← Back
Walk-up cooperative
31 GREENE STREET
MANHATTAN · BIN 1002974
💬 Discuss this project
1876Year Built
5Stories
C6Building Class
M1-5/R7XZoning
12,000 sfGross Floor Area
5Units
Rent Stabilized44 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: CASSM REALTY CORP · 2,500 sf lot · 4.8 FAR built · Flood zone X500
Locations of Work
Mechanical
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASSAM REALTY2803/22/2026
39 GREENE OWNERS CORP103/22/2026
THOR EQUITIES203/21/2026
PHOENIX103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LANDOW AND LANDOW ARCHITECTS102/13/2026
NEW AGE ENGINEERING PLLC101/20/2023
ENTHINK ENGINEERS LLC310/31/2022
GREEN DESIGN107/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor1007/08/2026
BIRNBAUM, ALANElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746101/20/2023
Building Lifecycle
All (92)Filed (6)Permit Issued (8)Signed Off (3)Violation (60)Inspection (1)Objection (7)Special Inspection (7)
04/15/2026
Objection resolved — Resolved
04/07/2026
Objection raised — Zoning
03/18/2026
Objection resolved — Resolved
02/26/2026
Objection resolved — Addressed
02/24/2026
Objection raised — Zoning
02/24/2026
Objection raised — Fire_Protection
02/24/2026
Objection raised — Admin
02/13/2026
Filed — Alteration CO
FILING HEREWITH CHANGE OF USE FROM JOINT LIVIG WORK QUARTERS TO MEDICAL OFFICE ON THE FIRST FLOOR AS INDICATED ON THE DRAWINGS
M01356215-I1
02/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/13/2023
Signed off — Alteration
INSTALL REPLACEMENT LOW PRESSURE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00809785-I1
09/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Signed off — Alteration
M08030801-I1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/25/2023
Permit issued — Boiler Equipment
M00809785-I1-BE
01/20/2023
Filed — Alteration
INSTALL REPLACEMENT LOW PRESSURE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00809785-I1
01/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
01/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
01/13/2023
Special inspection requirement — Maintenance information
Stephen Shishko
01/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
01/11/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Stephen Shishko
12/13/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00345676-I1
10/31/2022
Filed — Alteration
M08030801-I1
10/31/2022
Permit issued — Protection and Mechanical Methods
M08030801-I1-PM
10/31/2022
Permit issued — Sidewalk Shed
M00345676-I1-SF
10/26/2022
Violation issued (ECB, closed)
Elevators
07/18/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00345676-P2
04/26/2022
Permit issued — Supported Scaffold
M00345676-I1-SH
03/18/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2021
Permit issued — Supported Scaffold
M00345676-I1-SF
04/29/2021
Permit issued — Supported Scaffold
M00345676-I1-SH
04/05/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/08/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00345676-P1
06/01/2020
Permit issued — Sidewalk Shed
M00345676-I1-SF
05/01/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00345676-I1
05/01/2020
Permit issued — Supported Scaffold
M00345676-I1-SH
04/03/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/27/2018
Violation issued (HPD, open)
A
04/05/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/15/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/29/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/04/2017
Violation issued (HPD, open)
B
12/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2016
Violation issued (HPD, closed)
I
06/06/2016
Violation issued (HPD, open)
B
06/06/2016
Violation issued (HPD, open)
B
06/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2015
Violation issued (HPD, closed)
I
09/28/2015
Violation issued (HPD, open)
B
09/28/2015
Violation issued (HPD, open)
B
08/16/2015
Violation issued (HPD, open)
A
08/16/2015
Violation issued (HPD, open)
B
08/16/2015
Violation issued (HPD, open)
B
08/16/2015
Violation issued (HPD, open)
B
08/16/2015
Violation issued (HPD, open)
C
08/16/2015
Violation issued (HPD, open)
B
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP01/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offPHOENIX SUTTON STR INC10/31/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC10/31/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC04/26/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC11/04/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC04/29/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/01/2020
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC05/01/2020
BISOTISSUEDPRESERV BLD RESTOR MGT IN03/14/2023
BISOTISSUEDPRESERV BLD RESTOR MGT IN04/08/2022
BISOTISSUEDINTER RENOVATION INC01/18/2022
BISOTISSUEDINTER RENOVATION INC09/14/2020
BISEQISSUEDPHOENIX SUTTON STR INC08/15/2018
BISEQISSUEDPHOENIX SUTTON STR INC08/08/2017
BISSPISSUEDPREMIER FLOW PLBG AND HTG01/26/2017
BISPLISSUEDJL PLUMBING LLC12/14/2016
BISOTISSUEDGC LEADER CONSTRUCTION CO11/28/2016
BISEQISSUEDPHOENIX SUTTON STR INC08/23/2016
BISEQISSUEDPHOENIX SUTT. STREET INC08/20/2015
BISOTISSUEDF.SGROI CONSTRUCTION CO10/16/2014
BISSPISSUEDFIVE BOROUGH NYC LLC10/23/1998
BISMHISSUEDMAXIE COHEN10/19/1998
BISFBISSUEDESPOSITO HEATING CONTRACTORS01/30/1998
