31 LATHAM PLACE
STATEN ISLAND · Arden Heights-Rossville · BIN 5085751
💬 Discuss this project
1980Year Built
2Stories
A1Building Class
R3XZoning
3,008 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 12,630 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
Electrical
Roof4p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC211/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272211/27/2024
Building Lifecycle
All (15)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (10)
11/07/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01123596-I1
11/27/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01123596-P1
11/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/27/2024
Special inspection requirement — Final
Walid Abdulla
11/27/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/22/2024
Special inspection requirement — Final
Walid Abdulla
11/22/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/25/2024
Permit issued — Solar
S01123596-I1-SL
10/16/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01123596-I1
03/29/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/25/2024
BISOTISSUEDM.R.A.L. CONSULTANTS CORP.03/09/2004
1 project · most recent 10/16/2024
General Wiring
FiledStatusContractorScope
10/16/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/27/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/27/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/27/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/27/2024FinalWalid Abdullaprogress
11/27/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/22/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/22/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/22/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/22/2024FinalWalid Abdullaprogress
11/22/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S01123596-I1Request digital key ↗
08/20/2026S01123596-P1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/16/2026S01123596-P1Open ↗
09/16/2026S01123596-P1Open ↗
09/16/2026S01123596-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/16/2026S01123596-P1Open ↗
09/16/2026S01123596-P1Open ↗
08/26/2026S01123596-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026S01123596-I1Open ↗
08/20/2026S01123596-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026S01123596-P1Open ↗
08/20/2026S01123596-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01123596-I1Open ↗