← Back
STATEN ISLAND
31 CUNARD AVENUE
STATEN ISLAND · BIN 5166432
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralOther
Floor 27p · 2 filings · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OVER DEVELOPMENT4107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI810/31/2025
ISLAND ENGINEERING ASSOCIATES206/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS603/21/2026
JAMES V MORRI, RA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOOR TO DOOR REALTY LLCGeneral Contractor903/21/2026
OVER DEVELOPEMENT LTDGeneral Contractor303/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264510/31/2025
Building Lifecycle
All (70)Filed (10)Permit Issued (10)Signed Off (4)Inspection (16)Special Inspection (30)
10/31/2025
Filed — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-P4
10/28/2025
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN.
S00768122-I1
10/28/2025
Special inspection requirement — Lighting in dwelling units
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Structural Steel - Details
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Metering
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Lighting controls
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
10/28/2025
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
10/15/2025
Signed off — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-S1
09/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2025
Filed — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-P3
08/01/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2025
Signed off — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-S4
07/16/2025
Filed — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-P2
07/16/2025
Signed off — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-S2
07/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/14/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/02/2025
Filed — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-P1
06/02/2025
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN.
S00768122-P1
06/02/2025
Special inspection requirement — Sprinkler Systems
WILLIAM DURDEN, P.E.
05/23/2025
Permit issued — Curb Cut
S00555507-S4-CC
05/22/2025
Filed — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-S4
05/21/2025
Filed — New Building
PROPOSED TWO FAMILY RESIDENCE
S00555507-S2
05/21/2025
Permit issued — Curb Cut
S00555507-S2-CC
05/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
05/13/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
05/13/2025
Special inspection requirement — Structural Steel - Details
WILLIAM DURDEN, P.E.
05/13/2025
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
01/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/15/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/25/2024
Permit issued — Structural
S00555507-I1-GC-CX
09/25/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/19/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/16/2024
Permit issued — Plumbing
S83209359-S1-PL
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDOOR TO DOOR REALTY05/23/2025
DOB NOWCurb CutSigned-offDOOR TO DOOR REALTY05/21/2025
DOB NOWStructuralPermit IssuedDOOR TO DOOR REALTY10/25/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC09/16/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/12/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP06/12/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/05/2024
DOB NOWGeneral ConstructionPermit IssuedDOOR TO DOOR REALTY09/07/2023
DOB NOWStructuralPermit IssuedDOOR TO DOOR REALTY01/25/2023
DOB NOWFoundationPermit IssuedOVER DEVELOPEMENT LTD05/10/2022
1 project · most recent 10/31/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/31/2025Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
2 projects · most recent 04/09/2026
General Wiring
FiledStatusContractorScope
04/09/2026CompleteA & R ELEC'L CONTR'G INC.3 meters, 1 new_meters
01/08/2025CompleteTRUE ELECTRIC CORP.General Wiring
1 project · most recent 10/31/2025
Steel Concrete Wood
FiledStatusContractorScope
10/31/2025Signed-offDOOR TO DOOR REALTY LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
09/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/01/2025Pass-Final PL - UndergroundPassView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/25/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/21/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/28/2025Lighting in dwelling unitsWILLIAM DURDEN, P.E.energy_progress
10/28/2025Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
10/28/2025Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
10/28/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
10/28/2025Structural Steel - DetailsWILLIAM DURDEN, P.E.special
10/28/2025Subgrade InspectionsWILLIAM DURDEN, P.E.special
10/28/2025Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
10/28/2025Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
10/28/2025FinalWILLIAM DURDEN, P.E.progress
10/28/2025Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
10/28/2025Footing and FoundationWILLIAM DURDEN, P.E.progress
10/28/2025Structural Wood FrameWILLIAM DURDEN, P.E.progress
10/28/2025Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
10/28/2025MeteringWILLIAM DURDEN, P.E.energy_progress
10/28/2025Fenestration areasWILLIAM DURDEN, P.E.energy_progress
10/28/2025HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
