← Back
Primarily 5-6 family with 1 store or office
31-57 STEINWAY STREET
QUEENS · Astoria (East)-Woodside (North) · BIN 4011104
💬 Discuss this project
1925Year Built
4Stories
S5Building Class
C4-2AZoning
6,025 sfGross Floor Area
7Units
Rent Stabilized5 Open Violations ▸
Primarily 5-6 family with 1 store or office · Owner of record: SLW SUN LLC · 2,250 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 18p · 1 filing · 20 docs
Cellar14p · 2 filings · 20 docs
Site & exterior2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEINWAY PROPERTY NY307/08/2026
SLW SUN LLC203/22/2026
S P S NY CONSTRUCTION203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2023$2.3M—— → —$388/sf building
06/05/2020$1.9M—Private party → STEINWAY PROPERTY NY LLC$318/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG ENGINEERING PLLC612/19/2025
ALBERT ARONOV ARCHITECT706/11/2023
ALLEN SHINFELD, P.E. PLLC103/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCX DESIGN803/21/2026
YOUN DESIGN CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GIM CONSTRUCTION INCGeneral Contractor307/08/2026
RONG MAINTENANCE INCGeneral Contractor303/21/2026
XH&RC PLBG AND HTG INCPlumbing307/08/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG ENGINEERING PLLC8512512/19/2025
ALBERT ARONOV772606/11/2023
Building Lifecycle
All (94)Filed (14)Permit Issued (8)Signed Off (7)Violation (28)Inspection (7)Special Inspection (30)
05/07/2026
Violation issued (HPD, closed)
A
03/30/2026
Signed off — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-S1
03/30/2026
Signed off — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-S2
03/30/2026
Signed off — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-I1
01/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIAO ZHENG
12/22/2025
Special inspection requirement — Heating Systems
XIAO ZHENG
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAO ZHENG
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAO ZHENG
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
12/22/2025
Special inspection requirement — Maintenance information
XIAO ZHENG
12/19/2025
Filed — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-P3
12/18/2025
Special inspection requirement — Heating Systems
XIAO ZHENG
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAO ZHENG
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAO ZHENG
12/18/2025
Special inspection requirement — Maintenance information
XIAO ZHENG
12/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/04/2025
Permit issued — Boiler Equipment
Q01081098-S2-BE
12/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/06/2025
Permit issued — Plumbing
Q01081098-S1-PL
09/24/2025
Filed — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-S2
06/12/2025
Violation issued (HPD, closed)
A
12/02/2024
Violation issued (HPD, closed)
I
10/09/2024
Permit issued — Plumbing
Q01081098-S1-PL
09/18/2024
Filed — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-P2
09/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
09/17/2024
Special inspection requirement — Final
XIAO ZHENG
09/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
XIAO ZHENG
09/16/2024
Filed — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-P1
09/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/06/2024
Special inspection requirement — Maintenance information
XIAO ZHENG
09/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIAO ZHENG
09/06/2024
Special inspection requirement — Final
XIAO ZHENG
09/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
09/06/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
09/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
09/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIAO ZHENG
08/09/2024
Permit issued — General Construction
Q01081098-I1-GC
08/07/2024
Filed — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-S1
08/07/2024
Filed — Alteration
TO INSTALL ONE NEW GAS BOILER, REPLACING THE EXISTING OIL BOILER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01081098-I1
04/16/2024
Violation issued (HPD, closed)
A
11/24/2023
Violation issued (HPD, closed)
I
06/30/2023
Signed off — Alteration
Interior renovation of existing first floor commercial space: new partitions, doors, finishes, and replace storefront.
Q08020932-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2023
Signed off — Alteration
Interior renovation of existing first floor commercial space: new partitions, doors, finishes, and replace storefront.
Q08020932-S1
06/11/2023
Filed — Alteration
Interior renovation of existing first floor commercial space: new partitions, doors, finishes, and replace storefront.
Q08020932-P3
05/08/2023
Signed off — Alteration
Interior renovation of existing first floor commercial space: new partitions, doors, finishes, and replace storefront.
Q08020932-S2
04/28/2023
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00844969-I1
04/14/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
04/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2023
Permit issued — Sign
Q00844969-I1-SG
03/17/2023
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00844969-I1
01/27/2023
Filed — Alteration
Interior renovation of existing first floor commercial space: new partitions, doors, finishes, and replace storefront.
