← Back
General warehouse
31 CUMBERLAND STREET
BROOKLYN · BIN 3057973
💬 Discuss this project
1973Year Built
1Stories
E1Building Class
M1-2Zoning
5,960 sfGross Floor Area
1Units
General warehouse · Owner of record: CUMBERLAND REALTY HOLDINGS, INC. · 5,960 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction20p · 5 filings · 20 docs
MezzanineUnder Construction17p · 2 filings · 20 docs
CellarUnder Construction22p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUMBERLAND REALTY HOLDINGS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MORALI ARCHITECTURE705/06/2026
ATOZ CONSULTING ENGINEERS, PC603/24/2026
SDG ENGINEERING PC308/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANTHONY MORALI ARCHITECT PLLC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.N.C. GENERAL CONTR CORPGeneral Contractor704/09/2026
EMPIRE STATE FIRE SPRINKLFire Protection207/08/2026
D. TRAYNOR ELEC'L CORPElectrical103/22/2026
EXPERT PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941405/06/2026
Building Lifecycle
All (150)Filed (16)Permit Issued (9)Signed Off (8)Inspection (21)Objection (66)Special Inspection (30)
07/29/2026
Signed off — Alteration CO
Conversion of existing warehouse into new basketball training/fitness facility. Partition, finish and fixture work. New storefront. Plumbing, mechanical, sprinkler, structural all filed separately.
B01243944-I1
06/23/2026
Signed off — Alteration
Modifications of existing plumbing systems to include installation of plumbing fixtures. Point of use, electric domestic water heaters, piping distribution and sanitary disposal systems. No change of use egress or occupancy filed under this pl application
B01219022-I1
06/16/2026
Objection resolved — Addressed
05/29/2026
Objection raised — Other
05/15/2026
Signed off — Alteration
Removal of dry valve and conversion to wet pipe sprinkler system. Minor sprinkler head work. No change to use, egress or occupancy under this application.
B01219011-I1
05/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2026
Filed — Alteration CO
Conversion of existing warehouse into new basketball training/fitness facility. Partition, finish and fixture work. New storefront. Plumbing, mechanical, sprinkler, structural all filed separately.
B01243944-P2
05/06/2026
Filed — No Work
B01372809-P1
05/06/2026
Special inspection requirement — Interior lighting power
Paul Raymond
05/06/2026
Special inspection requirement — Maintenance information
Paul Raymond
05/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
05/06/2026
Special inspection requirement — Public Assembly Emergency Lighting
ANTHONY MORALI
05/06/2026
Special inspection requirement — Fenestration areas
Paul Raymond
05/06/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
05/06/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
05/06/2026
Special inspection requirement — Lighting controls
Paul Raymond
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
05/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
05/06/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
05/06/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/16/2026
Objection resolved — Addressed
04/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/13/2026
Signed off — Alteration
Safe slope excavation required to remove and replace 1st floor slab on grade at a lower elevation. Safe slope excavation required for interior stair with confinement foundation walls. No change to use, egress or occupancy under this application.
B01251897-S2
04/08/2026
Objection raised — Scope
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection raised — Scope
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection raised — Scope
04/08/2026
Objection resolved — Addressed
04/05/2026
Objection resolved — Addressed
04/05/2026
Objection resolved — Addressed
04/05/2026
Objection resolved — Addressed
04/05/2026
Objection resolved — Addressed
04/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2026
Objection raised — Fire_Protection
04/02/2026
Objection raised — Scope
04/02/2026
Objection raised — Scope
04/02/2026
Objection raised — Scope
04/02/2026
Objection raised — Fire_Protection
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/31/2026
Signed off — Alteration
Interior renovation of existing light manufacturing space including demolition of non-load bearing partitions. MEP and structural to be filed separate. Exterior work at elevations as per plans filed herewith.
B01217593-I1
03/31/2026
Signed off — Alteration
Installation at air cooled VRF heat pump systems to provide heating and cooling for building. No change of use, egress or occupancy being filed under this mechanical application.
B01219125-I1
03/30/2026
Objection resolved — Addressed
03/27/2026
Objection raised — Scope
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/26/2026
Special inspection requirement — Sprinkler Systems
Paul Raymond
03/24/2026
Filed — Alteration
Removal of dry valve and conversion to wet pipe sprinkler system. Minor sprinkler head work. No change to use, egress or occupancy under this application.
B01219011-P1
03/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2026
Special inspection requirement — Sprinkler Systems
Paul Raymond
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/17/2026
Filed — Alteration CO
Conversion of existing warehouse into new basketball training/fitness facility. Partition, finish and fixture work. New storefront. Plumbing, mechanical, sprinkler, structural all filed separately.
