← Back
Professional building / stand-alone funeral home
31-80 41 STREET
QUEENS · BIN 4011152
💬 Discuss this project
1969Year Built
2Stories
O7Building Class
R5Zoning
6,048 sfGross Floor Area
2Units
1 Open Violation ▸
Professional building / stand-alone funeral home · Owner of record: 41ST STREET ASTORIA CORP · 5,000 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO407/08/2026
CAL-TON MANAGEMENT LLC903/22/2026
41ST STREET ASTORIA CORP403/22/2026
NY WONDER CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLE PROPRIETOR106/20/2024
MJE PROFESSIONAL SERVICES106/07/2024
CL ENGINEERING P.C.511/05/2022
DAVI ARCHITECTURE, PC203/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SMN CONSULTING SERVICES203/21/2026
H J BUILDING CONSULTING1003/21/2026
LINE DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
EAST COAST BUILDERS & AS*General Contractor303/21/2026
STRUCTURELINE INCGeneral Contractor203/21/2026
JASCO, INCGeneral Contractor107/08/2026
KOSTARIDIS, ATHANASIOSElectrical103/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
OLYMPIA PLBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781511/05/2022
DAVI ARCHITECTURE, PC5168203/17/2021
Building Lifecycle
All (68)Filed (9)Permit Issued (6)Signed Off (5)Violation (10)Inspection (4)Objection (4)Special Inspection (30)
08/22/2024
Signed off — Alteration
Q01041738-I1
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
07/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/01/2024
Objection raised — Other
07/01/2024
Objection raised — Inspections
06/20/2024
Filed — Alteration
Facade repair works at front facade of building as per plan
Q01067314-I1
06/07/2024
Filed — Alteration
Q01041738-I1
06/07/2024
Permit issued — Sidewalk Shed
Q01041738-I1-SH
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/28/2022
Signed off — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-S1
11/28/2022
Signed off — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-I1
11/25/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/07/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Air barrier — testing
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Air barrier — testing
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
11/05/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-P3
11/05/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-P2
08/27/2022
Violation issued (ECB, closed)
Unknown
08/02/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-P1
06/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2022
Permit issued — General Construction
Q00688963-I1-GC
03/23/2022
Violation issued (ECB, closed)
Construction
03/17/2022
Signed off — Alteration
Q00476176-I1
03/17/2022
Violation issued (ECB, closed)
Construction
03/03/2022
Permit issued — Plumbing
Q00688963-S1-PL
03/02/2022
Permit issued — General Construction
Q00688963-I1-GC
03/01/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-S1
03/01/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-I1
12/15/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/14/2021
Permit issued — Plumbing
Q00476176-I1-PL
10/29/2021
Signed off — Alteration
Q00476185-I1
09/01/2021
Permit issued — General Construction
Q00476185-I1-GC
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJASCO, INC06/07/2024
DOB NOWGeneral ConstructionSigned-offSTRUCTURELINE INC05/21/2022
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC03/03/2022
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC03/02/2022
DOB NOWPlumbingSigned-offOLYMPIA PLBING & HTG CORP12/14/2021
DOB NOWGeneral ConstructionSigned-offEAST COAST BUILDERS & AS*09/01/2021
BISFPISSUEDIDEAL FIRE SYS INC03/02/2006
BISOTISSUEDCOOPER MECH.CORP.01/07/1994
BISPLISSUEDMARIO MORAMARCO INC01/07/1994
BISMHISSUEDHORIZON CONTRACTORS OF LIC04/22/1992
1 project · most recent 08/31/2022
General Wiring
FiledStatusContractorScope
08/31/2022Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/02/2024Structural Stability – Alterations of existing buildings—special
11/07/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/07/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
11/07/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
11/07/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
11/07/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/07/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
11/07/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
11/07/2022Air barrier — testing CHRISTIAN LOZADAenergy_progress
11/07/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
11/07/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/07/2022Lighting controlsCHRISTIAN LOZADAenergy_progress
11/07/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
11/07/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
11/07/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/07/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
11/07/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
11/06/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
11/06/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/06/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/06/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
11/06/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
11/06/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/06/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/06/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
Latest 25 of 47.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/26/2026Q00688963-S1Request digital key ↗
08/26/2026Q00688963-I1Request digital key ↗
08/26/2026Q00688963-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/27/2026Q00476176-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00476185-I1Request digital key ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026Q00476185-I1Open ↗
09/01/2026Q00688963-P1Open ↗
09/01/2026Q00688963-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00476185-I1Open ↗
08/27/2026Q00476176-I1Open ↗
08/13/2026Q00688963-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026Q00476185-I1Open ↗
09/01/2026Q00688963-P1Open ↗
09/01/2026Q00688963-P3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00476185-I1Open ↗
08/27/2026Q00476176-I1Open ↗
08/13/2026Q00688963-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00688963-I1Open ↗
08/13/2026Q00688963-S1Open ↗