← Back
Elevator cooperative
31 WEST 12 STREET
MANHATTAN · Greenwich Village · BIN 1009627
💬 Discuss this project
1901Year Built
11.5Stories
D4Building Class
R6Zoning
44,586 sfGross Floor Area
23Units
LL97 CoveredRent Stabilized15 Open Violations 14 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 31 OPERATING CORP · 5,035 sf lot · 8.86 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEPRINE CONSTRUCTION907/08/2026
31 OPERATING7303/22/2026
COOPER SQUARE REALTY703/22/2026
31 OPERATION1403/21/2026
UNIT OWNER SHAREHOLDER403/21/2026
C/O COOPER SQUARE REALTY, INC.703/21/2026
31 OPERATING CO-OP303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KENDALL ENGINEERING PC212/16/2024
KZ ENGINEERING, P.C204/21/2022
JOSE M. LANDAURO, P.E.112/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KATZ ARCHITECTURE & PROJECT MANAGEM403/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
RIGHT WAY SERVICES NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor407/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
NY CITY ELECTRIC INCElectrical103/22/2026
TODARO JOSEPHElectrical103/21/2026
PNA CONTRACTING CORPGeneral Contractor104/09/2026
SYSTEMS 2000 PLBG SVCS LLPlumbing107/08/2026
Building Lifecycle
All (88)Filed (5)Permit Issued (4)Signed Off (4)Facade (FISP) (13)Violation (55)Inspection (2)Objection (2)Special Inspection (3)
05/21/2026
Cycle 10 facade report signed — SAFE
05/12/2026
Cycle 10 facade inspection completed
04/07/2026
Signed off — Alteration
Filing for brick masonry, roof repair ,waterproofing repairs as shown on drawings filed herewith. No change in use, egress or occupancy.
M00573357-I1
04/07/2026
Cycle 10 facade report submitted
02/24/2025
Signed off — Alteration
CONNECT NEW GAS PIPING TO A NEW GAS FIRE CLOTHES DRYER. DRYER TO CONNECT TO EXISTING DRYER VENT. NO EXTERIOR WORK.
M01087506-I1
01/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2024
Filed — Alteration
CONNECT NEW GAS PIPING TO A NEW GAS FIRE CLOTHES DRYER. DRYER TO CONNECT TO EXISTING DRYER VENT. NO EXTERIOR WORK.
M01087506-P1
12/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/09/2024
Permit issued — Plumbing
M01087506-I1-PL
08/09/2024
Filed — Alteration
CONNECT NEW GAS PIPING TO A NEW GAS FIRE CLOTHES DRYER. DRYER TO CONNECT TO EXISTING DRYER VENT. NO EXTERIOR WORK.
M01087506-I1
08/24/2022
Signed off — Alteration
M00696516-I1
08/24/2022
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00696523-I1
04/21/2022
Filed — Alteration
M00696516-I1
04/21/2022
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00696523-I1
04/21/2022
Permit issued — Sidewalk Shed
M00696516-I1-SH
04/21/2022
Permit issued — Supported Scaffold
M00696523-I1-SF
03/11/2022
Special inspection requirement — Final
Karol Zdancewicz
03/10/2022
Permit issued — General Construction
M00573357-I1-GC
12/14/2021
Objection raised — Inspections
12/14/2021
Objection resolved — Addressed
12/10/2021
Filed — Alteration
Filing for brick masonry, roof repair ,waterproofing repairs as shown on drawings filed herewith. No change in use, egress or occupancy.
