← Back
BuildNYC
Two family brick
310 6TH STREET
BROOKLYN · Park Slope · BIN 3021594
💬 Discuss this project
1901Year Built
3Stories
B1Building Class
R6BZoning
3,200 sfGross Floor Area
2Units
Rent Stabilized6 Active Violations ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHVAC installation17p · 4 filings · 20 docs
Floor 3HVAC installation36p · 4 filings · 20 docs
Floor 2HVAC installation41p · 4 filings · 20 docs
Floor 1HVAC installation52p · 5 filings · 20 docs
CellarHVAC installation36p · 3 filings · 20 docs
BasementHVAC installation25p · 3 filings · 20 docs
Sub-Basement6p · 2 filings · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/17/2019$2.7M—— → —$836/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jack Green Associates107/23/2025
Kimberly Peck Architect612/17/2024
Jjsa Design311/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Maryclare Nepogoda1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rainbow Home ImprovementGeneral Contractor1207/08/2026
DNA Plumbing ContractorsPlumbing807/08/2026
Plumbing P & HPlumbing507/02/2026
L.I. Newman ConsultingGeneral Contractor408/30/2026
A.S.H. ElectricElectrical103/21/2026
A.S.H. ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jack Green Associates422107/23/2025
Kimberly Peck Architect6812612/17/2024
J & M Inspections8017311/12/2024
Building Lifecycle
All (85)Filed (10)Permit Issued (11)Signed Off (3)Violation (8)Inspection (7)Objection (16)Special Inspection (30)
10/05/2026
Signed off — Alteration
Herewith file plumbing plans for conversion of existing three family dwelling to a two family dwelling, plumbing scope of work to include removal, relocation and installation of plumbing fixtures. GC filed under B00524700
B00524717-I1
09/18/2026
Signed off — Alteration
Installation of HVAC equipment floors cellar, 1,2,3, roof. with ductwork and piping
B01136018-I1
08/28/2026
Permit issued — Mechanical Systems
B01136018-I1-MS
05/20/2026
Permit issued — Plumbing
B68057746-I1-PL
04/30/2026
Violation issued (HPD, open)
A
02/11/2026
Signed off — Alteration
B00555150-I1
12/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2025
Objection raised — Mechanical
07/30/2025
Objection raised — Scope
07/30/2025
Objection raised — Cost
07/30/2025
Objection raised — Admin
07/23/2025
Filed — Alteration
Installation of HVAC equipment floors cellar, 1,2,3, roof. with ductwork and piping
B01136018-I1
06/05/2025
Violation issued (HPD, open)
A
02/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2025
Permit issued — General Construction
B00524700-I1-GC
02/04/2025
Permit issued — Plumbing
B68057746-I1-PL
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/18/2024
Special inspection requirement — Air barrier - visual inspection
kimberly peck
12/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
kimberly peck
12/18/2024
Special inspection requirement — Maintenance information
kimberly peck
12/18/2024
Special inspection requirement — Lighting in dwelling units
kimberly peck
12/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
kimberly peck
12/18/2024
Special inspection requirement — Fenestration air leakage
kimberly peck
12/17/2024
Filed — Alteration CO
herewith file plans to convert existing 3 family dwelling to a two family dwelling. Work to include general construction, obtain new Certificate of Occupancy. PL filed under B
B00524700-P3
12/16/2024
Special inspection requirement — Lighting in dwelling units
kimberly peck
12/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
kimberly peck
12/16/2024
Special inspection requirement — Air barrier - visual inspection
kimberly peck
12/16/2024
Special inspection requirement — Fenestration air leakage
kimberly peck
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
kimberly peck
12/16/2024
Special inspection requirement — Maintenance information
kimberly peck
12/13/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/20/2024
Filed — Alteration CO
herewith file plans to convert existing 3 family dwelling to a two family dwelling. Work to include general construction, obtain new Certificate of Occupancy. PL filed under B
B00524700-P2
11/12/2024
Filed — Alteration
B00555150-P2
11/01/2024
Special inspection requirement — Permanent certificate
LAWRENCE GREEN
11/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE GREEN
11/01/2024
Special inspection requirement — Mechanical Systems
LAWRENCE GREEN
11/01/2024
Special inspection requirement — Final
LAWRENCE GREEN
11/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE GREEN
11/01/2024
Special inspection requirement — Maintenance information
LAWRENCE GREEN
11/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE GREEN
11/01/2024
Special inspection requirement — Shutoff dampers
LAWRENCE GREEN
10/30/2024
Special inspection requirement — Lighting in dwelling units
kimberly peck
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
kimberly peck
