Floor 17Unit 17F, Unit 17G2p · 2 filings · 20 docs
Plumbing
Issued Permit Scope
Plumbing
relocate 1 sink, 1 range; replace 1 toilet, 1 lav., 1 tub, install 1 dishwasher
On file for this project
15 documents
Renovation of kitchen and bathroom plumbing, including relocation/replacement of fixtures, tub-to-shower conversion, and modifications to existing water supply and sanitary drainage piping.
On file for this project
7 documents · 12 drawing sheets
Floor 16
Floor 15Unit 15E1p · 1 filing · 5 docs
Plumbing
Issued Permit Scope
Plumbing
Cap 1 sink and 1 gas range in existing kitchen and replace 1 lav and 1 wc in bathroom in Apartment #15E on the 15th floor. No change to use, egress, or occupancy.
On file for this project
5 documents
Floor 14Unit 14F, Unit 14DE2p · 4 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing work associated with interior renovation of Apt. #14DE on the 14th floor. No change to use, egress or occupancy.
On file for this project
4 documents
Renovation and combination of existing co-op apartments (#14DE) on the 14th floor. No change to use, egress or occupancy.
On file for this project
10 documents
REPLACE AND RELOCATE PLUMBING FIXTURES ACCORDING TO DRAWINGS. NO CHANGES TO USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 13
Floor 12Unit 12A, Unit 12F, Unit 12G9p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Filing herewith for Plumbing modifications related to combination of Apartments 12F & 12G. Filed in conjunction with OT application M00697207
On file for this project
8 documents
Filing herewith application to combine apartments 12F & 12G
On file for this project
8 documents
INTERIOR RENOVATION OF EXISTING RESIDENTIAL APARTMENT 12A ON 12TH FLOOR. PLUMBING WORK TYPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
5 documents
Floor 11
Floor 10Unit 10F, Unit 10G8p · 2 filings · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
REMOVE ,RELOCATE I,NSTALL AND REPLACE NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE COMBINATION OF APARTMENT 10F AND 10G ON THE 10 FLOOR IN CONJUNCTION WITH THE ALTERATION TYPE 2 FILED UNDER APPLICATION NO M01125287 -I1 , ALL AS PER PLAN.
On file for this project
3 documents · 1 drawing sheet
COMBINATION OF APARTMENT OF 10F/10G ON THE 10 FLOOR REMOVE AND CONSTRUCT NEW PARTITIONS. REMOVE ONE KITCHEN . REPAIR CEILING ANDC FLOOR WERE REQUIRED. AND NEW LIGHTING. ALL AS PEER PLAN NO CHANGE IN USE EGRESS OR OCCUPANCY .
On file for this project
4 documents
Floor 9Unit 9A, Unit 9B2p · 2 filings · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
MINOR PLUMBING WORK AS PER PLANS. THIS APPLICATION IS SUPERSEDING APPLICATION 103935164. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
LEGALIZING THE COMBINATION OF TWO EXISTING APARTMENTS 9A AND 9B. MINOR PARTITION CHANGES AS PER PLANS. THIS APPLICATION IS TO SUPERCEDE APPLICATION #103935164. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents
Floor 8Unit 8A, Unit 8B25p · 2 filings · 20 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
Installation of new plumbing fixtures as per plans.
On file for this project
14 documents · 3 drawing sheets
Remove the interior non-load bearing partition, and combine apartments 8A, 8B, and 8C under TPPN# 3/97. New finishes, new non-load-bearing walls,
On file for this project
12 documents
Floor 7Unit 7FUnder Construction14p · 1 filing · 16 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (2 LAV, 2 WC, 1 TUB, 1 SHOWER, 1 SINK, 1 DW) AND RELOCATE EXISTING GAS STOVE FROM THE ORIGINAL APPLIANCE TO THE NEW LOCATION WITHIN 6 FT. AT APT 7F ON THE 7TH FLOOR.
On file for this project
16 documents · 4 drawing sheets
Floor 6Unit 6F3p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING FIXTURE WORK AT UNIT 6F. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
interior renovation to apartment number 6F. Partition, finish and fixture work. no change to use, egress or occupancy.
On file for this project
15 documents
Floor 5
Floor 4Unit 4F8p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Filing for replacement of plumbing fixtures as per plans filed.
On file for this project
10 documents
Filing for interior demo and general construction of apartment unit 4F. No changes in use, egress or occupancy.
On file for this project
14 documents
Floor 3
Floor 2Unit 2F12p · 1 filing · 16 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 SINK, 1 DW, 2 WC, 2 LAV, 1 TUB) AND INSTALL NEW PLUMBING FIXTURES (1 SHOWER) IN APT #2F ON THE 2ND FLOOR.
On file for this project
16 documents · 4 drawing sheets
Floor 1Akam Associates, INC.23p · 5 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
SCOPE OF WORK TO INCLUDE INSTALLATION OF (3) THREE NEW HVAC SPLIT SYSTEMS.
On file for this project
6 documents · 1 drawing sheet
PROPOSAL TO INSTALL A TOTAL OF SEVEN (7) NON-ILLUMINATED, ACCESSORY BUSINESS AWNINGS ON EXTERIOR WALLS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCPUANCY. Wording on 2 Awnings- PLANTSHED. Wording on 1 Awning- PLANTSHED *logo* 46 8TH AVE
On file for this project
6 documents
INTERIOR ALTERATION TO EXISTING FIRST FLOOR TENANT SPACE. SCOPE OF WORK TO INCLUDE NEW FINISHES, NEW LIGHTING, NEW MILLWORK, EQUIPMENT, NEW HANDICAP TOILET AND EXHAUST FAN.
On file for this project
12 documents
Latest 3 of 5 filings on this floor.
CellarAkam Associates, INC.5p · 1 filing · 8 docs
Mechanical
Issued Permit Scope
Mechanical Systems
FILING TO INSTALL NEW HVAC SYSTEM AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Site & exteriorAkam Associates, INC.29p · 3 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sidewalk Shed · Supported Scaffold
FILING TO INSTALL NEW HVAC SYSTEM AS PER PLANS SUBMITTED. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
8 documents · 8 drawing sheets
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
9 documents · 12 drawing sheets
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
3 documents · 9 drawing sheets