← Back
BuildNYC
Elevator cooperative
Lindsay Park
31 LEONARD STREET · BIN 3327972
💬 Discuss this project
1965Year Built
21Stories
D4Building Class
R6Zoning
751,412 sfGross Floor Area
772Units
LL97 CoveredRent Stabilized76 Active Violations 65 unresolved · 11 paperwork only 3 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Lindsay Park HGS · 257,500 sf lot · 2.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMetro Management Development3p · 3 filings · 8 docs
Floor 1Metro Management Development INC.1 filing · 7 docs
Site & exteriorHeavy duty sidewalk shed installation for facade work4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lindsay Park Housing1903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Collado Engineering201/08/2026
NY Restoration Technology308/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xinos Construction803/21/2026
Municipal Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionScaffold707/08/2026
R & L SystemsElectrical103/21/2026
Regional Electrical VoiceElectrical103/22/2026
Jubilee ElectricElectrical103/21/2026
Building Lifecycle
All (127)Filed (6)Permit Issued (8)Signed Off (1)Facade (FISP) (17)Violation (60)Objection (13)Special Inspection (22)
05/18/2026
Violation issued (HPD, closed)
C
02/16/2026
Signed off — Alteration
B00373809-I1
01/26/2026
Special inspection requirement — Post-installed Anchors
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/26/2026
Special inspection requirement — Mechanical Systems
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
01/26/2026
Special inspection requirement — Final
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/26/2026
Special inspection requirement — Shutoff dampers
01/26/2026
Special inspection requirement — Maintenance information
01/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
01/08/2026
Filed — Alteration
Mechanical plans filed herewith to show addition of VRF split system and associated ductwork/piping in lobby. Relocation of radiator and associated piping. No change to use, egress, or occupancy.
B01234545-P1
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/19/2025
Special inspection requirement — Mechanical Systems
12/19/2025
Special inspection requirement — Post-installed Anchors
12/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
12/19/2025
Special inspection requirement — Final
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/19/2025
Special inspection requirement — Shutoff dampers
12/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
12/19/2025
Special inspection requirement — Maintenance information
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Mechanical
06/30/2025
Objection raised — Mechanical
06/30/2025
Objection raised — Mechanical
06/30/2025
Objection raised — Energy
06/30/2025
Objection raised — Zoning
06/17/2025
Filed — Alteration
Mechanical plans filed herewith to show addition of VRF split system and associated ductwork/piping in lobby. Relocation of radiator and associated piping. No change to use, egress, or occupancy.
B01234545-I1
05/22/2025
Permit issued — Suspended Scaffold
B01064434-I1-SC
04/06/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, open)
B
03/04/2025
Violation issued (HPD, open)
C
03/04/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
A
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction05/22/2025
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction06/21/2024
DOB NOWSidewalk ShedSigned-offXinos Construction07/06/2022
DOB NOWSidewalk ShedSigned-offXinos Construction02/04/2022
DOB NOWSupported ScaffoldPermit IssuedXinos Construction08/19/2021
DOB NOWSidewalk ShedSigned-offXinos Construction03/08/2021
DOB NOWSidewalk ShedSigned-offXinos Construction02/19/2021
DOB NOWSidewalk ShedSigned-offXinos Construction07/22/2020
BISOTISSUEDXinos Construction03/12/2026
BISOTISSUEDXinos Construction06/05/2025
BISEQISSUEDSpring Scaffolding05/08/2024
BISOTISSUEDXinos Construction03/06/2024
BISEQISSUEDSpring Scaffolding05/16/2023
BISOTISSUEDXinos Construction03/06/2023
BISEQISSUEDSpring Scaffolding05/18/2022
BISEQISSUEDSpring Scaffolding05/16/2022
BISOTISSUEDXinos Construction03/09/2022
BISOTISSUEDXinos Construction02/14/2022
BISEQISSUEDSpring Scaffolding04/13/2021
BISOTISSUEDXinos Construction02/22/2021
BISOTISSUEDXinos Construction01/20/2021
BISEQISSUEDSpring Scaffolding04/15/2020
BISEQISSUEDSpring Scaffolding04/24/2019
BISEQISSUEDSpring Scaffolding05/08/2018
BISEQISSUEDSpring Scaffolding04/18/2017
BISEQISSUEDSpring Scaffolding04/01/2016
BISEQISSUEDSpring Scaffolding04/22/2015
BISPLISSUEDG.bassolino Plumbing01/11/2012
BISFBISSUEDG.bassolino Plumbing01/11/2012
BISOTISSUEDNational Mechanical Services10/04/2011
BISOTISSUEDNational Mechanical Services09/28/2011
BISEQISSUEDPhoenix Bridging01/02/2007
BISEQISSUEDPhoenix Bridging03/24/2006
BISMHISSUEDOwner01/05/2000
1 project · most recent 01/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MLZ-KX18NL 21,000 BTU · Fan Coil Indoor ×4
MSZ-GX12NL 18,100 BTU · Fan Coil Indoor ×2
MXZ-SM36NAM2 36,000 BTU · Heat Pump Outdoor ×2
MXZ-SM48NL 50,000 BTU · Heat Pump Outdoor ×2
PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×2
4 projects · most recent 05/18/2021
General Wiring
FiledStatusContractorScope
05/18/2021Permit IssuedRegional Electrical VoiceGeneral Wiring
02/18/2021Permit IssuedRegional Electrical VoiceGeneral Wiring
07/21/2020CompleteTower Electric—
