DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB02/22/2024FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB12/01/2023FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB11/02/2023FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB08/02/2023FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB05/02/2023FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB01/29/2020OCCUPIED 1 STORY COMM.BLDG W/BOWSTRING ROOF. WITHIN 60 DAYSOF DATE OF VIO,OWNER ENGAGE A NYS LICENSE PE EXPERIENCED W/WOOD TRUSES TO PROBE& EVALUATE STRUCTRL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATIONS C CALCULATIONS,PROBES ETC.EACH TRUSS&BEAM TO BE EVALUATED.SUBMIT REPORT W/INFORMATION&FINDINGS.ANY STRCTL DEFICIENCIES IMMED SHORED.RPR DWGS
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB09/10/2019FAILURE TO COMPLY WITH COMMISH ORDER #334110.THE BLDG IS A WAREHOUSE STRUCTURE WITH A WD BOWSTRING TRUSS ROOF.DOB SERVED YOU WITH A CURABLE COMMISH ORDER ON 1/29/19 TO PROVIDE AN ENGINEER'S REPORT ON YOUR BLDG NO ENGINEER'S REPORT HAS BEEN RECEIVED.COMPLY WITH COMMISSIONER'S ORDER #334110
DOB01/29/2019OCCUPIED 1 STORY COMMERCIAL BUILDING WITH A WOOD BOWSTRING ROOF WITHIN 60 DAYS DATE OF VIO, OWNER ENGAGE NYS LICENSE PE EXPERIENCED WITH WOOD TRUSSES TO PROBE&EVAL STRUCT SOUNDNESS OF BOWSTRING USING FIELD VERIFI CALCULAT PROBES EACH TRUSS&BEARINGS TO BE EVAL SUBMIT RPTANY STRUCT DEFICIENCES IMMED SHORED REPAIR DRAWINGS FILED W/DOB 45 DAY AFTER INSP
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB10/06/2017FAIL TO COMPLY W/COMMISSIONERS ORDER(DOB VIO#020116CFEU50109JH)YOU WERE SERVED W/COMMISSIONERS ORDER DATED 2/1/16 REQ YOU TO OBTAIN PERM AND BEG WORK AFTER PERM WAS OBTAINED.WORK WAS TO BE SIGNED OFF BY 7/1/16.THIS WORK WAS NOT DONE.REMEDY:COMPLY W/COMMISSIONERS ORDER
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB02/01/2016FM. WAREHOUSE TYPE STRUCTURE W/A BOWSTRING TRUSS ROOF.WE REC'D AN ENGINEERING REPORT PREPARED BY OLD STRUCTURES ENGINEERING ON 3/12/2015 THE REPORT RECOMMENDS REPAIRS TO THE WOOD BOWSTRING TRUSS ROOF. THERE ARE NO JOBS FILED W/DOB THAT ADRESSES THIS RECOMMENDATIO. REMEDY: REPAIR DWGS PREPARED BY A LIC PE ARE T/BE FILED W/DOB NO LTR 2/17/2016
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB07/16/2015FAILURE TO COMPLY
DOB07/15/2015FAILURE TO COMPLY W/COMMISSIONERS ORDER(VIO#031715FEU50102JH) YOU WERE SERVED WITH A COMMISSIONERS ORDER DATED 03/17/2015 REQUIRING YOU TO IMMEDIATELY ENGAGE A LIC ENGINEER & CONTRACTOR TO OBT PERMITS & INSTALL SHORING. THIS WORK WAS DONE. COMPLY WITH COMMISSIONERS ORDER
DOB03/17/2015FAILURE TO MAINTIAN.AS STATED COMPLAINT#5110320.REPORT BY OWNER ENG OLD STRUCTURE STATES THAT ROTTEN ENDS/TRUSSES SHOULD BE SHORED.TRUSSES NOTED 3:7.OWNER TO IMME.ENGAGE LICENSED ENGINEER/CONTRACTOR TO OBTAIN PERMIT & INSTALL SHORING PER ENGINEER RECOMMENDATIONS.NOTIFY FEU (JILL HRUBECKY) BY 3/31/15 TO CONFIRN COMPLETION OF SHORING INSTALLATION
DOB03/17/2015FAILURE TO MAINTAIN.AS STATED COMPLAIN#5110320 NOTES AREA WHERE STRUCTURE IS INADEQUATE TO SUPPORT DESIGN LOAD/AS WELL AS AREAS REQ REPAIR.OWNER TO ENGAGE LICENSED ENGINEER TO PREPARE DWGS TO EFFECT REPAIRS AND FILED WITH DOB NOLATER THAN 5/15/15.ALL WORK TO BE DONE UNDER PERMIT & WORK TO BEGIN NO LATER THAN 5/26/15
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB09/20/2014FAIURE TO COMPLY WITH A COMMISSIONER'S ORDER. THE BUILDING IS A WARE- HOUSE-TYPE STRUCTURE WITH A WOOD BOWSTRING TRUSS/ROOF. THE DEPARTMENT SERVED YOU WITH A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED
DOB06/03/201431 WAVE STREET IS AN OCCUPIED ONE STORY COMMERCIAL GARAGE W/ A WOOD BOWSTRING TRUSS ROOF. W/IN 60 DAYS OF VIOL, OWNER TO ENGAGE A NYS(LIC) PE EXP W/ WOOD TRUSSES TO PROBE & EVAL STRUCTURE. EACH TRUSS & BEARING TO BE EVAL. ANY DEFICIENCIES TO BE SHARED. FILE REPAIR DRWGS W/ DOB W/IN 45 DAYS AFTER THE INSPECTION
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
ECB03/24/2017AS PER CLASS 2 (B265) 28-303.7, FAILURE TO FILE A COMPLETE BOILER INSP REPORT AS PER DOB RECORDS, SUBMIT A CURRENT BO-9 REPORT.Nothing owed — awaiting certificate of correction