← Back
Four families
31 BAY 14 STREET
BROOKLYN · Bath Beach · BIN 3166432
💬 Discuss this project
1906Year Built
2Stories
C3Building Class
R5Zoning
2,400 sfGross Floor Area
4Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Four families · 2,708 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 23p · 2 filings · 17 docs
Floor 13p · 2 filings · 17 docs
Cellar4p · 2 filings · 17 docs
Filed — no permit issued3p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/03/2021$1.3M—Private party → Private party$529/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WKS INC.412/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ST SAFETY CONS. INCGeneral Contractor303/21/2026
NEW YORK STANDARD MECH CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WKS INC.4521412/02/2021
Building Lifecycle
All (52)Filed (4)Permit Issued (2)Signed Off (2)Violation (13)Inspection (5)Objection (16)Special Inspection (10)
05/01/2026
Violation issued (HPD, open)
A
06/06/2025
Violation issued (HPD, open)
A
04/08/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, open)
A
02/23/2022
Violation issued (HPD, closed)
I
12/13/2021
Signed off — Alteration
B00525333-I1
12/13/2021
Signed off — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH GC DOBNOW APPLICATION #: B00525333. INSTALL NEW 4 BOILER & 4 HW HEATER AT CELLAR; LAVATORY, TOILET, TUB, SINK & STOVE ON 1ST & 2ND FLOOR. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00525383-I1
12/08/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/08/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KO SHEK WONG
12/07/2021
Special inspection requirement — Energy Code Compliance Inspections
KO SHEK WONG
12/07/2021
Special inspection requirement — HVAC-R and service water heating equipment
KO SHEK WONG
12/07/2021
Special inspection requirement — HVAC-R and service water heating system controls
KO SHEK WONG
12/07/2021
Special inspection requirement — Maintenance information
KO SHEK WONG
12/07/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
KO SHEK WONG
12/02/2021
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH GC DOBNOW APPLICATION #: B00525333. INSTALL NEW 4 BOILER & 4 HW HEATER AT CELLAR; LAVATORY, TOILET, TUB, SINK & STOVE ON 1ST & 2ND FLOOR. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00525383-P1
11/01/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/01/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2021
Permit issued — Plumbing
B00525383-I1-PL
07/12/2021
Permit issued — General Construction
B00525333-I1-GC
07/07/2021
Objection resolved — Addressed
07/07/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Energy
07/02/2021
Objection raised — Energy
07/02/2021
Objection raised — Scope
07/02/2021
Objection raised — Scope
06/29/2021
Filed — Alteration
FILE MECHANICAL WORK IN-CONJUNCTION WITH DOBNow GC JOB #: B00525333. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00545171-I1
06/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KO SHEK WONG
06/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
KO SHEK WONG
06/23/2021
Special inspection requirement — Mechanical Systems
KO SHEK WONG
06/23/2021
Special inspection requirement — Final
KO SHEK WONG
06/16/2021
Objection resolved — Addressed
06/16/2021
Objection resolved — Addressed
06/16/2021
Objection resolved — Addressed
06/16/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Other
06/03/2021
Objection raised — Inspections
06/03/2021
Objection raised — Fire_Protection
06/03/2021
Objection raised — Fire_Protection
06/03/2021
Objection raised — Admin
06/03/2021
Objection raised — Mechanical
05/28/2021
Filed — Alteration
B00525333-I1
05/28/2021
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH GC DOBNOW APPLICATION #: B00525333. INSTALL NEW 4 BOILER & 4 HW HEATER AT CELLAR; LAVATORY, TOILET, TUB, SINK & STOVE ON 1ST & 2ND FLOOR. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00525383-I1
10/15/2018
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
01/12/2011
Violation issued (HPD, closed)
C
03/20/1986
Violation issued (HPD, closed)
B
09/07/1983
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP07/14/2021
DOB NOWGeneral ConstructionSigned-offST SAFETY CONS. INC07/12/2021
1 project · most recent 06/29/2021
Ventilation Systems
FiledStatusContractorScope
06/29/2021——Ventilation Systems
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/08/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/07/2021Fire-Resistant Penetrations and JointsKO SHEK WONGspecial
12/07/2021Energy Code Compliance InspectionsKO SHEK WONGprogress
12/07/2021HVAC-R and service water heating equipmentKO SHEK WONGenergy_progress
12/07/2021HVAC-R and service water heating system controlsKO SHEK WONGenergy_progress
12/07/2021Maintenance informationKO SHEK WONGenergy_progress
12/07/2021HVAC-R and service water piping design and insulationKO SHEK WONGenergy_progress
06/29/2021Fire-Resistant Penetrations and JointsKO SHEK WONGspecial
06/29/2021HVAC-R and service water piping design and insulationKO SHEK WONGenergy_progress
06/23/2021Mechanical SystemsKO SHEK WONGspecial
06/23/2021FinalKO SHEK WONGprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00525383-P1Request digital key ↗
09/01/2026B00525333-I1Request digital key ↗
08/14/2026B00545171-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature7
08/24/2026B00545171-I1Open ↗
08/24/2026B00545171-I1Open ↗
08/23/2026B00525383-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00525383-I1Open ↗
09/01/2026B00525383-P1Open ↗
09/01/2026B00525333-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B00545171-I1Open ↗
08/24/2026B00545171-I1Open ↗
08/23/2026B00525383-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00525383-P1Open ↗
09/01/2026B00525333-I1Open ↗
08/14/2026B00545171-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026B00525383-I1Open ↗
08/13/2026B00525333-I1Open ↗