11/11/2019CompleteJam Electrical—
1 project · most recent 03/02/2021
Scaffold
FiledStatusContractorScope
03/02/2021——Scaffold
1 project · most recent 06/10/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/10/2024Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
01/26/2026Post-installed Anchors—special
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Tenant Protection Plan Compliance—special
01/26/2026Mechanical Systems—special
01/26/2026Energy Code Compliance Inspections—progress
01/26/2026Final—progress
01/26/2026HVAC-R and service water heating system controls—energy_progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026Shutoff dampers—energy_progress
01/26/2026Maintenance information—energy_progress
01/26/2026Duct leakage testing, insulation and design—energy_progress
12/19/2025Fire-Resistant Penetrations and Joints—special
12/19/2025Mechanical Systems—special
12/19/2025Post-installed Anchors—special
12/19/2025Tenant Protection Plan Compliance—special
12/19/2025Energy Code Compliance Inspections—progress
12/19/2025Final—progress
12/19/2025HVAC-R and service water heating system controls—energy_progress
12/19/2025Shutoff dampers—energy_progress
12/19/2025Duct leakage testing, insulation and design—energy_progress
12/19/2025Maintenance information—energy_progress
12/19/2025HVAC-R and service water piping design and insulation—energy_progress
▾Documents — 129 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/01/2026B00579236-I1Request digital key ↗
08/24/2026B01064434-I1Request digital key ↗
08/21/2026B01234545-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00373809-I1Request digital key ↗
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION15
05/08/2024340250711Open ↗
05/08/2024340250711Open ↗
05/17/2023340250711Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
05/30/2025322059339Open ↗
05/13/2022322059339Open ↗
09/22/2020340767717Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/01/2019322059339Open ↗
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
11/21/2018322059339Open ↗
11/21/2018322059339Open ↗
11/21/2018322059339Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00478998-I1Open ↗
09/01/2026B00579236-I1Open ↗
08/21/2026B01234545-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/12/2012320417900Open ↗
10/08/2011320372814Open ↗
05/09/2011320306682Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/12/2012320417900Open ↗
10/06/2011320372814Open ↗
05/09/2011320306682Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/22/2020340767717Open ↗
04/21/2015340250711Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/22/2020340767717Open ↗
04/21/2015340250711Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/22/2020340767717Open ↗
04/21/2015340250711Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
06/04/2012320417900Open ↗
06/04/2012320417900Open ↗
06/04/2012320417900Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
02/07/2013320417900Open ↗
02/13/2012320417900Open ↗
▸BISSCHEDULE B - PLUMBING1
01/12/2012320417900Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
06/14/2022322059339Open ↗
▸Environmental & Asbestos6
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/06/2011320372814Open ↗
10/06/2011320372814Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
01/15/2021322059339Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/21/2015340250711Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/09/2011320306682Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/12/2012320417900Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/21/2018322059339Open ↗
11/21/2018322059339Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/21/2015340250711Open ↗
▸Inspections & Test Reports1
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
01/15/2021322059339Open ↗
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION10
05/08/2024340250711Open ↗
05/08/2024340250711Open ↗
05/08/2024340250711Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
03/20/2025340250711Open ↗
08/08/2017320417900Open ↗
08/08/2017320372814Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/14/2026B00478998-I1Open ↗
08/13/2026B01234545-I1Open ↗
08/13/2026B01234545-P1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/12/2012320417900Open ↗
10/06/2011320372814Open ↗
05/09/2011320306682Open ↗
▸BISFINAL1
01/15/2021322059339Open ↗
▸BISSHED LETTER1
04/21/2016340250711Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B01234545-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
09/22/2020340767717Open ↗
11/21/2018322059339Open ↗
08/01/2017320372814Open ↗
Showing 3 of 6 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
03/02/2023322059339Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION4
06/04/2025322059339Open ↗
06/09/2022340250711Open ↗
04/15/2021340250711Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
05/17/2023340250711Open ↗
06/09/2022340250711Open ↗
04/15/2021340250711Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
11/21/2018322059339Open ↗
01/12/2012320417900Open ↗
10/06/2011320372814Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/22/2020340767717Open ↗
04/21/2015340250711Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/30/2025322059339Open ↗
08/01/2017320372814Open ↗
08/01/2017320417900Open ↗
▸DOB NOWCalculations1
08/13/2026B01064434-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01064434-I1Open ↗