ECB03/05/2026AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED IN PLACE WITH ACTIVE PERMITS, AND INADEQUATE ILLUMINATION AS REQUIRED BY BC 3307.6.4.8. THIS CONDITION POSES A RISK OF INJURY TO THE PUBLIC AND INCREASES THE POTENT$10K due
ECB07/03/2024A.C.27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN EXI$3K due
ECB04/23/2024FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENCES. AS NOTED:-AT TIME OF INSPECTION I OBSERVED ON EXPOSURE #1 SOUTH ELEVATION:-MISSING/DEFECTIVE MORTAR JOINT ON THE 9TH FLOOR WATER TABLE/SILL. EXPOSURE$2K due
ECB02/22/2024FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES. AT TIME OF INSPECTION, I OBSERVED SPALLED BRICKS, DEFECTED MORTAR JOINTS, AT EXPOSURE(4) EAST ELEVATION VARIOUS LOCATIONS. AND CRACKED STUCCO, A HOLE ON WAL$1K due
ECB12/11/2023FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. OBSERVED AT EXPOSURE #1(SOUTH) CRACKED-SPALLED STONE MASONARY BETWEEN 5TH AND 6TH FLOOR AT SOUTH-EAST CORNER OF THE BUILDING. OPEN STONE JOINT AT$2K due
ECB04/21/2023AC 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FT OR MORE IN$3K due
DOB12/01/2022FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB04/29/2021FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB08/07/2020V-DOB VIOLATION - ACTIVE
ECB04/21/202027-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEE$2K due
ECB04/21/202027-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEE$2K due
DOB07/12/2008VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
ECB02/02/2026ATOI OBSERVED 5 NEW BATHROOMS AND 3 SINK SET UPS WITH COPPER PIPES EXPOSED. NEW WASTE LINES (CAST IRON PVC & COPPER) THROUGHOUT FLOORS 1-3.80% OF WORK COMPLETE. NO PLUMBING PERMIT ON FIE FOR SCOPE OF WORK., OBTHearing held — result not yet published
ECB02/02/2026ATOI OBSERVED NEWLY INSTALLED CORRUGATED STEEL, TRACK AND STUDS. NEW PARTITION WALLS/SHEET ROCK WALLS.35% OF WORK DONE. ALL WORK DONE ON FLOORS 1-3. NO PERMITS ON FILE FOR SCOPE OF WORK., OBTAIN PERMITHearing held — result not yet published
ECB02/20/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35682137J ISSUED ON 02/22/2024, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERTNothing owed — awaiting certificate of correction
ECB12/16/2022FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#902169.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB11/04/2022FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS AND APPURTENANCES.NOTE AT TIME OF INSPECTION OBSERVED AT EXP1 SOUT ELEVATION W34ST,CHIPPED/SPALLED STONE MASONRY BETWEEN 5TH AND 6TH FLOORS AT SOUTHEAST CORNER OF THENothing owed — awaiting certificate of correction