Q08020932-P2
01/27/2023
Filed — Alteration
Interior renovation of existing first floor commercial space: new partitions, doors, finishes, and replace storefront.
Q08020932-P1
01/27/2023
Special inspection requirement — Interior lighting power
Albert Aronov
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offXH&RC PLBG AND HTG INC12/04/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC11/06/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC10/09/2024
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC08/09/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC03/31/2023
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP01/11/2023
DOB NOWMechanical SystemsSigned-offRICHTER + RATNER BUILDERS11/10/2022
DOB NOWGeneral ConstructionSigned-offRICHTER + RATNER BUILDERS11/09/2022
BISOTISSUEDOLD J & J RESTORATION CORP10/21/2011
BISEQISSUEDS.P.S. NY CONSTRUCTION CO10/14/2011
BISBLISSUEDDUAL FUEL PLUMBING AND HEATING04/30/1999
1 project · most recent 06/11/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/11/2023Signed-offGIM CONSTRUCTION INCAir Conditioning Systems
Cooling
Mitsubishi Electric SEZ-KD09NA4 9,000 BTU · Ahu ×4
MXZ-5C42NA3 42,000 BTU · Heat Pump Outdoor ×1
PEAD-A24AA8 24,000 BTU · Ahu ×1
SUZ-KA24NHA2 24,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 06/11/2023
Water/Sanitary
FiledStatusContractorScope
06/11/2023Signed-offFOUR POINTS P & H CORPWater/Sanitary
2 projects · most recent 04/24/2023
General Wiring
FiledStatusContractorScope
04/24/2023CompleteLENS ELECTRIC, INCGeneral Wiring
03/12/2023CompleteJONG HYUN KIM—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/14/2023Pass-Final Sign Permit InspectionPassView ↗
04/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/22/2025Tenant Protection Plan ComplianceXIAO ZHENGspecial
12/22/2025Heating SystemsXIAO ZHENGspecial
12/22/2025HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
12/22/2025HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
12/22/2025HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
12/22/2025Maintenance informationXIAO ZHENGenergy_progress
12/18/2025Heating SystemsXIAO ZHENGspecial
12/18/2025Tenant Protection Plan Compliance—special
12/18/2025HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
12/18/2025HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
12/18/2025HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
12/18/2025Maintenance informationXIAO ZHENGenergy_progress
09/17/2024Fire-Resistance Rated ConstructionXIAO ZHENGprogress
09/17/2024FinalXIAO ZHENGprogress
09/17/2024Tenant Protection Plan ComplianceXIAO ZHENGspecial
09/12/2024Tenant Protection Plan Compliance—special
09/12/2024Tenant Protection Plan Compliance—special
09/06/2024Maintenance informationXIAO ZHENGenergy_progress
09/06/2024HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
09/06/2024FinalXIAO ZHENGprogress
09/06/2024Fire-Resistance Rated ConstructionXIAO ZHENGprogress
09/06/2024Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
09/06/2024Energy Code Compliance InspectionsXIAO ZHENGprogress
09/06/2024HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
09/06/2024HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
Latest 25 of 34.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/25/2026Q00844969-I1Request digital key ↗
08/24/2026Q08020932-P1Request digital key ↗
08/24/2026Q08020932-P3Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
10/22/2011420490828Open ↗
10/18/2011420493157Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/22/2011420490828Open ↗
10/17/2011420493157Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/24/2026Q08020932-P3Open ↗
08/24/2026Q08020932-P2Open ↗
08/24/2026Q08020932-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/25/2026Q01081098-P1Open ↗
09/23/2026Q01081098-S2Open ↗
09/01/2026Q08020932-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q01081098-S2Open ↗
09/23/2026Q01081098-S2Open ↗
09/01/2026Q08020932-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/12/2011420493157Open ↗
10/22/2011420490828Open ↗
10/17/2011420493157Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/22/2011420490828Open ↗
10/17/2011420493157Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/22/2011420490828Open ↗
10/17/2011420493157Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/24/2026Q08020932-P3Open ↗
08/24/2026Q08020932-P2Open ↗
08/24/2026Q08020932-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/22/2011420490828Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
10/22/2011420490828Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/12/2011420493157Open ↗
10/17/2011420493157Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/22/2011420490828Open ↗
10/17/2011420493157Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/12/2011420493157Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/22/2011420490828Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/22/2011420490828Open ↗
10/17/2011420493157Open ↗