M00573357-I1
08/25/2021
Special inspection requirement — Energy Code Compliance Inspections
JOSE LANDAURO
08/09/2021
Special inspection requirement — Final
JOSE LANDAURO
08/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/24/2021
Cycle 9 facade report signed — SWARMP
11/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2020
Cycle 9 facade report submitted
10/21/2020
Cycle 9 facade inspection completed
08/31/2020
Violation issued (ECB, closed)
Elevators
06/29/2020
Violation issued (ECB, closed)
Construction
10/23/2018
Violation issued (ECB, closed)
Construction
10/23/2018
Violation issued (ECB, closed)
Construction
07/16/2018
Violation issued (ECB, closed)
Local Law
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2017
Violation issued (ECB, open)
Construction
04/20/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/30/2014
Violation issued (HPD, open)
A
01/30/2014
Violation issued (HPD, open)
B
01/30/2014
Violation issued (HPD, open)
B
10/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/22/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/17/2012
Cycle 7 facade report submitted
02/14/2012
Cycle 7 facade report signed — SWARMP
02/09/2012
Cycle 7 facade inspection completed
07/14/2009
Cycle 6 facade report submitted
05/19/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/06/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/19/2007
Violation issued (ECB, closed)
Unknown
11/14/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2007
Violation issued (ECB, closed)
Construction
01/05/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/28/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/28/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2006
Cycle 6 facade report submitted
11/15/2006
Cycle 6 facade report signed — UNSAFE
10/31/2006
Cycle 6 facade inspection completed
02/02/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/15/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL10/09/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC04/21/2022
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC04/21/2022
DOB NOWGeneral ConstructionSigned-offPNA CONTRACTING CORP03/10/2022
BISOTISSUEDMULLINS INTERIORS LLC05/10/2019
BISPLISSUEDR.J.C. MECHANICAL CORP03/06/2019
BISOTISSUEDMULLINS INTERIORS LLC02/01/2019
BISEQISSUEDEVEREST SCAFFOLDING INC01/25/2019
BISEQISSUEDEVEREST SCAFFOLDING INC07/06/2018
BISPLISSUEDR.J.C. MECHANICAL CORP03/21/2018
BISOTISSUEDMULLINS INTERIORS LLC02/22/2018
BISMHISSUEDMULLINS INTERIORS LLC02/22/2018
BISEQISSUEDEVEREST SCAFFOLDING INC01/30/2018
BISOTISSUEDPC ASSOCIATES GROUP INC01/12/2018
BISPLISSUEDTW PLUMBING & HEATING INC10/11/2017
BISEQISSUEDEVEREST SCAFFOLDING INC07/20/2017
BISPLISSUEDACCURATE MECHANICAL INC03/09/2017
BISOTISSUEDPC ASSOCIATES GROUP INC03/07/2017
BISOTISSUEDPC ASSOCIATES GROUP INC03/07/2017
BISEQISSUEDEVEREST SCAFFOLDING INC02/03/2017
BISPLISSUEDTW PLUMBING & HEATING INC10/07/2016
BISOTISSUEDPC ASSOCIATES GROUP INC09/27/2016
BISOTISSUEDPC ASSOCIATES GROUP INC09/27/2016
BISPLISSUEDR.J.C. MECHANICAL CORP07/27/2016
BISMHISSUEDARAN CONSTRUCTION LLC06/27/2016
BISOTISSUEDARAN CONSTRUCTION LLC06/27/2016
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE01/04/2016
BISPLISSUEDACCURATE MECHANICAL INC08/07/2015
BISPLISSUEDDONATO INC06/19/2015
BISMHISSUEDARAN CONSTRUCTION LLC06/19/2015
BISOTISSUEDARAN CONSTRUCTION LLC06/19/2015
BISMHISSUEDARAN CONSTRUCTION LLC06/15/2015
BISOTISSUEDARAN CONSTRUCTION LLC06/15/2015
BISOTISSUEDROSE & STONE CONSTRUCTION11/20/2014
BISOTISSUEDROSE & STONE CONSTRUCTION11/19/2014
BISMHISSUEDSILVERSTEIN & ASSOCAITES10/14/2014
BISOTISSUEDSILVERSTEIN & ASSOCAITES10/14/2014
BISOTISSUEDSILVERSTEIN & ASSOCAITES10/14/2014
BISEQISSUEDARSENAL SCAFFOLD INC08/27/2014
BISOTISSUEDROSE & STONE CONSTRUCTION07/18/2014
+ 14 more permits on file
5 projects · most recent 03/19/2023
General Wiring
FiledStatusContractorScope
03/19/2023CompleteNY CITY ELECTRIC INC—
03/08/2023CompleteNY CITY ELECTRIC INC—
04/25/2022CompleteBOROWIDE ELECT'L CONTR'S—
02/21/2019Permit IssuedALEF ELEC'L CONTR'G INCGeneral Wiring
02/21/2019CompleteALEF ELEC'L CONTR'G INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/11/2022FinalKarol Zdancewiczprogress
08/25/2021Energy Code Compliance InspectionsJOSE LANDAUROprogress
08/09/2021FinalJOSE LANDAUROprogress
