ECB03/18/2025Electrical work without a permit, atoi observed 2 new electrical transfer box installed at exp 2 to power to a/c unit. Electrical system was installed without a permit or documentation on file with the departmeNothing owed — awaiting certificate of correction
Three families · 3,250 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.