← Back
Elevator apt, fireproof without stores
31-59 VERNON BOULEVARD
QUEENS · BIN 4441174
💬 Discuss this project
2024Year Built
—Stories
D3Building Class
R7AZoning
40,301 sfGross Floor Area
51Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 1111 BWAY LLC · 9,960 sf lot · 4.05 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof7p · 5 filings · 20 docs
Floor 86p · 4 filings · 20 docs
Floor 74p · 4 filings · 20 docs
Floor 67p · 5 filings · 20 docs
Floor 56p · 5 filings · 20 docs
Floor 46p · 5 filings · 20 docs
Floor 36p · 5 filings · 20 docs
Floor 26p · 5 filings · 20 docs
Floor 15p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC TOP CONSTRUCTION6807/08/2026
OWNERS REP2207/08/2026
DESIGN SAFETY INC N/A503/22/2026
SUPERB CONSTRUCTION MGT103/22/2026
31-61 VERNON BLVD603/21/2026
31-59 VERNON BOULEVARD303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THE GREEN STUDIO403/21/2026
EXPRESS FILING INC2203/21/2026
AE DESIGN SOLUTION603/21/2026
MILLENNIUM DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC TOP CONSTRUCTION LLCGeneral Contractor3607/08/2026
GWT ENTERPRISES INCGeneral Contractor903/21/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor707/08/2026
PRIME PIPING & HEATING INFire Protection307/08/2026
N TECH DESIGN OF AMERICAGeneral Contractor303/21/2026
DESIGN N SAFETY INCGeneral Contractor107/08/2026
SUPERB CONSTRUCTION MGTGeneral Contractor107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616908/21/2024
STROH ENGINEERING SERVICE3316107/20/2022
Building Lifecycle
All (139)Filed (19)Permit Issued (29)Signed Off (13)Violation (14)Inspection (13)Objection (18)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
05/07/2025
Signed off — Alteration
structural specifications filed in conjunction with NB application #421133160
Q00456114-I1
02/18/2025
Signed off — Alteration
TEMPORARY STANDPIPE FILED IN CONJUNCTION WITH NB JOB #421133160
Q00528473-I1
02/18/2025
Signed off — Alteration
Q00424397-I1
02/10/2025
Signed off — Alteration
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #421133160
Q00424299-S1
02/10/2025
Signed off — Alteration
Q00456009-I1
12/26/2024
Signed off — Alteration
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #421133160
Q00424299-I1
12/13/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/09/2024
Signed off — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION # 421133160
Q00423898-I1
12/04/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
12/04/2024
Special inspection requirement — Final
FAHAD FATEH
12/04/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
12/04/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
12/04/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
12/04/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
12/04/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
12/04/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/25/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
11/19/2024
Filed — Alteration
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #421133160
Q00424299-P1
11/12/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/04/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/04/2024
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
11/04/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
11/04/2024
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
10/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/30/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/13/2024
Signed off — Alteration
Q00456034-I1
09/13/2024
Signed off — Alteration
Q00444188-I1
09/13/2024
Permit issued — Mechanical Systems
Q00424299-I1-MS
09/11/2024
Signed off — Alteration
Q01026029-I1
09/11/2024
Signed off — Alteration
Q00987542-I1
09/05/2024
421-a(16) registration filed
08/27/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
08/27/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
08/27/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/27/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/27/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/22/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00719072-I1
08/21/2024
Filed — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION # 421133160
Q00423898-P1
08/15/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
08/15/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/15/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/15/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
08/15/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
07/01/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
06/22/2024
Violation issued (ECB, closed)
Construction
06/03/2024
Filed — Alteration
Q00987542-P1
06/03/2024
Filed — Alteration
Q01026029-P1
05/30/2024
Violation issued (ECB, closed)
Unknown
05/30/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Violation issued (ECB, closed)
Plumbing
