← Back
BuildNYC
Predominantly retail with other uses
310 BUTLER STREET
BROOKLYN · BIN 3006617
💬 Discuss this project
1989Year Built
1Stories
K4Building Class
M1-4Zoning
10,000 sfGross Floor Area
2Units
1 Active Violation ▸
Predominantly retail with other uses · Owner of record: Butler St Realty · 10,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGowanus Fitness20p · 3 filings · 20 docs
Floor 1Gowanus Fitness38p · 5 filings · 20 docs
Site & exteriorDaikin accessory business sign installation1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Butler Street Realty703/21/2026
Navistone503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Florinela Muresan410/19/2022
Nathan Bright Architect208/16/2022
FAST+EPP102/23/2022
JWC Architect Engineering212/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Richard McElhiney Architects1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Shannon ContractingGeneral Contractor507/08/2026
Paul SignsSign hanger107/08/2026
S.E. Electl ContngElectrical103/22/2026
Best Plumbing & HVACFire Protection107/08/2026
Metrotech MechanicalPlumbing107/08/2026
Universal Fire SprinklerFire Protection107/08/2026
Best Plumbing & HVACPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MWB Engineering7942410/19/2022
Nathan Bright Architect P3016208/16/2022
Autographic Co1579102/23/2022
Grand Inspection & Consulting6792212/12/2019
Building Lifecycle
All (32)Filed (9)Permit Issued (10)Signed Off (4)Violation (2)Inspection (4)Special Inspection (3)
05/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/12/2025
Violation issued (ECB, closed)
Construction
04/12/2025
Violation issued (ECB, open)
Construction
11/18/2022
Signed off — Alteration
HVAC and ductwork in existing commercial first floor tenant. New HVAC on roof.
B00669699-I1
10/28/2022
Signed off — Alteration
Plumbing and sprinkler work in commercial first floor tenant.
B00669706-I1
10/19/2022
Filed — Alteration
Plumbing and sprinkler work in commercial first floor tenant.
B00669706-P2
10/19/2022
Special inspection requirement — Sprinkler Systems
FLORINELA MURESAN
10/13/2022
Special inspection requirement — Sprinkler Systems
FLORINELA MURESAN
10/11/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/05/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/05/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2022
Signed off — Alteration
B00669692-I1
09/22/2022
Permit issued — Mechanical Systems
B00669699-I1-MS
09/21/2022
Filed — Alteration
Plumbing and sprinkler work in commercial first floor tenant.
B00669706-P1
09/21/2022
Special inspection requirement — Sprinkler Systems
FLORINELA MURESAN
09/20/2022
Permit issued — General Construction
B00668756-I1-GC
08/16/2022
Filed — Alteration CO
B00668756-I1
07/13/2022
Signed off — Alteration
B00669711-I1
03/23/2022
Permit issued — Plumbing
B00669706-I1-EW-SP
03/21/2022
Permit issued — Plumbing
B00669706-I1-PL
03/17/2022
Permit issued — Structural
B00669711-I1-ST
03/16/2022
Permit issued — General Construction
B00669692-I1-GC
03/16/2022
Permit issued — Mechanical Systems
B00669699-I1-MS
02/25/2022
Filed — Alteration
B00669692-I1
02/23/2022
Filed — Alteration
B00669711-I1
02/16/2022
Filed — Alteration
HVAC and ductwork in existing commercial first floor tenant. New HVAC on roof.
B00669699-I1
02/16/2022
Filed — Alteration
Plumbing and sprinkler work in commercial first floor tenant.
B00669706-I1
02/24/2020
Permit issued — Sign
B00267034-I1-SG
12/12/2019
Filed — Alteration
B00267034-I1
12/06/2019
Permit issued — Sprinklers
B00261155-I1-EW-SP
12/06/2019
Permit issued — Plumbing
B00261155-I1-PL
11/20/2019
Filed — Alteration
B00261155-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offShannon Contracting09/22/2022
DOB NOWGeneral ConstructionPermit IssuedShannon Contracting09/20/2022
DOB NOWSprinklersSigned-offUniversal Fire Sprinkler03/23/2022
DOB NOWPlumbingSigned-offMetrotech Mechanical03/21/2022
DOB NOWStructuralSigned-offShannon Contracting03/17/2022
DOB NOWGeneral ConstructionSigned-offShannon Contracting03/16/2022
DOB NOWMechanical SystemsSigned-offShannon Contracting03/16/2022
DOB NOWSignPermit IssuedPaul Signs02/24/2020
DOB NOWSprinklersPermit IssuedBest Plumbing & HVAC12/06/2019
DOB NOWPlumbingPermit IssuedBest Plumbing & HVAC12/06/2019
BISOTISSUEDSiteline Construction11/18/2019
BISPLISSUEDQMB Plumbing & Heating01/28/2015
BISOTISSUEDCam Fuel02/15/2012
1 project · most recent 11/16/2022
General Wiring
FiledStatusContractorScope
11/16/2022CompleteS.E. Electl ContngGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/11/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/05/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/05/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/19/2022Sprinkler SystemsFLORINELA MURESANspecial
10/13/2022Sprinkler SystemsFLORINELA MURESANspecial
09/21/2022Sprinkler SystemsFLORINELA MURESANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Gowanus FitnessFitness / RecreationFloor 1, Roof
Project B00669699 Alteration · LOC Issued · 02/16/2022
Project B00669706 Alteration · LOC Issued · 02/16/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
08/31/2026B00669699-I1Request digital key ↗
08/31/2026B00669706-P1Request digital key ↗
08/31/2026B00669706-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00261155-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00267034-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00261155-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION6
11/19/2019322006217Open ↗
01/23/2015340216858Open ↗
02/21/2012320417848Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
06/18/2020320417848Open ↗
11/13/2019322006217Open ↗
01/23/2015340216858Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD - Permit Notice1
08/13/2026B00668756-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00267034-I1Open ↗
08/31/2026B00669706-I1Open ↗
08/31/2026B00669706-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/13/2019322006217Open ↗
05/04/2015340216858Open ↗
01/17/2012320417848Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/25/2026B00669706-I1Open ↗
08/28/2026B00669706-P1Open ↗
08/28/2026B00669706-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/13/2019322006217Open ↗
01/23/2015340216858Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/13/2019322006217Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/23/2015340216858Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/17/2012320417848Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/23/2015340216858Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
01/23/2015340216858Open ↗
01/14/2012320417848Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/04/2015340216858Open ↗
▸BISSCHEDULE B - PLUMBING1
01/23/2015340216858Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/28/2026B00668756-I1Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026B00669706-P2Open ↗
08/31/2026B00669706-P1Open ↗
08/31/2026B00669706-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/13/2026B00669692-I1Open ↗
08/13/2026B00669699-I1Open ↗
08/13/2026B00669711-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026B00669699-I1Open ↗
08/13/2026B00669706-I1Open ↗
08/13/2026B00668756-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/13/2019322006217Open ↗
01/23/2015340216858Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/17/2012320417848Open ↗
▸Energy Compliance9
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00668756-I1Open ↗
08/13/2026B00669699-I1Open ↗
08/13/2026B00669692-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/13/2019322006217Open ↗
05/04/2015340216858Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/04/2015340216858Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/23/2015340216858Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/23/2015340216858Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/14/2012320417848Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/28/2015340216858Open ↗
01/23/2015340216858Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
01/23/2012320417848Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/04/2015340216858Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/04/2015340216858Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
11/13/2019322006217Open ↗
05/04/2015340216858Open ↗
01/23/2015340216858Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
11/13/2019322006217Open ↗
01/17/2012320417848Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/23/2015340216858Open ↗