← Back
Two family converted from one family
31-72 30 STREET
QUEENS · BIN 4007505
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R6BZoning
2,165 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: 3172 30TH ST LLC · 5,344 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 54p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HCN DESIGN808/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N.Y. PREFERRED DEVELOPMENTGeneral Contractor109/25/2026
Building Lifecycle
All (62)Filed (8)Permit Issued (1)Objection (23)Special Inspection (30)
09/24/2026
Permit issued — Construction Fence
Q01448840-I1-FN
08/31/2026
Objection raised — Other
08/26/2026
Filed — Alteration
Erect temp construction fence as per plans
Q01448840-I1
08/13/2026
Filed — New Building
NEW 15 UNIT RESIDENTIAL MULTIPLE DWELLNG, 5 STORY BUILDING
Q01255929-S5
08/13/2026
Filed — New Building
NEW 15 UNIT RESIDENTIAL MULTIPLE DWELLNG, 5 STORY BUILDING
Q01255929-S4
08/12/2026
Filed — New Building
NEW 15 UNIT RESIDENTIAL MULTIPLE DWELLNG, 5 STORY BUILDING
Q01255929-S6
08/11/2026
Special inspection requirement — Post-installed Anchors
08/10/2026
Special inspection requirement — Post-installed Anchors
08/10/2026
Special inspection requirement — Subgrade Inspections
08/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/10/2026
Special inspection requirement — Concrete - Cast-In-Place
08/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/11/2026
Objection raised — Admin
06/11/2026
Objection raised — Zoning
05/21/2026
Filed — New Building
NEW 15 UNIT RESIDENTIAL MULTIPLE DWELLNG, 5 STORY BUILDING
Q01255929-S3
05/21/2026
Special inspection requirement — Electrical motors and elevators
05/21/2026
Special inspection requirement — Lighting controls
05/21/2026
Special inspection requirement — Exterior lighting power
05/21/2026
Special inspection requirement — Interior lighting power
05/21/2026
Special inspection requirement — Lighting in dwelling units
05/21/2026
Special inspection requirement — Metering
04/29/2026
Filed — New Building
NEW 15 UNIT RESIDENTIAL MULTIPLE DWELLNG, 5 STORY BUILDING
Q01255929-S2
04/20/2026
Filed — New Building
NEW 15 UNIT RESIDENTIAL MULTIPLE DWELLNG, 5 STORY BUILDING
Q01255929-S1
04/20/2026
Objection resolved — Addressed
04/20/2026
Special inspection requirement — Final
04/20/2026
Special inspection requirement — Concrete - Cast-In-Place
04/20/2026
Special inspection requirement — Final
04/20/2026
Special inspection requirement — Masonry
04/20/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/20/2026
Special inspection requirement — Structural Cold-Formed Steel
04/20/2026
Special inspection requirement — Footing and Foundation
04/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/18/2026
Special inspection requirement — Post-installed Anchors
04/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/18/2026
Special inspection requirement — Maintenance information
04/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/18/2026
Special inspection requirement — Shutoff dampers
04/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/08/2026
Objection raised — Admin
04/02/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
01/08/2026
Objection raised — Energy
01/08/2026
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
08/20/2025
Objection raised — Scope
08/20/2025
Objection raised — Zoning
08/20/2025
Objection raised — Plumbing
08/20/2025
Objection raised — Electrical
08/20/2025
Objection raised — Structural
08/20/2025
Objection raised — Zoning
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedN.Y. PREFERRED DEVELOPMENT09/24/2026
1 project · most recent 08/13/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/13/2026——Storm, Water/Sanitary
1 project · most recent 08/27/2026
FiledStatusContractorScope
08/27/2026Permit IssuedRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/11/2026Post-installed Anchors—special
08/10/2026Post-installed Anchors—special
08/10/2026Subgrade Inspections—special
08/10/2026Excavations - Sheeting, Shoring, and Bracing—special
08/10/2026Structural Stability – Alterations of existing buildings—special
08/10/2026Concrete - Cast-In-Place—special
08/10/2026Subsurface Investigations (Borings/Test Pits)—special
05/21/2026Electrical motors and elevators—energy_progress
05/21/2026Lighting controls—energy_progress
05/21/2026Exterior lighting power—energy_progress
05/21/2026Interior lighting power—energy_progress
05/21/2026Lighting in dwelling units—energy_progress
05/21/2026Metering—energy_progress
04/20/2026Final—progress
04/20/2026Concrete - Cast-In-Place—special
04/20/2026Final—progress
04/20/2026Masonry—special
04/20/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
04/20/2026Structural Cold-Formed Steel—special
04/20/2026Footing and Foundation—progress
04/18/2026HVAC-R and service water heating system controls—energy_progress
04/18/2026Fire-Resistant Penetrations and Joints—special
04/18/2026Post-installed Anchors—special
04/18/2026Fire-Resistant Penetrations and Joints—special
04/18/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 38.
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q01448840-I1Request digital key ↗
08/17/2026Q01255929-S5Request digital key ↗
08/17/2026Q01255929-S4Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q01448840-I1Open ↗
08/17/2026Q01255929-S4Open ↗
08/17/2026Q01255929-S3Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports1
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026Q01255929-S5Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01255929-I1Open ↗