← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Rose Castle
31 LITTLE NASSAU STREET · BIN 3054203
💬 Discuss this project
2020Year Built
9Stories
D1Building Class
R7AZoning
65,702 sfGross Floor Area
87Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Flushing & Little Nassau · 13,344 sf lot · 4.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsRiverside Developers5 filings
Floor 1Riverside Developers1 filing
Site & exteriorRiverside Developers2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Flushing & Little Nassau203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution603/21/2026
Advanced Builders Services503/21/2026
Albo Liberis203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Riverside Developers USAGeneral Contractor1207/08/2026
Tristate Fire SprinklersFire Protection407/08/2026
Core Scaffold SystemsScaffold407/08/2026
Empire Management & Con*General Contractor303/21/2026
Riverside Developers USAScaffold203/21/2026
Prime Piping & HeatingPlumbing207/08/2026
V. Vass ElectricElectrical103/22/2026
Mpi PlumbingPlumbing107/08/2026
Net Power ElectricElectrical103/21/2026
High Standard ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tecnico Special Inspectio5939601/19/2022
AR-Tech Engineering6659204/16/2021
Building Lifecycle
09/30/2026
Elevator Category 5 inspection report filed
07/14/2026
Elevator Category 1 inspection report filed
03/07/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
03/07/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
03/07/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCHING MECHANISM AT WINDOW IN THE 2nd ROOM FROM NORTH LOCATED AT APT 208, 2nd…
HPD violation · closed
122 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offEmpire Management & Con*03/30/2022
DOB NOWMechanical SystemsSigned-offRiverside Developers USA12/10/2021
DOB NOWCurb CutSigned-offRiverside Developers USA12/08/2021
DOB NOWStandpipeSigned-offTristate Fire Sprinkler11/16/2021
DOB NOWPlumbingSigned-offPrime Piping & Heating09/14/2021
DOB NOWConstruction FenceSigned-offRiverside Developers USA04/22/2021
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems03/16/2021
DOB NOWPlumbingSigned-offYG Services02/12/2021
DOB NOWPlumbingSigned-offPrime Piping & Heating01/29/2021
DOB NOWStandpipeSigned-offTristate Fire Sprinkler01/28/2021
DOB NOWSprinklersSigned-offTristate Fire Sprinkler01/28/2021
DOB NOWStandpipeSigned-offTristate Fire Sprinkler11/12/2020
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems06/01/2018
BIS—ISSUEDRiverside Developers USA10/11/2021
BISEQISSUEDCore Scaffold Systems03/18/2021
BIS—ISSUEDRiverside Developers USA10/30/2020
BISEQISSUEDCore Scaffold Systems10/19/2020
BISOTISSUEDRiverside Developers USA12/18/2018
BIS—ISSUEDYatziv11/30/2018
BIS—ISSUEDYatziv06/12/2018
BIS—ISSUEDYatziv06/06/2018
BISEQISSUEDYatziv05/25/2018
8 projects · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025CompleteNet Power ElectricGeneral Wiring
12/21/2021CompleteHigh Standard Electric—
12/21/2021CompleteHigh Standard ElectricGeneral Wiring
02/16/2021CompleteV. Vass Electric—
12/02/2020CompleteStar Electrical Contractors—
10/05/2020CompleteV. Vass Electric—
08/16/2018CompleteHigh Standard Electric—
05/29/2018CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/10/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
01/20/2022Heating SystemsJose Lockhartspecial
01/20/2022Mechanical SystemsJose Lockhartspecial
01/20/2022Fire-Resistant Penetrations and JointsJose Lockhartspecial
01/20/2022FinalJose Lockhartprogress
01/20/2022HVAC insulation and sealing Jose Lockhartenergy_progress
01/20/2022HVAC and service water heating system controls Jose Lockhartenergy_progress
01/20/2022Shutoff dampersJose Lockhartenergy_progress
01/20/2022HVAC and service water heating equipment Jose Lockhartenergy_progress
01/20/2022Maintenance informationJose Lockhartenergy_progress
01/19/2022Fire-Resistant Penetrations and JointsJose Lockhartspecial
01/19/2022Heating SystemsJose Lockhartspecial
01/19/2022Mechanical SystemsJose Lockhartspecial
01/19/2022FinalJose Lockhartprogress
01/19/2022Maintenance informationJose Lockhartenergy_progress
01/19/2022HVAC insulation and sealing Jose Lockhartenergy_progress
01/19/2022HVAC and service water heating system controls Jose Lockhartenergy_progress
01/19/2022HVAC and service water heating equipment Jose Lockhartenergy_progress
01/19/2022Shutoff dampersJose Lockhartenergy_progress
12/10/2021Standpipe SystemsJose Lockhartspecial
12/10/2021Fire-Resistant Penetrations and JointsJose Lockhartspecial
12/10/2021Sprinkler SystemsJose Lockhartspecial
12/10/2021HVAC insulation and sealing Jose Lockhartenergy_progress
12/10/2021Maintenance informationJose Lockhartenergy_progress
12/10/2021HVAC and service water heating system controls Jose Lockhartenergy_progress
12/10/2021HVAC and service water heating equipment Jose Lockhartenergy_progress
Latest 25 of 26.
224 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account