💬 Discuss this project
1905Year Built
2Stories
B1Building Class
R5Zoning
2,035 sfGross Floor Area
2Units
Two family brick · 4,833 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof6p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 128p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
Site & exteriorTemporary construction fence7p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates704/02/2026
NYX Engineering308/10/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Min FA ConstructionGeneral Contractor504/09/2026
Min FA ConstructionScaffold403/21/2026
HI-Rite ElectricElectrical103/22/2026
Flytiger P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244704/02/2026
Building Lifecycle
06/12/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSE HORIZONTAL AND VERTICAL EXTENSION OF AN EXISTING TWO FAMILY HOUSE. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00900359-I1
04/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSE HORIZONTAL AND VERTICAL EXTENSION OF AN EXISTING TWO FAMILY HOUSE. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00900359-P5
04/02/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/02/2026
Special inspection requirement — Permanent certificate
NARESH MAHANGU
04/02/2026
Special inspection requirement — Final
YUNHO LEE
92 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMin FA Construction03/14/2025
DOB NOWConstruction FenceSigned-offMin FA Construction11/21/2024
DOB NOWStructuralPermit IssuedMin FA Construction11/21/2024
DOB NOWPlumbingSigned-offFlytiger P & H04/03/2024
DOB NOWFoundationPermit IssuedMin FA Construction12/29/2023
DOB NOWConstruction FenceSigned-offMin FA Construction11/14/2023
BISPLISSUEDCochrane Plumbing & Heating03/28/2012
BISOTISSUEDWoodpoint Construction SE12/16/2011
BISPLISSUEDFinest Mechanical01/20/2011
BISOTISSUEDWoodpoint Construction SE12/23/2010
1 project · most recent 04/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/02/2026Signed-offFlytiger P & HGas, Storm, Water/Sanitary
1 project · most recent 01/19/2024
General Wiring Lighting
FiledStatusContractorScope
01/19/2024CompleteHI-Rite ElectricGeneral Wiring, Lighting
2 projects · most recent 04/02/2026
Steel Masonry
FiledStatusContractorScope
04/02/2026Signed-offMin FA ConstructionSteel, Masonry
04/13/2023——Steel, Masonry
1 project · most recent 04/02/2026
Earthwork
FiledStatusContractorScope
04/02/2026Signed-offMin FA ConstructionEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/26/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/05/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 130
DateRequirementInspectorRole
04/02/2026FinalYUNHO LEEprogress
04/02/2026Insulation placement and R valuesNARESH MAHANGUenergy_progress
04/02/2026Fenestration areasNARESH MAHANGUenergy_progress
04/02/2026Protection of exposed foundation insulationNARESH MAHANGUenergy_progress
04/02/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
04/02/2026Interior lighting powerNARESH MAHANGUenergy_progress
04/02/2026Maintenance informationNARESH MAHANGUenergy_progress
04/02/2026Electric vehicle service equipment requirementsNARESH MAHANGUenergy_progress
04/02/2026Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
04/02/2026Air barrier — testing NARESH MAHANGUenergy_progress
04/02/2026Footing and FoundationNARESH MAHANGUprogress
04/02/2026Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
04/02/2026Permanent certificateNARESH MAHANGUenergy_progress
04/02/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/02/2026Structural Steel - WeldingNARESH MAHANGUspecial
04/02/2026Structural Steel - High Strength BoltingNARESH MAHANGUspecial
04/02/2026Structural Steel - DetailsNARESH MAHANGUspecial
04/02/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
04/02/2026Structural Cold-Formed SteelNARESH MAHANGUspecial
04/02/2026MasonryNARESH MAHANGUspecial
04/02/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/02/2026Excavations - Sheeting, Shoring, and BracingNARESH MAHANGUspecial
04/02/2026Concrete - Cast-In-PlaceNARESH MAHANGUspecial
04/02/2026MeteringNARESH MAHANGUenergy_progress
04/02/2026Fenestration air leakageNARESH MAHANGUenergy_progress
Latest 25 of 130.
182 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account