirement — Final
Joseph Jabour
10/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Jabour
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
10/09/2025
Special inspection requirement — Insulation placement and R values
Joseph Jabour
10/09/2025
Special inspection requirement — Fenestration areas
Joseph Jabour
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
10/09/2025
Special inspection requirement — Interior lighting power
Joseph Jabour
10/09/2025
Special inspection requirement — Lighting controls
Joseph Jabour
10/09/2025
Special inspection requirement — Vestibules
Joseph Jabour
10/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Joseph Jabour
10/09/2025
Special inspection requirement — Exterior lighting power
Joseph Jabour
10/09/2025
Special inspection requirement — Air barrier - visual inspection
Joseph Jabour
10/09/2025
Special inspection requirement — Fenestration air leakage
Joseph Jabour
10/09/2025
Special inspection requirement — Permanent certificate
Joseph Jabour
10/08/2025
Filed — Alteration
INT ALT OF EX BANK AT 1ST FL & MEZZ. NEW PARTITIONS, COUNTERS/CABS/MILL/FINISHES. NEW SUSP CEILING. NEW TOILETS & LOUNGE. REFURBISH EX MEZZ. NEW FIRE-RATED EXT STOREFRONT GLAZING SYSTEM AT N&E FACADES. NEW EXT FINISHES & AWNING. NO CHANGE USE/OCC/EGRESS.
Q01164462-P1
09/23/2025
Signed off — Alteration
Modifications to existing Mechanical System in Commercial Bank. Replacement of existing rooftop Mechanical Unit. Installation of new Condensing Unit and Air Handlers (1st/Cellar). Misc ductwork, piping and controls. No change in use, occupancy or egress.
Q01164481-I1
09/22/2025
Signed off — Alteration
STRUCTURAL MODIFICATIONS ASSOCIATED WITH THE ALTERATION TO THE EXISTING COMMERCIAL BANK AS PER DRAWINGS, INCLUDING NEW STOREFRONT AND GLAZED AREAS, NEW ROOFTOP DUNNAGE. PIER REINFORCEMENT IN CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01166906-I1
08/28/2025
Special inspection requirement — Duct leakage testing, insulation and design
Joseph Jabour
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
08/28/2025
Special inspection requirement — Mechanical Systems
Joseph Jabour
08/28/2025
Special inspection requirement — Final
Joseph Jabour
08/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
08/28/2025
Special inspection requirement — Maintenance information
Joseph Jabour
08/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
08/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Jabour
08/28/2025
Special inspection requirement — Shutoff dampers
Joseph Jabour
08/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
08/27/2025
Filed — Alteration
Modifications to existing Mechanical System in Commercial Bank. Replacement of existing rooftop Mechanical Unit. Installation of new Condensing Unit and Air Handlers (1st/Cellar). Misc ductwork, piping and controls. No change in use, occupancy or egress.
Q01164481-P1
08/22/2025
Signed off — Alteration
FILING MADE FOR THE INTERIOR RENOVATION TO THE EXISTING COMMERCIAL BANK ON THE FIRST FLOOR AND MEZZANINE LEVEL. REMOVE EXISTING PARTITIONS, CEILING, AND FINISHES AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01102456-I1
08/20/2025
Filed — Alteration
MODIFICATIONS TO THE EX PLUMBING SYSTEM AT THE EX COMMERCIAL BANK. NEW TOILETS AND EMPLOYEE LOUNGE AT 1ST FLOOR. NEW ROOF DRAINS. NEW GAS CONNECTION TO ROOFTOP MECHANICAL UNIT. MODIFICATIONS TO EX PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01164475-P1
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
07/28/2025
Special inspection requirement — Mechanical Systems
Joseph Jabour
07/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
07/28/2025
Special inspection requirement — Final
Joseph Jabour
07/28/2025
Special inspection requirement — Duct leakage testing, insulation and design
Joseph Jabour
07/24/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/14/2025
Permit issued — Sign
Q01245135-I1-SG
07/11/2025
Permit issued — Sign
Q01245140-I1-SG
07/08/2025
Filed — Alteration
Q01245135-I1
07/08/2025
Filed — Alteration
ERECT ACCECSSORY BUSINESS WALL SIGN FOR MASPETH FEDERAL SAVINGS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01245140-I1
06/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2025
Filed — Alteration
STRUCTURAL MODIFICATIONS ASSOCIATED WITH THE ALTERATION TO THE EXISTING COMMERCIAL BANK AS PER DRAWINGS, INCLUDING NEW STOREFRONT AND GLAZED AREAS, NEW ROOFTOP DUNNAGE. PIER REINFORCEMENT IN CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01166906-P1
04/08/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01131919-S1
04/08/2025
Permit issued — Construction Fence
Q01131919-S1-FN
03/18/2025
Permit issued — Plumbing
Q01164475-I1-PL
03/14/2025
Permit issued — Structural
Q01166906-I1-ST
03/07/2025
Permit issued — Mechanical Systems
Q01164481-I1-MS
02/28/2025
Objection resolved — Addressed
02/28/2025
Objection resolved — Addressed
02/28/2025
Objection resolved — Addressed
02/28/2025
Objection resolved — Addressed
02/28/2025
Objection resolved — Addressed
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC07/14/2025
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC07/11/2025