10/28/2025Permanent certificateWILLIAM DURDEN, P.E.energy_progress
10/28/2025Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
10/28/2025Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
10/28/2025Lighting controlsWILLIAM DURDEN, P.E.energy_progress
10/28/2025Maintenance informationWILLIAM DURDEN, P.E.energy_progress
10/28/2025Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
10/28/2025Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
10/28/2025Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
06/02/2025Sprinkler SystemsWILLIAM DURDEN, P.E.special
Latest 25 of 49.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/19/2026S00768122-P1Request digital key ↗
08/19/2026S00768122-I1Request digital key ↗
08/18/2026S00555507-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
04/24/2025520297456Open ↗
04/24/2025520239750Open ↗
12/10/2020540192600Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
07/11/2022540192600Open ↗
12/10/2020540192600Open ↗
10/31/2016520262554Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
04/18/2016520262554Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00555507-I1Open ↗
08/13/2026S00555507-P4Open ↗
08/13/2026S00555507-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00555507-I1Open ↗
08/13/2026S00555507-P4Open ↗
08/13/2026S00555507-P1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S00555507-I1Open ↗
08/13/2026S00555507-P4Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
04/25/2017520262554Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/10/2020540192600Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/27/2016520239750Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/27/2016520239750Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/27/2016520239750Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00555507-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/18/2026S00555507-S2Open ↗
08/18/2026S00555507-P1Open ↗
08/18/2026S00555507-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026S00555507-P1Open ↗
09/02/2026S00555507-P1Open ↗
08/27/2026S00555507-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026S00555507-P1Open ↗
09/02/2026S00555507-P1Open ↗
08/27/2026S00555507-P4Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/26/2016520297456Open ↗
04/27/2016520239750Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/13/2016520297456Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/10/2020540192600Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/13/2016520297456Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/10/2020540192600Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00555507-I1Open ↗
08/13/2026S00555507-P4Open ↗
08/13/2026S00555507-P1Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/13/2016520297456Open ↗
04/27/2016520239750Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00555507-I1—
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/13/2026S00555507-I1Open ↗
08/13/2026S00555507-P4Open ↗
08/13/2026S00555507-P1Open ↗
▸BISSTREET TREE CHECKLIST1
04/27/2016520239750Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00555507-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00555507-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00555507-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/27/2016520239750Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00555507-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00555507-S1Open ↗
▸Inspections & Test Reports9
▸BISBPP-9 - Request for Builders Pavement Field Inspection3
07/11/2022540192600Open ↗
12/10/2020540192600Open ↗
11/03/2016520262554Open ↗
▸DOB NOWSOIL REPORT3
08/13/2026S00555507-P1Open ↗
08/13/2026S00555507-I1Open ↗
08/13/2026S00555507-P4Open ↗
▸BISHYDRO FLOW TEST LETTER1
04/04/2017520297456Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00555507-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00555507-I1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff3
07/11/2022540192600Open ↗
12/10/2020540192600Open ↗
10/31/2016520262554Open ↗
▸BISLetter from Homeowner for Withdrawal3
04/24/2025520297456Open ↗
04/24/2025520239750Open ↗
12/08/2020520262554Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/26/2016520297456Open ↗
04/27/2016520239750Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/31/2016520262554Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
04/27/2016520239750Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/13/2016520297456Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
10/13/2016520297456Open ↗
04/27/2016520239750Open ↗
04/19/2016520262554Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/10/2020540192600Open ↗
▸BISADDITIONAL INFORMATION1
04/18/2016520262554Open ↗
▸BISBOROUGH INTAKE FORM1
02/20/2018520239750Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026S00555507-I1Open ↗
08/13/2026S00555507-P1Open ↗
08/13/2026S00555507-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00555507-P4Open ↗
08/13/2026S00555507-P1Open ↗
08/13/2026S00555507-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
07/06/2016520262554Open ↗
06/17/2016520262554Open ↗
▸BISWAIVER OF CURB ALIGNMENT.1
07/11/2022540192600Open ↗
▸BISPLOT DIAGRAM1
04/27/2016520239750Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
12/10/2020540192600Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00555507-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00555507-I1Open ↗