BISOTISSUEDSOHO RESTORATION CO.06/27/1995
BISBLISSUEDESPOSITO HEATING CONTRACTORS01/02/1991
1 project · most recent 02/12/2021
FiledStatusContractorScope
02/12/2021CompleteSTAR ELEC'L CONTRACTORS C—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/12/2026Fire-Resistance Rated Construction—progress
02/12/2026Fire-Resistant Penetrations and Joints—special
01/13/2023HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/13/2023HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/13/2023Maintenance informationStephen Shishkoenergy_progress
01/11/2023Tenant Protection Plan ComplianceStephen Shishkospecial
01/11/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Stephen Shishkospecial
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026M00345676-P2Request digital key ↗
09/02/2026M00345676-P1Request digital key ↗
09/02/2026M00345676-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/02/2026M00345676-I1Request digital key ↗
09/02/2026M00345676-P2Request digital key ↗
08/15/2026M00345676-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/01/2026M08030801-I1Request digital key ↗
09/01/2026M00809785-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION12
03/15/2023140391948Open ↗
06/07/2021140886469Open ↗
04/15/2021140886469Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION11
04/08/2022140886469Open ↗
09/14/2020140886469Open ↗
09/12/2019140391948Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE COMPLIANCE1
03/03/2020140886469Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
03/03/2020140886469Open ↗
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
08/27/2018140526651Open ↗
06/09/2017140526651Open ↗
07/14/2015122437407Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026M08030801-I1Open ↗
08/13/2026M00345676-P1Open ↗
08/13/2026M00345676-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/03/2020140886469Open ↗
07/26/2016140526651Open ↗
08/19/2015140391948Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/03/2020140886469Open ↗
07/26/2016140526651Open ↗
08/19/2015140391948Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/03/2020140886469Open ↗
07/26/2016140526651Open ↗
08/19/2015140391948Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M00809785-I1Open ↗
09/23/2026M00809785-I1Open ↗
09/23/2026M00809785-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M00809785-I1Open ↗
09/23/2026M00809785-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/15/2017140526651Open ↗
05/05/2017140526651Open ↗
▸BISSCHEDULE B - PLUMBING1
07/26/2016140526651Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan3
08/13/2026M00345676-P1Open ↗
08/13/2026M00345676-P2Open ↗
08/13/2026M00345676-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
03/03/2020140886469Open ↗
07/26/2016140526651Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/08/2024140886469Open ↗
07/26/2016140526651Open ↗
07/14/2015122437407Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
09/14/2020140886469Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/03/2020140886469Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00809785-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/15/2017140526651Open ↗
07/14/2015122437407Open ↗
11/07/2014122045401Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/26/2016140526651Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/07/2014122045401Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/26/2016140526651Open ↗
▸BISNYCECC EXEMPTION1
03/03/2020140886469Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/19/2015140391948Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00809785-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/05/2024140886469Open ↗
08/28/2020140886469Open ↗
03/03/2020140886469Open ↗
Showing 3 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
08/27/2018140526651Open ↗
08/27/2018140526651Open ↗
▸Approvals, Objections & Sign-offs19
▸BISLANDMARKS APPROVAL6
03/03/2020140886469Open ↗
05/15/2017140526651Open ↗
08/05/2016122437407Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/08/2022140886469Open ↗
09/12/2019140391948Open ↗
09/12/2019140391948Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/08/2024140886469Open ↗
03/14/2023140391948Open ↗
08/27/2018140526651Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
08/14/2017140391948Open ↗
09/22/2016140391948Open ↗
▸BISLANDMARKS SIGNOFF1
04/08/2024140886469Open ↗
▸BISFINAL1
03/02/2023140391948Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
04/05/2024140886469Open ↗
06/07/2021140886469Open ↗
03/03/2020140886469Open ↗
Showing 3 of 7 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
11/28/2016140526651Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION5
06/07/2021140886469Open ↗
05/15/2017140526651Open ↗
05/15/2017140526651Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
04/08/2022140886469Open ↗
03/21/2022140886469Open ↗
08/27/2018140526651Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
03/03/2020140886469Open ↗
07/26/2016140526651Open ↗
08/19/2015140391948Open ↗
▸BISEFILING COVER SHEET2
07/14/2015122437407Open ↗
06/24/2014122045401Open ↗
▸Other Documents2
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
03/03/2020140886469Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/22/2016140391948Open ↗