DOB NOWConstruction FenceSigned-offAKM CONSTRUCTION NY04/08/2025
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY03/18/2025
DOB NOWStructuralSigned-offHM HUGHES CO INC03/14/2025
DOB NOWMechanical SystemsSigned-offHM HUGHES CO INC03/07/2025
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC02/10/2025
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY10/28/2024
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC09/23/2024
BISEQISSUEDVEZANDIO CONTRACTING CORP09/04/2015
BISMHISSUEDNEW YORK COMMUNITY BANCOR09/20/2013
BISMHISSUEDKEW FOREST PL.& HTG.INC01/31/2011
BIS—ISSUEDSERVICE SIGN ERECTORS10/12/1993
BIS—ISSUEDSERVICE SIGN ERECTORS10/12/1993
BIS—ISSUEDSERVICE SIGN ERECTORS09/30/1993
BISEQISSUEDBIORDI INC05/26/1993
BISEQISSUEDSPRING ENTERPRISE05/05/1993
BISOTISSUEDBIORDI INC04/27/1993
2 projects · most recent 03/25/2025
General Wiring
FiledStatusContractorScope
03/25/2025CompleteGLEN OAKS ELEC'L INC.General Wiring
10/23/2024CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/24/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
10/09/2025FinalJoseph Jabourprogress
10/09/2025Fire-Resistance Rated ConstructionJoseph Jabourprogress
10/09/2025Energy Code Compliance InspectionsJoseph Jabourprogress
10/09/2025Insulation placement and R valuesJoseph Jabourenergy_progress
10/09/2025Fenestration areasJoseph Jabourenergy_progress
10/09/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
10/09/2025Interior lighting powerJoseph Jabourenergy_progress
10/09/2025Lighting controlsJoseph Jabourenergy_progress
10/09/2025VestibulesJoseph Jabourenergy_progress
10/09/2025Fenestration and door U-factor and product ratingsJoseph Jabourenergy_progress
10/09/2025Exterior lighting powerJoseph Jabourenergy_progress
10/09/2025Air barrier - visual inspectionJoseph Jabourenergy_progress
10/09/2025Fenestration air leakageJoseph Jabourenergy_progress
10/09/2025Permanent certificateJoseph Jabourenergy_progress
08/28/2025Duct leakage testing, insulation and designJoseph Jabourenergy_progress
08/28/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
08/28/2025Mechanical SystemsJoseph Jabourspecial
08/28/2025FinalJoseph Jabourprogress
08/28/2025Energy Code Compliance InspectionsJoseph Jabourprogress
08/28/2025Maintenance informationJoseph Jabourenergy_progress
08/28/2025HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
08/28/2025HVAC-R and service water heating system controlsJoseph Jabourenergy_progress
08/28/2025Shutoff dampersJoseph Jabourenergy_progress
08/28/2025HVAC-R and service water heating equipmentJoseph Jabourenergy_progress
07/28/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
Latest 25 of 38.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026Q01102456-I1Request digital key ↗
08/21/2026Q01102456-P1Request digital key ↗
08/21/2026Q01164462-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
09/03/2015440249241Open ↗
09/24/2013420861240Open ↗
02/01/2011420298270Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
09/03/2015440249241Open ↗
07/11/2013420861240Open ↗
12/21/2010420298270Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/21/2026Q01102456-I1Open ↗
08/21/2026Q01164462-P1Open ↗
08/21/2026Q01164462-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/28/2026Q01164462-I1Open ↗
09/28/2026Q01164462-I1Open ↗
09/12/2026Q01164481-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
10/24/2013420861240Open ↗
04/05/2011420298270Open ↗
12/21/2010420298270Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026Q01164462-I1Open ↗
09/12/2026Q01164481-P1Open ↗
08/29/2026Q01164475-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/03/2015440249241Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/03/2015440249241Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/03/2015440249241Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE APPLICATION-PERMIT4
07/11/2013420861240Open ↗
12/21/2010420298270Open ↗
10/24/2013420861240Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/28/2013420861240Open ↗
07/01/2011420298270Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/21/2010420298270Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/21/2026Q01102456-I1Open ↗
08/21/2026Q01164462-I1Open ↗
08/21/2026Q01164462-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/21/2010420298270Open ↗
▸Energy Compliance4
▸BISTR8: Energy Code Progress Inspections2
09/24/2013420861240Open ↗
07/11/2013420861240Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/24/2013420861240Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/24/2013420861240Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/03/2015440249241Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS2
07/11/2013420861240Open ↗
12/21/2010420298270Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
10/24/2013420861240Open ↗
04/05/2011420298270Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/05/2011420298270Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/24/2013420861240Open ↗
07/11/2013420861240Open ↗
04/05/2011420298270Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
09/03/2015440249241Open ↗
▸BISADDITIONAL INFORMATION1
09/16/2015440249241Open ↗
▸BISEFILING COVER SHEET1
07/11/2013420861240Open ↗