05/30/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Violation issued (ECB, closed)
Unknown
05/30/2024
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
05/30/2024
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
05/03/2024
Permit issued — Protection and Mechanical Methods
Q00987542-I1-PMM
05/02/2024
Filed — Alteration
Q00987542-I1
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNYC TOP CONSTRUCTION LLC09/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC05/03/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/09/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC03/29/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC03/29/2024
DOB NOWEarth WorkSigned-offNYC TOP CONSTRUCTION LLC11/30/2023
DOB NOWStructuralSigned-offNYC TOP CONSTRUCTION LLC11/21/2023
DOB NOWSupport of ExcavationSigned-offNYC TOP CONSTRUCTION LLC11/15/2023
DOB NOWConstruction FenceSigned-offNYC TOP CONSTRUCTION LLC11/09/2023
DOB NOWFoundationSigned-offNYC TOP CONSTRUCTION LLC11/08/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC08/28/2023
DOB NOWEarth WorkSigned-offNYC TOP CONSTRUCTION LLC07/14/2023
DOB NOWPlumbingSigned-offYG SERVICES INC06/02/2023
DOB NOWFoundationSigned-offNYC TOP CONSTRUCTION LLC05/18/2023
DOB NOWStructuralSigned-offNYC TOP CONSTRUCTION LLC05/18/2023
DOB NOWSupport of ExcavationSigned-offNYC TOP CONSTRUCTION LLC05/11/2023
DOB NOWFoundationSigned-offNYC TOP CONSTRUCTION LLC05/08/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/10/2023
DOB NOWConstruction FenceSigned-offNYC TOP CONSTRUCTION LLC01/05/2023
DOB NOWConstruction FenceSigned-offNYC TOP CONSTRUCTION LLC11/16/2022
DOB NOWStandpipeSigned-offA M B MECHANICAL INC09/23/2022
DOB NOWStandpipeSigned-offA M B MECHANICAL INC09/23/2022
DOB NOWFoundationSigned-offNYC TOP CONSTRUCTION LLC09/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offDESIGN N SAFETY INC09/01/2022
DOB NOWConstruction FenceSigned-offNYC TOP CONSTRUCTION LLC06/21/2022
DOB NOWFoundationSigned-offNYC TOP CONSTRUCTION LLC05/31/2022
DOB NOWConstruction FenceSigned-offN TECH DESIGN OF AMERICA05/05/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/15/2022
DOB NOWConstruction FenceSigned-offSUPERB CONSTRUCTION MGT02/28/2022
BIS—ISSUEDNYC TOP CONSTRUCTION LLC11/25/2024
BIS—ISSUEDNYC TOP CONSTRUCTION LLC04/17/2024
BIS—ISSUEDNYC TOP CONSTRUCTION LLC05/04/2023
BIS—ISSUEDNYC TOP CONSTRUCTION LLC12/01/2022
BIS—ISSUEDDESIGN N SAFETY INC08/26/2022
BIS—ISSUEDDESIGN N SAFETY INC06/02/2022
BIS—ISSUEDSUPERB CONSTRUCTION MGT03/04/2022
5 projects · most recent 11/06/2024
General Wiring
FiledStatusContractorScope
11/06/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
05/25/2023CompleteSOLAS ELECTRICAL CORP—
02/16/2023CompleteS&R ELECTRICAL & MECHANIC—
12/05/2022CompleteSTAR ELEC'L CONTRACTORS C—
04/24/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/25/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/12/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/04/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
11/04/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/04/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
10/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/30/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/01/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/30/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/30/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
02/02/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
12/04/2024Maintenance informationFAHAD FATEHenergy_progress
12/04/2024FinalFAHAD FATEHprogress
12/04/2024Heating SystemsFAHAD FATEHspecial
12/04/2024Mechanical SystemsFAHAD FATEHspecial
12/04/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
12/04/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
12/04/2024Shutoff dampersFAHAD FATEHenergy_progress
12/04/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
12/04/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/27/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
08/27/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
08/27/2024Maintenance informationFAHAD FATEHenergy_progress
08/27/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
08/27/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/27/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/15/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
08/15/2024Maintenance informationFAHAD FATEHenergy_progress
08/15/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/15/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/15/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
08/15/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
05/05/2022Footing and FoundationFAHAD FATEHprogress
05/05/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/05/2022FinalFAHAD FATEHprogress
01/18/2021FinalFAHAD FATEHprogress
Latest 25 of 33.
