← Back
Two family converted from one family
31-49 102 STREET
QUEENS · BIN 4041786
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R4-1Zoning
1,360 sfGross Floor Area
2Units
Two family converted from one family · 1,885 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2025$810K—— → —$596/sf building
04/25/2024$608K—— → —$447/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSS ENGINEERS107/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSS ENGINEERS4492107/27/2026
Building Lifecycle
All (10)Filed (1)Special Inspection (9)
07/27/2026
Filed — Alteration
THIS PROJECT INVOLVES THE INSTALLATION OF 1 HVAC SYSTEM SERVING THE CELLAR AND FIRST FLOORS ONLY. THE MAIN SYSTEM IS A SPLIT DIRECT FIRED HIGH EFFICIENCY FURNACE WITH AN AC COIL AND CONDENSOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01431525-I1
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/23/2026
Special inspection requirement — Maintenance information
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
07/15/2026
Special inspection requirement — Final
bassam (sam) rimawi
07/15/2026
Special inspection requirement — Heating Systems
bassam (sam) rimawi
07/15/2026
Special inspection requirement — Mechanical Systems
bassam (sam) rimawi
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
Nothing on file for this building.
1 project · most recent 07/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/27/2026——Heating and Air Conditioning Systems
Heat / Cool
Carrier 59SC2E-080m21-20 80,000 CFM · Furnace ×1
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/23/2026HVAC-R and service water heating system controls—energy_progress
07/23/2026Maintenance information—energy_progress
07/23/2026HVAC-R and service water piping design and insulation—energy_progress
07/23/2026HVAC-R and service water heating equipment—energy_progress
07/23/2026Energy Code Compliance Inspections—progress
07/15/2026Finalbassam (sam) rimawiprogress
07/15/2026Heating Systemsbassam (sam) rimawispecial
07/15/2026Mechanical Systemsbassam (sam) rimawispecial
07/15/2026Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01431525-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026Q01431525-I1Open ↗
08/23/2026Q01431525-I1Open ↗
08/23/2026Q01431525-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01431525-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01431525-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01431525-I1Open ↗