HPD09/14/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS AT COMMUNITY KITCHEN, 4th STORY, SECTION ''SOUTH''
HPD09/14/2026§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET AT COMMUNITY BATHROOM, 4th STORY, SECTION ''SOUTH''
HPD09/14/2026§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FEET AT BATHTUB WALLS AT COMMUNITY BATHROOM, 4th STORY, SECTION ''SOUTH''
HPD09/14/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ROOM LOCATED AT B-ROOM 4A, 4th STORY, 1st B-ROOM FROM EAST AT SOUTH
HPD09/14/2026§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT COMMUNITY KITCHEN, 4th STORY, SECTION ''SOUTH''
HPD09/14/2026§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST AND SOUTH WALLS AT COMMUNITY KITCHEN, 4th STORY, SECTION ''SOUTH''
HPD08/03/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD12/30/2024HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST
DOB05/20/2019FAILURE TO PERFORM CATEGORY 5 INSPECTION
ECB01/16/2024CLEAN HOIST MACHINE., SEAL HOIST MACHINE., PROVIDE UP TO DATE MAINTENANCE LOG BOOK (LAST LOG BOOK AVAILABLE 2021)., CLEAN PIT., REPAIR PIT LIGHT., REPAIR UNDER CAR LIGHT., REMOVE NOISE FROM GOVERNOR TENSION SHENothing owed — awaiting certificate of correction
ECB01/10/202042M07,37P16,54B12,55B12,56Y13,59BB07,68B07,70O02,71Q07,71X10,71M07,52B12,98BB05:42-M-07 NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLERAS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC.THIS A CONTROLNothing owed — awaiting certificate of correction
ECB03/08/2012905.3.1:REQUIRED STANDPIPE SYSTEM NOT INSTALLED. IN THE SEVEN STORIES SRO BUILDING A REQUIRED STANDPIPE SYSTEM IS NOT INSTALLED. REM:OBTAIN A PERMIT & INSTALL STANDPIPE SYSTEM.Nothing owed — awaiting certificate of correction
ECB03/07/2012FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER, WITNESS IN ADEQUATE SPRINKLER MAIN 3" INSTALLED FOR ESTIMATED 160 SPRINKLERS HEADS SYSTEM. ALSO NO SIAMESE CONNECTION PROVIDED & NO SPRINKLER COVERAGE FORNothing owed — awaiting certificate of correction