▾Documents — 261 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch10
08/26/2026Q00719072-I1Request digital key ↗
08/26/2026Q00719072-P2Request digital key ↗
08/26/2026Q00719072-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/21/2026Q00423898-I1Request digital key ↗
08/21/2026Q00423898-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026Q00424299-P1Request digital key ↗
08/15/2026Q00424299-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
08/27/2026Q00456009-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00444188-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation1
08/27/2026Q00456034-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/27/2026Q00424397-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/27/2026Q00456114-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/27/2026Q00424397-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
01/27/2026421133160Open ↗
01/23/2026421133160Open ↗
02/28/2025421133160Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
05/27/2025421133160Open ↗
07/18/2023421133160Open ↗
01/10/2023421133160Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE COMPLIANCE2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISZONING DIAGRAM1
05/11/2021421133160Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026Q00424397-I1Open ↗
08/27/2026Q00456114-I1Open ↗
08/27/2026Q00456009-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00423898-P1Open ↗
09/01/2026Q00423898-P1Open ↗
08/29/2026Q00456009-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00456034-I1Open ↗
09/01/2026Q00423898-P1Open ↗
08/29/2026Q00456009-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/10/2023421133160Open ↗
11/10/2018421677493Open ↗
▸Trade Schedules & Equipment9
▸BISHEATING SYSTEMS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISSPRINKLER SYSTEMS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISSEWER CUT-OFF1
06/06/2022421677493Open ↗
▸Safety & Tenant Protection15
▸BISSTREET TREE CHECKLIST4
05/11/2021421133160Open ↗
01/21/2021440641129Open ↗
12/09/2020440641129Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
01/10/2023421133160Open ↗
10/21/2022421677493Open ↗
07/29/2022421677493Open ↗
Showing 3 of 4 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
06/06/2022421677493Open ↗
11/10/2018421677493Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/06/2022421677493Open ↗
11/10/2018421677493Open ↗
▸BISSTREET TREES SITE PLAN1
09/05/2024421133160Open ↗
▸Environmental & Asbestos19
▸DOB NOWOER: Notice to Proceed10
08/15/2026Q00424299-I1Open ↗
08/13/2026Q00456034-I1Open ↗
08/13/2026Q00456114-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026Q00456114-I1Open ↗
08/13/2026Q00423898-I1Open ↗
08/13/2026Q00456009-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
09/19/2025440641129Open ↗
05/09/2025421133160Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
04/20/2021421133160Open ↗
12/03/2020440641129Open ↗
▸Energy Compliance29
▸BISEXTERIOR LIGHTING POWER2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISFENESTRATION AIR LEAKAGE2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISINTERIOR LIGHTING POWER2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISFENESTRATION AREAS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISAIR SEALING AND INSULATION - TESTING2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISLIGHTING IN DWELLING UNITS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISELECTRIC MOTORS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISLIGHTING CONTROLS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00424299-I1Open ↗
08/13/2026Q00423898-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/10/2023421133160Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/01/2021421133160Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00424299-I1Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
01/10/2023421133160Open ↗
01/10/2023421133160Open ↗
01/10/2023421133160Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/12/2021421133160Open ↗
05/12/2021421133160Open ↗
05/11/2021421133160Open ↗
▸BISMECHANICAL SYSTEMS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISMASONRY2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISPOST-INSTALLED ANCHORS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/20/2024421133160Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION9
07/18/2023421133160Open ↗
10/21/2022421677493Open ↗
10/21/2022421677493Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
01/27/2026421133160Open ↗
01/23/2026421133160Open ↗
02/28/2025421133160Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership9
▸BISDEPT OF FINANCE VERIFICATION3
10/21/2022421677493Open ↗
07/29/2022421677493Open ↗
06/06/2022421677493Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
07/18/2023421133160Open ↗
10/21/2022421677493Open ↗
07/29/2022421677493Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
05/27/2025421133160Open ↗
01/10/2023421133160Open ↗
06/06/2022421677493Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION8
10/07/2024421133160Open ↗
10/07/2024421133160Open ↗
08/08/2024421133160Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
05/27/2025421133160Open ↗
07/18/2023421133160Open ↗
01/10/2023421133160Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
11/10/2018421677493Open ↗
▸Other Documents18
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISSHUTOFF DAMPERS2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISLOWEST FLOOR ELEVATION2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISMAINTENANCE INFORMATION2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
12/30/2024421133160Open ↗
12/30/2024421133160Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM2
01/02/2025421133160Open ↗
01/02/2025421133160Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00424299-S1Open ↗
08/13/2026Q00456034-I1Open ↗