Professional building / stand-alone funeral home
31-80 41ST STREET
QUEENS · BIN 4011152
💬 Discuss this project
1969Year Built
2Stories
O7Building Class
R5Zoning
6,048 sfGross Floor Area
2Units
0 Active Violations 1 likely answered ▸
Professional building / stand-alone funeral home · Owner of record: 41st Street Astoria · 5,000 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Beauriorarenovatien Anc23p · 4 filings · 20 docs
Filed — no permit issuedFront facade repair work2p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
41st Street Astoria403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sole Proprietor106/20/2024
Mje Professional Services106/07/2024
CL Engineering511/05/2022
Davi Architecture203/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SMN Consulting Services203/21/2026
H J Building Consulting1003/21/2026
Line Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor303/21/2026
East Coast Builders & As*General Contractor303/21/2026
StructurelineGeneral Contractor203/21/2026
Queens Electrical ContractorsElectrical103/21/2026
JascoScaffold107/08/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
Olympia Plbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781511/05/2022
Davi Architecture5168203/17/2021
Building Lifecycle
All (68)Filed (9)Permit Issued (6)Signed Off (5)Violation (10)Inspection (4)Objection (4)Special Inspection (30)
08/22/2024
Signed off — Alteration
Q01041738-I1
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
07/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/01/2024
Objection raised — Other
07/01/2024
Objection raised — Inspections
06/20/2024
Filed — Alteration
Facade repair works at front facade of building as per plan
Q01067314-I1
06/07/2024
Filed — Alteration
Q01041738-I1
06/07/2024
Permit issued — Sidewalk Shed
Q01041738-I1-SH
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/28/2022
Signed off — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-S1
11/28/2022
Signed off — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-I1
11/25/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/07/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Air barrier — testing
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
11/07/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Air barrier — testing
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
11/06/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
11/05/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-P3
11/05/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-P2
08/27/2022
Violation issued (ECB, closed)
Unknown
08/02/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-P1
06/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2022
Permit issued — General Construction
Q00688963-I1-GC
03/23/2022
Violation issued (ECB, closed)
Construction
03/17/2022
Signed off — Alteration
Q00476176-I1
03/17/2022
Violation issued (ECB, closed)
Construction
03/03/2022
Permit issued — Plumbing
Q00688963-S1-PL
03/02/2022
Permit issued — General Construction
Q00688963-I1-GC
03/01/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-S1
03/01/2022
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR BEAUTY SALON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00688963-I1
12/15/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/14/2021
Permit issued — Plumbing
Q00476176-I1-PL
10/29/2021
Signed off — Alteration
Q00476185-I1
09/01/2021
Permit issued — General Construction
Q00476185-I1-GC
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJasco06/07/2024
DOB NOWGeneral ConstructionSigned-offStructureline05/21/2022
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG03/03/2022
DOB NOWGeneral ConstructionSigned-offSplen Construction03/02/2022
DOB NOWPlumbingSigned-offOlympia Plbing & Heating12/14/2021
DOB NOWGeneral ConstructionSigned-offEast Coast Builders & As*09/01/2021
BISFPISSUEDIdeal Fire Systems03/02/2006
BISOTISSUEDCooper Mechanical01/07/1994
BISPLISSUEDMario Moramarco01/07/1994
BISMHISSUEDHorizon Contractors of Lic04/22/1992
1 project · most recent 08/31/2022
General Wiring
FiledStatusContractorScope
08/31/2022Permit IssuedIntelogic ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/02/2024Structural Stability – Alterations of existing buildings—special
11/07/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/07/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
11/07/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
11/07/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
11/07/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/07/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
11/07/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
11/07/2022Air barrier — testing CHRISTIAN LOZADAenergy_progress
11/07/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
11/07/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/07/2022Lighting controlsCHRISTIAN LOZADAenergy_progress
11/07/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
11/07/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
11/07/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/07/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
11/07/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
11/06/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
11/06/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/06/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/06/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
11/06/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
11/06/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/06/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/06/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Beauriorarenovatien AncRetailFloor 1
Project Q00688963 Alteration · LOC Issued · 03/01/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/26/2026Q00688963-S1Request digital key ↗
08/26/2026Q00688963-I1Request digital key ↗
08/26/2026Q00688963-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/27/2026Q00476176-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00476185-I1Request digital key ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026Q00476185-I1Open ↗
09/01/2026Q00688963-P1Open ↗
09/01/2026Q00688963-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00476185-I1Open ↗
08/27/2026Q00476176-I1Open ↗
08/13/2026Q00688963-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026Q00476185-I1Open ↗
09/01/2026Q00688963-P1Open ↗
09/01/2026Q00688963-P3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00476185-I1Open ↗
08/27/2026Q00476176-I1Open ↗
08/13/2026Q00688963-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00688963-I1Open ↗
08/13/2026Q00688963-S1Open ↗