B01243944-P1
03/17/2026
Filed — Alteration
Interior renovation of existing light manufacturing space including demolition of non-load bearing partitions. MEP and structural to be filed separate. Exterior work at elevations as per plans filed herewith.
B01217593-P1
03/16/2026
Filed — No Work
B01372809-I1
03/16/2026
Special inspection requirement — Lighting controls
Paul Raymond
03/16/2026
Special inspection requirement — Interior lighting power
Paul Raymond
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMNC GENERAL CONTR CORP02/20/2026
DOB NOWSprinklersPermit IssuedEMPIRE STATE FIRE SPRINKL01/29/2026
DOB NOWSupport of ExcavationSigned-offMNC GENERAL CONTR CORP12/24/2025
DOB NOWMechanical SystemsSigned-offMNC GENERAL CONTR CORP12/24/2025
DOB NOWSprinklersPermit IssuedEMPIRE STATE FIRE SPRINKL12/22/2025
DOB NOWPlumbingSigned-offEXPERT PLUMBING & HEATING11/13/2025
DOB NOWStructuralSigned-offMNC GENERAL CONTR CORP10/10/2025
DOB NOWFoundationSigned-offMNC GENERAL CONTR CORP09/04/2025
DOB NOWGeneral ConstructionSigned-offMNC GENERAL CONTR CORP09/04/2025
1 project · most recent 03/24/2026
FiledStatusContractorScope
03/24/2026Permit IssuedEMPIRE STATE FIRE SPRINKL11 heads
1 project · most recent 11/17/2025
Water/Sanitary
FiledStatusContractorScope
11/17/2025Signed-offEXPERT PLUMBING & HEATINGWater/Sanitary
3 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025CompleteCONTACT ELECTRIC CORPGeneral Wiring
01/17/2023CompleteD. TRAYNOR ELEC'L CORP1 meters, 1 new_meters
02/12/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
05/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/29/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/19/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/27/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/27/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
05/06/2026Interior lighting powerPaul Raymondenergy_progress
05/06/2026Maintenance informationPaul Raymondenergy_progress
05/06/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
05/06/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
05/06/2026Lighting controlsPaul Raymondenergy_progress
05/06/2026Fenestration air leakagePaul Raymondenergy_progress
05/06/2026Insulation placement and R valuesPaul Raymondenergy_progress
05/06/2026Public Assembly Emergency LightingANTHONY MORALIprogress
05/06/2026Air barrier - visual inspectionPaul Raymondenergy_progress
05/06/2026Exterior lighting powerPaul Raymondenergy_progress
05/06/2026Fenestration areasPaul Raymondenergy_progress
05/06/2026Energy Code Compliance InspectionsPaul Raymondprogress
05/06/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/26/2026Sprinkler SystemsPaul Raymondspecial
03/26/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/24/2026Sprinkler SystemsPaul Raymondspecial
03/24/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/16/2026Exterior lighting powerPaul Raymondenergy_progress
03/16/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
03/16/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/16/2026Energy Code Compliance InspectionsPaul Raymondprogress
03/16/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
03/16/2026Fenestration areasPaul Raymondenergy_progress
03/16/2026Interior lighting powerPaul Raymondenergy_progress
03/16/2026Lighting controlsPaul Raymondenergy_progress
Latest 25 of 74.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch14
08/21/2026B01219125-I1Request digital key ↗
08/21/2026B01219125-P1Request digital key ↗
08/21/2026B01219011-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/17/2026B01372809-P1Request digital key ↗
08/17/2026B01372809-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026B01243944-P2Open ↗
08/14/2026B01243944-P1Open ↗
08/13/2026B01243944-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/14/2026B01243944-P1Open ↗
08/13/2026B01243944-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/21/2026B01219125-P1Open ↗
08/21/2026B01219125-I1Open ↗
08/21/2026B01219011-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/25/2026B01219022-I1Open ↗
09/25/2026B01219022-I1Open ↗
09/01/2026B01219022-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/25/2026B01219022-I1Open ↗
09/01/2026B01219022-P2Open ↗
09/01/2026B01251897-S2Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026B01243944-P2Open ↗
08/15/2026B01243944-I1Open ↗
08/14/2026B01243944-P1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/21/2026B01219125-P1Open ↗
08/21/2026B01219125-I1Open ↗
08/21/2026B01219011-P1Open ↗
Showing 3 of 14 on file for this type
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01251897-S1Open ↗