10/30/2024
Special inspection requirement — Air barrier - visual inspection
kimberly peck
10/30/2024
Special inspection requirement — Maintenance information
kimberly peck
10/30/2024
Special inspection requirement — Fenestration air leakage
kimberly peck
10/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
kimberly peck
10/04/2024
Permit issued — General Construction
B00524700-I1-GC
09/04/2024
Objection resolved — Addressed
09/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
kimberly peck
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/09/2024
Objection raised — Scope
08/09/2024
Objection resolved — Addressed
08/09/2024
Objection raised — Scope
08/09/2024
Objection raised — Scope
08/09/2024
Objection raised — Scope
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offL.I. Newman Consulting08/28/2026
DOB NOWPlumbingSigned-offPlumbing P & H05/20/2026
DOB NOWGeneral ConstructionPermit IssuedL.I. Newman Consulting02/05/2025
DOB NOWPlumbingSigned-offPlumbing P & H02/04/2025
DOB NOWGeneral ConstructionPermit IssuedRainbow Home Improvement10/04/2024
DOB NOWGeneral ConstructionPermit IssuedRainbow Home Improvement10/12/2023
DOB NOWStructuralSigned-offRainbow Home Improvement04/07/2023
DOB NOWGeneral ConstructionPermit IssuedRainbow Home Improvement04/07/2023
DOB NOWPlumbingSigned-offDNA Plumbing Contractors01/26/2023
DOB NOWStructuralSigned-offRainbow Home Improvement07/07/2022
DOB NOWGeneral ConstructionPermit IssuedRainbow Home Improvement07/02/2022
1 project · most recent 07/23/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2025Signed-offL.I. Newman ConsultingHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×1
PEFY-PO8NMAU-E4 8,000 BTU · Ahu ×1
PEFY-[18NMAU-E4 18,000 BTU · Vrf Indoor ×1
PUMY-P60NKMU3(-BS) 60,000 BTU · Vrf Outdoor ×1
PUZ-A30NHA7(-BS) 30,000 BTU · Heat Pump Outdoor ×1
PVA-A30AA7 30,000 BTU · Ahu ×1
PVFY-P24NAMU-E 24,000 BTU · Vrf Indoor ×1
1 project · most recent 08/08/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/08/2024Signed-offDNA Plumbing ContractingGas, Water/Sanitary
2 projects · most recent 01/15/2025
General Wiring
FiledStatusContractorScope
01/15/2025CompleteA.S.H. ElectricGeneral Wiring
03/03/2023CompletePaul's ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/18/2024Air barrier - visual inspectionkimberly peckenergy_progress
12/18/2024Fire-Resistant Penetrations and Jointskimberly peckspecial
12/18/2024Maintenance informationkimberly peckenergy_progress
12/18/2024Lighting in dwelling unitskimberly peckenergy_progress
12/18/2024Fenestration and door U-factor and product ratingskimberly peckenergy_progress
12/18/2024Fenestration air leakagekimberly peckenergy_progress
12/16/2024Lighting in dwelling unitskimberly peckenergy_progress
12/16/2024Fenestration and door U-factor and product ratingskimberly peckenergy_progress
12/16/2024Air barrier - visual inspectionkimberly peckenergy_progress
12/16/2024Fenestration air leakagekimberly peckenergy_progress
12/16/2024Fire-Resistant Penetrations and Jointskimberly peckspecial
12/16/2024Maintenance informationkimberly peckenergy_progress
11/01/2024Permanent certificateLAWRENCE GREENenergy_progress
11/01/2024HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
11/01/2024Mechanical SystemsLAWRENCE GREENspecial
11/01/2024FinalLAWRENCE GREENprogress
11/01/2024HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
11/01/2024Maintenance informationLAWRENCE GREENenergy_progress
11/01/2024HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
11/01/2024Shutoff dampersLAWRENCE GREENenergy_progress
10/30/2024Lighting in dwelling unitskimberly peckenergy_progress
10/30/2024Fire-Resistant Penetrations and Jointskimberly peckspecial
10/30/2024Air barrier - visual inspectionkimberly peckenergy_progress
10/30/2024Maintenance informationkimberly peckenergy_progress
10/30/2024Fenestration air leakagekimberly peckenergy_progress
Latest 25 of 34.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00524717-I1Request digital key ↗
09/01/2026B00555150-P2Request digital key ↗
09/01/2026B00555150-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/23/2026B00524700-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026B00524700-I1Open ↗
09/01/2026B00524700-I1Open ↗
09/01/2026B00524700-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00524717-I1Open ↗
09/01/2026B00524717-P1Open ↗
09/01/2026B00555150-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00524717-I1Open ↗
09/01/2026B00524700-I1Open ↗
08/31/2026B00524700-P2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/23/2026B00524700-I1Open ↗
08/23/2026B00524700-P3Open ↗
08/23/2026B00524700-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00524700-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00524717-I1Open ↗
09/01/2026B00555150-I1Open ↗
09/01/2026B00555150-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/23/2026B00524700-I1Open ↗