← Back
Predominantly retail with other uses
31-53 STEINWAY STREET
QUEENS · Astoria (East)-Woodside (North) · BIN 4011106
💬 Discuss this project
1930Year Built
3Stories
K4Building Class
C4-2AZoning
6,822 sfGross Floor Area
4Units
7 Open Violations ▸
Predominantly retail with other uses · Owner of record: STEINWAY 31 LLC · 2,490 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIELDS MELVYN PARTNER BOU103/22/2026
BOULEVARD REALTY COMP103/22/2026
BOULEVARD REALTY1903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SCADUTO ARCHITECT103/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAST INTERIORS CONSULTINGGeneral Contractor303/21/2026
FRIED ELECTRIC CO.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL SCADUTO ARCHITECT4833103/19/2025
Building Lifecycle
All (33)Filed (1)Permit Issued (1)Signed Off (1)Violation (15)Inspection (2)Objection (2)Special Inspection (11)
06/09/2025
Signed off — Alteration
minor interior demolition and partition work to split previously joined storefront back into separate spaces, remove ex. HVAC and replace with new mini-split HPs at 31-53 side. No change to use, egress, or occupancy.
Q01195917-I1
06/06/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/12/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/11/2025
Permit issued — General Construction
Q01195917-I1-GC-CX
04/07/2025
Objection resolved — Addressed
03/25/2025
Objection raised — Other
03/19/2025
Filed — Alteration
minor interior demolition and partition work to split previously joined storefront back into separate spaces, remove ex. HVAC and replace with new mini-split HPs at 31-53 side. No change to use, egress, or occupancy.
Q01195917-I1
03/17/2025
Special inspection requirement — Mechanical Systems
Michael Scaduto
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Scaduto
03/17/2025
Special inspection requirement — Heating Systems
Michael Scaduto
03/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
03/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Michael Scaduto
03/17/2025
Special inspection requirement — Final
Michael Scaduto
03/17/2025
Special inspection requirement — Air barrier - visual inspection
Michael Scaduto
03/17/2025
Special inspection requirement — Maintenance information
Michael Scaduto
03/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Scaduto
03/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Scaduto
03/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Michael Scaduto
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2007
Violation issued (HPD, open)
B
09/27/2007
Violation issued (ECB, closed)
Construction
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2002
Violation issued (ECB, closed)
Construction
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/1989
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKAST INTERIORS CONSULTING04/11/2025
BIS—ISSUEDBERGER SIGNS INC.09/24/2007
BISMHISSUEDMASKEIL & SON INC07/17/2007
BISPLISSUEDSCHUMACHER & FARLEY P&H C06/04/2007
BISOTISSUEDMASKIELL & SON, INC06/01/2007
BISEQISSUEDNEW VISION ENTERPRISES INC.05/15/2007
BISEQISSUEDNEW VISION ENTERPRISES INC05/07/2007
BISOTISSUEDMASKEILL & SONS INC04/23/2007
BISEQISSUEDNEW VISON ENTERPRISES INC08/03/2006
BISEQISSUEDNEW VISION ENTERPRISES INC04/28/2006
BISOTISSUEDMASKIELL & SONS, INC04/10/2006
BISEQISSUEDNEW VISION ENTERPRISES INC01/09/2006
BISOTISSUEDPARKER SERVICE INDUSTRIES09/30/2002
BISPLISSUEDRICHMOND P & H CO., INC04/11/2002
BISMHISSUEDRETAIL PLANNING03/22/2002
BISEQISSUEDRETAIL PLANNING03/22/2002
BISMHISSUEDOWNER02/18/1993
BIS—ISSUEDSILVERESCENT SIGN CO INC.01/10/1992
BISPLISSUEDDUO PLUMBING & HTG CORP.11/18/1991
BISOTISSUEDRETAIL CONST. SERVICES , INC11/14/1991
BISMHISSUEDRETAIL CONST. SERVICES , INC11/14/1991
BISEQISSUEDRETAIL CONST. SERVICES , INC11/14/1991
BIS—ISSUEDN/A10/18/1991
2 projects · most recent 04/26/2025
General Wiring
FiledStatusContractorScope
04/26/2025CompleteFRIED ELECTRIC CO.General Wiring
01/27/2021CompleteGEMINI ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/06/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
03/17/2025Mechanical SystemsMichael Scadutospecial
03/17/2025Fire-Resistant Penetrations and JointsMichael Scadutospecial
03/17/2025Heating SystemsMichael Scadutospecial
03/17/2025Energy Code Compliance InspectionsMichael Scadutoprogress
03/17/2025Fire-Resistance Rated ConstructionMichael Scadutoprogress
03/17/2025FinalMichael Scadutoprogress
03/17/2025Air barrier - visual inspectionMichael Scadutoenergy_progress
03/17/2025Maintenance informationMichael Scadutoenergy_progress
03/17/2025HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
03/17/2025HVAC-R and service water heating system controlsMichael Scadutoenergy_progress
03/17/2025HVAC-R and service water heating equipmentMichael Scadutoenergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01195917-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q01195917-I1Open ↗
08/29/2026Q01195917-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01195917-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026Q01195917-I1Open ↗