▾Documents — 481 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/02/2026M00696523-I1Request digital key ↗
09/02/2026M00696516-I1Request digital key ↗
08/25/2026M01087506-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits112
▸BISWORK PERMIT APPLICATION61
05/13/2019123658755Open ↗
05/13/2019123658755Open ↗
03/08/2019123658755Open ↗
Showing 3 of 61 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION48
08/04/2021122850352Open ↗
12/12/2019123658755Open ↗
12/10/2019123658755Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00573357-I1Open ↗
08/13/2026M01087506-I1Open ↗
08/13/2026M01087506-P1Open ↗
▸Seals & Professional Certifications87
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION53
01/24/2020140601695Open ↗
01/24/2020140670753Open ↗
01/24/2020140670753Open ↗
Showing 3 of 53 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
07/19/2017140670753Open ↗
02/02/2017140601695Open ↗
01/21/2016122648108Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
07/19/2017140670753Open ↗
02/02/2017140601695Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
07/19/2017140670753Open ↗
02/02/2017140601695Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026M00696523-I1Open ↗
08/25/2026M01087506-I1Open ↗
08/25/2026M01087506-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/21/2016122648108Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026M00573357-I1Open ↗
08/23/2026M00573357-I1Open ↗
08/22/2026M00696516-I1Open ↗
▸BISApplicant / Owner Signature2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment60
▸BISSELF-CERT PLUMBING NOTICE22
10/13/2015122371343Open ↗
07/16/2015140136519Open ↗
Showing 2 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
12/12/2019123658755Open ↗
12/10/2019123658755Open ↗
12/05/2019123658755Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS5
09/07/2021122850352Open ↗
03/25/2021122364565Open ↗
06/08/2017122731865Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
09/07/2021122850352Open ↗
03/25/2021122364565Open ↗
06/08/2017122731865Open ↗
Showing 3 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
01/29/2019123658755Open ↗
05/05/2016122731865Open ↗
▸Environmental & Asbestos25
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
01/29/2019123658755Open ↗
07/19/2017140670753Open ↗
06/19/2017122850352Open ↗
Showing 3 of 16 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026M01087506-I1Open ↗
08/25/2026M01087506-P1Open ↗
08/13/2026M00573357-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance39
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
01/21/2020123658755Open ↗
01/21/2020123658755Open ↗
04/15/2019122371343Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
08/18/2021122850352Open ↗
08/18/2021122850352Open ↗
03/25/2021122364565Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/18/2021122850352Open ↗
08/18/2021122850352Open ↗
03/25/2021122364565Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
02/02/2017140601695Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY14
08/18/2021122850352Open ↗
08/18/2021122850352Open ↗
03/25/2021122364565Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs40
▸BISLANDMARKS APPROVAL22
01/21/2020123658755Open ↗
03/28/2019123658755Open ↗
01/29/2019123658755Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
08/18/2021122850352Open ↗
03/25/2021122364565Open ↗
01/24/2020140601695Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/28/2019140601695Open ↗
01/28/2019140601695Open ↗
01/31/2018140601695Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT32
08/18/2021122850352Open ↗
03/25/2021122364565Open ↗
01/21/2020123658755Open ↗
Showing 3 of 32 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
07/01/2015122364565Open ↗
▸Filing & Intake Forms58
▸BISEFILING COVER SHEET22
01/29/2019123658755Open ↗
06/19/2017122850352Open ↗
06/19/2017122850352Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION18
08/28/2019123658755Open ↗
08/28/2019123658755Open ↗
05/17/2019122364565Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM11
01/24/2020140601695Open ↗
01/24/2020140670753Open ↗
01/21/2020123658755Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
07/19/2017140670753Open ↗
02/02/2017140601695Open ↗
Showing 2 of 7 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
06/19/2017122850352Open ↗